Indicate by check mark whether the registrant by furnishing the
information contained in this Form is also thereby furnishing the
information to the Commission pursuant to Rule 12g3-2(b) under
the Securities Exchange Act of 1934.
Yes ______ No ___X___
Supplementary Disclosure UNAUDITED
In accordance with Novo Mercado requirements, we are presenting the summary of differences between the Brazilian Corporate Law and and U.S. GAAP.
1
SUMMARY OF DIFFERENCES BETWEEN BR CL AND US GAAP
The Companys statutory financial statements, which are used as the basis for determining income taxes and mandatory minimum dividend calculations, have been prepared in accordance with accounting practices adopted in Brazil, which are based on the Brazilian Corporate Law (Law No. 6,404/76, as amended), the rules and regulations of the Brazilian Securities Commission ("CVM") and the accounting standards issued by the Brazilian Institute of Independent Auditors (IBRACON), collectively referred to hereinafter as Corporate Law or BR CL.
The Companys primary financial statements have been prepared in accordance with BR CL which differs significantly from principles generally accepted in the United States of America (US GAAP). as described below:
(a) Inflation accounting methodology and indices
In Brazil, because of highly inflationary conditions which prevailed in the past, a form of inflation accounting had been in use for many years to minimize the impact of the distortions in financial statements caused by inflation. Two methods of inflation accounting were developed: one required under BR CL; and the other known as the Constant Currency Method. The primary difference between BR CL and the Constant Currency Method relates to accounting for the effects of inflation. Under BR CL, inflation accounting was discontinued effective January 1, 1996. Prior to that date, BR CL required inflationary indexation of property, plant and equipment, investments, deferred charges and shareholders' equity, the net effect of which was reported in the statement of operations as a single line item. The Constant Currency Method is similar to U.S. Accounting Principles Board Statement No. 3 ("APS 3"), except that the former continues to apply inflationary accounting in periods of low inflation. Under US GAAP, the Brazilian economy ceased to be highly inflationary effective July 1, 1997. The other significant difference between the two sets of principles relates to the present-value discounting of fixed-rate receivables and payables, which is required by the Constant Currency Method and is prohibited under BR CL.
Financial statements prepared in accordance with BR CL have been, and continue to be, required of all Brazilian corporate entities and are used by the Brazilian tax authorities in determining taxable income. Financial statements prepared in accordance with the constant currency method were required through 1995 for those entities whose securities were registered with the CVM. Since 1996, presentation of supplemental financial statements under the Constant Currency Method has been optional.
(i) Additional inflation restatement in 1996 and 1997 for US GAAP
In the reconciliation from BR CL to US GAAP, consistent with the position paper prepared by the U.S. AICPA International Practice Task Force, an adjustment for inflation accounting has been included for the period from January 1, 1996 to December 31, 1997. During this period, inflation accounting was prohibited by BR CL but was required by APB statement 3 under US GAAP. Shareholders' equity under US GAAP was increased by R$1,103,962 and R$ 1,171,576 at December 31, 2007 and 2006, respectively, due to the additional inflation restatement adjustments.
(ii) Supplementary inflation restatement replaces revaluation of property, plant and equipment for US GAAP
The price-level restatement methodology under BR CL relied on an official inflation index announced by the Brazilian Federal government which was also used for purposes of determining taxes payable. Shortly after the launch of an economic stabilization plan in 1990, the government announced an inflation rate for that year which was materially understated in relation to the general and consumer price indexes as measured by independent economic institutes. In 1991, the government acknowledged this distortion and companies were required to re-present their statutory financial statements using a revised inflation index and the effects thereof were also used to determine income taxes, retroactively. The same law (Law No. 8,200/91) also granted companies the option (and the CVM required adoption when the effects were significant) to reprocess the accumulated inflation accounting effects since the date of acquisition of assets based on an independently sourced consumer or general price index. This supplemental indexation of property, plant and equipment, investments and deferred charges was to be recorded in the statutory BR CL accounting books but would have no effect for tax purposes. The Company anticipated the effects of this measure by contracting an independent firm of experts to perform an appraisal to market value of its property, plant and equipment and recorded the revaluation increment in its statutory BR CL accounting records, without affecting its tax position, in much the same way as Law No. 8,200/91 later required. As the revaluation increment had eliminated the effects of the supplemental price-level restatements, no further action was taken and the Company did not apply the incremental indexation.
Under US GAAP, revaluations of assets to market value are not permitted and the effects of the revaluation have been reversed in the reconciliation to US GAAP. However, in order to preserve the integrity of the historical cost of its assets based on the price-level restatement convention adopted by BR CL, the Company has recorded the supplemental price-level restatement adjustments, in accordance with Article 2 of Law No. 8,200/91, as an adjusting item in the reconciliation to US GAAP. The Company has presented the balances of shareholders' equity and net income under BR CL, adjusted for the effects of the revaluation and the replacement of the reversal by the supplemental price-level restatements, and related tax effects, as a subtotal, prior to presenting the reconciling items to US GAAP. The subtotal also includes the effects of including an additional two years' inflation accounting adjustments through to 1997 for purposes of US GAAP.
Shareholders' equity under US GAAP was increased by R$ 2,705,277 and R$ 2,806,638 at December 31, 2007 and 2006, respectively, due to the supplementary inflation restatement adjustments and reduced by R$ 2,339,829 and R$ 2,427,499 at December 31, 2007 and 2006, respectively, due to the reversal of the revaluations, before tax effects.
2
(iii) Inflation indexes
The indexation of the financial statements through 1995, except for the year 1990, under BR CL was based on an official government index, the Unidade Fiscal de Referência - UFIR and for the year ended December 31, 1990 on a consumer price index (Indice de Preços ao Consumidor, or IPC). For purposes of US GAAP, a general price index, the Indice Geral de Preços - Mercado, or IGP-M, was used to record the additional inflation restatement in 1996 and 1997 and the supplementary inflation restatement through 1995.
(b) Income taxes and social contribution
Under BR CL, deferred tax assets are recognized at the estimated amounts that management considers are probable to be recovered. In addition, deferred income taxes are shown gross rather than net.
Under US GAAP, deferred taxes are recorded on all temporary tax differences. Valuation allowances are established when it is more likely than not that deferred tax assets, including tax loss carryforwards, will not be recovered. Deferred tax assets and liabilities are classified as current or long-term based on the classification of the asset or liability underlying the temporary difference, and are presented net.
For purposes of deferred tax accounting, the US GAAP adjustments relating to inflation restatement of land and the push-down expenses from the Plan G0 pension fund (j)(ii) below and sabbatical paid leave benefits are treated as permanent tax differences, as such items are not deductible for tax purposes by the Company.
Taxes on income in Brazil consist of two types of taxes: income tax and social contribution. In Brazil, the tax law and tax rates are sometimes significantly altered by provisional measures ("medidas provisórias") announced by Presidential decree. The provisional measures can affect tax rates as well as other areas that could impact deferred taxes. Until September 2001, these measures remained in force for one month and expired automatically if they were not extended for an additional one-month period. In September 2001 all provisional measures were automatically enacted, and the Presidential decree powers restricted. Under BR CL, when calculating deferred income taxes, the provisional measures are usually taken into account.
Under US GAAP, only enacted tax rates may be used to calculate deferred taxes. Tax rates for future periods which have been established by provisional measures are not considered to have been enacted and are ignored. However, the provisional measure, to the extent it has not lapsed, is used for determining the amount of current tax payable.
Shareholders' equity under US GAAP was reduced by R$ 1,281,468 and R$ 1,356,545 at December 31, 2007 and 2006, respectively, due to deferred tax adjustments on US GAAP differences, excluding revaluations and permanent differences related to monetary readjustment on land of approximately R$ 150 million.
No valuation allowance adjustments were required to be included in the reconciliation between BR CL and US GAAP.
(c) Financial instruments and concentration of credit risk
Under BR CL, there are less detailed requirements regarding the disclosure of information on financial instruments not reflected on the balance sheet or on concentration of financial instruments with credit risk.
Under US GAAP, the applicable accounting practice for financial instruments depends on management's intention for their disposition and requires adjustments to their market or fair values. Additional information on face or contract or notional principal amount; nature and terms including (i) credit and market risk, (ii) cash requirements and (iii) accounting policy followed; amount of loss, if any party to the financial instrument fails to perform; and policy as to requiring collateral is required. Disclosure as to concentration of credit risk arising from all financial instruments is required to include information about the activity, region or other characteristic that identifies the concentration; amount of loss if parties to the concentrated risk fail to completely perform; and policy as to requiring collateral.
Statement of Financial Accounting Standards ("SFAS") No. 133, "Accounting for Derivative Instruments and Hedging Activities" of the U.S. Financial Accounting Standards Board (FASB) establishes accounting and reporting standards for derivative instruments and for hedging activities. It requires that an entity recognize all derivatives as either assets or liabilities and measure those instruments at fair value. This statement was effective January 1, 2001 and did not have a significant impact on the Companys financial statements.
No adjustments have been included in the reconciliation from BR CL to US GAAP.
(d) Cash and cash equivalents
Under BR CL, cash equivalents are not defined.
Under US GAAP, SFAS No. 95, "Statement of Cash Flows", defines cash equivalents as short-term highly liquid investments that are both (i) readily convertible to known amounts of cash and (ii) so near their maturity that they present insignificant risk of changes in value because of changes in interest rates. Generally, only investments with original maturities of three months or less qualify under that definition
The Company holds certain highly liquid, low risk financial investments, comprised principally of high quality government debt, which are classified as cash equivalents under BR GAAP. Although the investments have high level of liquidity and present insignificant risks of changes in value, under US GAAP, since these investments have original maturities of over 90 days, such investments do not qualify as cash equivalents.
3
There are also, some securities with donor-imposed restrictions that are presented as Cash and cash equivalents under BR CL. These securities, under US GAAP, must be classified as restricted cash and the classification on the Cash Flow Statement must be related to the nature of the restriction.
The effect of these differences in classification on the Companys balance sheets and statements of cash flows for the periods presented are as follows:
2007 | 2006 | |||
(unaudited) | ||||
Cash and cash equivalents under Brazilian GAAP | 464,997 | 328,206 | ||
Difference in classification of restricted cash | (7,657) | - | ||
Difference in classification of temporary investments | - | - | ||
Cash and cash equivalents under US GAAP | 457,340 | 328,206 |
Cash Flows | 2007 | 2006 | 2005 | |||
(unaudited) | (restated) | |||||
Operating activities under Brazilian GAAP | 2,215,600 | 2,020,824 | 1,737,575 | |||
Cash flows relating to short -term investments under US GAAP | - | 155,783 | (99,815) | |||
Operating activities under US GAAP | 2,215,600 | 2,176,607 | 1,637,760 | |||
Financing activities under Brazilian GAAP | (1,197,113) | (1,122,755) | (919,733) | |||
Cash flows relating to restricted cash under US GAAP | (7,657) | - | - | |||
Financing activities under US GAAP | (1,204,770) | (1,122,755) | (919,733) |
Cash and cash equivalents at beginning of the year | ||||||
under Brazilian GAAP | 328,206 | 280,173 | 105,557 | |||
Difference in classification of temporary investments | ||||||
at beginning of the year | - | (155,783) | (55,968) | |||
Cash and cash equivalents at beginning of the year | ||||||
under US GAAP | 328,206 | 124,390 | 49,589 | |||
Increase in cash and cash equivalents under Brazilian | ||||||
GAAP | 136,791 | 48,033 | 174,616 | |||
Cash flows relating to short -term investments under US GAAP | - | 155,783 | (99,815) | |||
Cash flows relating to restricted cash under US GAAP | (7,657) | - | - | |||
Cash and cash equivalents at end of year under US | ||||||
GAAP | 457,340 | 328,206 | 124,390 |
(e) Investments in debt and equity securities
Under BR CL, marketable debt and equity securities are generally stated at the lower of inflation-indexed amortized cost or market value less interest or dividends received. Gains and losses are reflected in earnings.
Under US GAAP, in accordance with SFAS No. 115, "Accounting for Certain Investments in Debt and Equity Securities", the accounting and reporting for investments in equity securities that have readily determinable fair values and for all investments in debt securities is as follows:
(i) |
Debt securities that the enterprise has the positive intent and ability to hold to maturity are classified as held-to-maturity securities and are reported at amortized cost. |
|
(ii) |
Debt and equity securities that are bought and held principally for the purpose of selling them in the near term are classified as trading securities and reported at fair value, with unrealized gains and losses included in earnings; |
|
(iii) |
Debt and equity securities not classified as either held to maturity or trading securities are classified as available for sale securities and reported at fair value, with unrealized gains and losses excluded from earnings and reported in a separate component of shareholders' equity For purposes of US GAAP, certain unrealized gains and losses from the Companys available-for-sale securities are recorded directly in shareholders' equity, net of tax effects, until realized. Shareholders' equity under US GAAP was increased by R$ 88 and reduced by R$ 93 on December 31, 2007 and 2006, respectively, for unrealized gain/losses from available- for-sale securities. |
|
(f) Property, plant and equipment
4
(i) |
Revaluations of property, plant and equipment. BR CL permits appraisal write-ups, provided that certain formalities are complied with. The revaluation increment is credited to a reserve account in shareholders' equity. Depreciation of the asset revaluation increments is charged to income and an offsetting portion is relieved from the revaluation reserve in shareholders' equity and transferred to retained earnings as the related assets are depreciated or are disposed For US GAAP reconciliation purposes, net revaluation of property, plant and equipment in the amounts of R$ 2,339,829 and R$ 2,427,499 at December 31, 2007 and 2006, respectively, have been eliminated in order to present property, plant and equipment at historical cost, indexed for inflation through 1997 based on a general price index, less accumulated depreciation. The depreciation on such revaluation charged to income, totaling R$87,670, R$102,272 and R$ 89,449 for the years ended December 31, 2007, 2006 and 2005, respectively, has also been eliminated for US GAAP purposes in the reconciliation of net income. Under BR CL, no deferred tax liability was recorded on the revaluation increment. Under US GAAP, although the depreciation from the additional inflation restatement ((a)(i) above) and the supplementary inflation restatement ((a)(ii) above) will not be deductible for tax purposes, these depreciation charges are considered to be temporary tax differences as the expense will reverse through income in the future, and, as such, are recorded for purposes of determining deferred tax liabilities. |
|
(ii) |
Different criteria for capitalizing and depreciating capitalized interest
Under BR CL, until December 31, 1995, capitalization of interest cost incurred during the construction period as part of the cost of the related property, plant and equipment was not required. However, as permitted by the Brazilian Water and Sewage Plan (Plano Nacional de Saneamento Básico - PLANASA), SABESP capitalized interest on construction-in-progress through 1989. Also, under BR CL as applied to companies in the utilities industry, during the period from 1979 to 1985, a notional interest rate was applied to construction-in-progress computed at the rate of 12% per annum of the balance of construction-in-progress; that part which related to interest on third-party loans was credited to interest expense based on actual interest costs with the balance relating to the self-financing portion being credited to capital reserves. Beginning in 1999, SABESP has capitalized indexation charges on the real - denominated loans and financing and the foreign exchange effects on foreign currency loans and financing. Under US GAAP, in accordance with SFAS No. 34, "Capitalization of Interest Cost", interest incurred on borrowings is capitalized to the extent that borrowings do not exceed construction-in-progress. Such interest is capitalized as part of the cost
of the related assets with a corresponding credit to financial expenses. Under US GAAP, the amount of interest capitalized excludes the indexation charges associated with the borrowings and the foreign exchange gains and losses on foreign currency
borrowings. |
2007 | 2006 | |||
(unaudited) | ||||
Interest capitalized under US GAAP in the period from 1989 to 1995 | 205,459 | 206,227 | ||
Amortization thereof | (112,683) | (105,964) | ||
Capitalized interest credited to income under BR CL (12% per annum, applied monthly to the balance of construction-in progress) in excess of actual interest | (32,448) | (32,569) | ||
Amortization thereof | 30,245 | 29,188 | ||
Indexation charges and foreign exchange losses capitalized since 1999 under BR CL, net | 93,165 | 50,576 | ||
US GAAP difference in shareholders' equity at December 31 | 183,738 | 147,458 | ||
US GAAP difference on pre-tax income for the year ended December 31 | 36,280 | 16,024 | ||
(iii) |
Valuation of long-lived assets |
|
Under BR CL, companies are required to determine if operating income is sufficient to absorb the depreciation or amortization of long-lived assets, within the context of the balance sheet as a whole, in order to assess potential asset impairment. As
it pertains to property, plant and equipment, in the event that such operating income is insufficient to recover the depreciation due to their permanent impairment, the assets, or groups of assets, are written-down to recoverable values, preferably,
based on the projected discounted cash flows of future operations. |
||
Under US GAAP, SFAS No. 144, "Accounting for the Impairment or Disposal of Long-lived Assets", requires companies to periodically evaluate the carrying value of long-lived assets to be held and used, and for long lived assets to be disposed of, when
events and circumstances require such a review. The carrying value of long-lived assets is considered impaired when the anticipated undiscounted cash flows from identified assets, representing the lowest level for which identifiable cash flows
largely independent of the cash flows of other groups of assets and liabilities, is less than their carrying value. In that event, a loss is recognized to the extent that the carrying value exceeds the fair market value of the assets. |
5
No adjustment has been included in the reconciliation from BR CL to US GAAP to take account of differences between the measurement criteria, as based on analysis of cash flows measured at the smallest unit of assets groups for which cash flow data
is captured no impairment provisions were required. Losses recognized on the write-off of property, plant and equipment arose primarily from adjustments related to the withdrawal of concession assets, construction-in-progress projects which were
deemed to be no longer economically feasible and obsolescence write offs. |
(g) Deferred charges
Under BR CL deferral of feasibility study costs and pre-operating expenses incurred in the construction or expansion of a new facility is permitted until such time as the facility begins commercial operations. Deferred charges are amortized over a period of five to ten years.
Under US GAAP, such amounts do not meet the conditions established for deferral and accordingly are charged to income as incurred.
The balance of feasibility study costs outstanding, amounted to R$ 3,474 and R$ 10,035 at December 31, 2007 and 2006, respectively, was written-off for US GAAP purposes. The net effects from amortization and deferrals in the statement of operations at December 31, 2007, 2006 and 2005 were an increase of R$ 6,561, R$ 10,496 and R$ 18,566 respectively.
(h) Pension benefits
Under BR CL, prior to 2002, amounts related to the pension plan were recorded on an accrual basis as the obligations for contributions fell due. In accordance with a new accounting standard issued by IBRACON and approved by the CVM, effective January 1, 2002, Brazilian public companies must account for pension obligations based on actuarial calculations and provide certain disclosures related to their pension plans. Under the new standard, the actuarial pension obligation determined at the date of adoption could be either recorded directly in shareholders equity, or prospectively, during the five-year period ending December 31, 2006 in results of operations. As permitted, the Company has elected to recognize this transition obligation on a straight-line basis through income over five years beginning in 2002. The amortization of the liability is being presented as an Extraordinary item in the statements of operations, net of applicable tax effects.
Under US GAAP, the Company accounts for its pension plans in accordance with the provisions of SFAS No. 87, "Employers' Accounting for Pensions," which among other requirements, requires that the Company recognize the actuarially-determined liability of its pension plan obligations. SFAS No. 87 also requires that an additional liability (minimum pension liability) is required to be recorded when the accumulated benefit obligation exceeds the fair value of the plan assets, less accrued pension amounts. This additional minimum liability is recorded as a charge to accumulated other comprehensive income in equity.
SFAS No. 132 (revised 2003), Employers' Disclosures about Pensions and Other Postretirement Benefits sets forth the requirements for information that must be disclosed with respect to the Companys pension plans.
After the issuance of SFAS 158 Employers Accounting for Defined Benefit Pension and Other Postretirement Plans an amendment of FASB Statements No. 87, 88, 106, and 132(R), in September 2006, an employer is required to recognize the overfunded or underfunded status of a defined benefit postretirement plan (other than a multi-employer plan) as an asset or liability in its statement of financial position and to recognize changes in that funded status in the year in which the changes occur through comprehensive income of a business entity or changes in unrestricted net assets of a not-for-profit organization. This Statement also requires an employer to measure the funded status of a plan as of the date of its year-end statement of financial position, with limited exceptions.
Another requirement of the statement is that the employer must disclose in the notes to financial statements additional information about certain effects on net periodic benefit cost for the next fiscal year that arise from delayed recognition of the gains or losses, prior service costs or credits, and transition asset or obligation. An employer with publicly traded equity securities is required to initially recognize the funded status of a defined benefit postretirement plan and to provide the required disclosures as of the end of the fiscal year ending after December 15, 2006.
The additional adjustments required by the SFAS 158 has been made after the accounting according to the SFAS 87 and SFAS 132.
Although the adopted accounting standard under BR CL requires the Company to recognize pension obligation based on actuarial methods effective January 1, 2002, differences under BR CL related to the prescribed actuarial methods, date of first adoption and amortization of transition obligations, among others, as compared with those under US GAAP, generate reconciling adjustments for US GAAP purposes.
(i) | Pension plan (Plan G1) |
The Company sponsors a defined-benefit plan for its employees (Plan G1). For the purposes of calculating the funded status of Plan G1, the provisions of SFAS No. 87, were applied with effect from January 1, 1992, because it was not feasible to apply them from the effective date specified in the standard.
(ii) | Supplementary pension plan (Plan G0) |
Pursuant to a law enacted by the State Government, certain employees who provided service to the Company prior to May 1974 and retired as an employee of the Company acquired a legal right to receive supplemental pension payments (which rights are referred to as Plan G0). The Company pays these supplemental benefits on behalf of the State Government and makes claims for reimbursement from the State Government, which are recorded as accounts receivable, shareholder under BR CL. No expense is recognized for these benefits under BR CL.
6
Consistent with the guidance in SEC Staff Accounting Bulletin Topic 5-T ("SAB No. 5-T"), under US GAAP, the Company recognizes the costs and obligations associated with Plan G0 supplemental pension benefits incurred by the State Government on behalf of the Company with respect to its employees on a push-down basis, as the Company is the recipient of the benefits of the employee service for which the supplemental pension benefits are made. These benefits are accounted for in accordance with SFAS No. 87. Eventual amounts received as reimbursement from the State Government, if any, are treated as additional paid-in-capital.
Retained earnings was reduced in the first year of presentation (1998) for the actuarial liability computed under SFAS No. 87. and the balance of amounts due from the State Government for pensions paid was charged to income, as this amount relates to a charge for past services rendered by the Companys former employees. Amounts reimbursed to the Company by the State Government were accounted for as additional paid-in capital and a reduction of the actuarial liability to reflect gross benefits paid. The remaining unpaid reimbursable balance due from the State Government (effectively a subscription receivable) was charged off as a deduction to shareholders' equity.
(iii) | Sabbatical paid leave |
The Company also pays amounts equivalent to three months of vacation for each five years' of service as a form of sabbatical paid leave to certain of the Companys employees for which it also claims reimbursement from the State Government. Consistent with the guidance in SAB Topic 5-T, under US GAAP the Company recognizes the costs and obligations associated with these sabbatical leave benefits incurred by the State Government on behalf of the Company with respect to its employees on a push-down basis, as the Company is the recipient of the benefits of the employee service for which the supplemental pension benefits are made. The Company has accounted for this sabbatical expense by relieving directly against retained earnings for the first year presented and subsequently the Company recognized as a charge to income the receivable due from the State Government, for sabbatical leave paid, as this amount relates to a charge for past services rendered by the Companys former/current employees. Amounts reimbursed by the State Government, if any, are accounted for as additional paid-in capital.
During the year ended December 31, 2000, in the financial statements prepared in accordance with BR CL, sabbatical leave accruals totaling R$ 23,747, which had in prior years been charged to income, and were accounted for as a receivable (reimbursement) due from the State Government, were reversed, as the Company does not consider this to be an expense under BR CL. Similarly, during December 31, 2007, 2006 and 2005, total amounts not accrued were R$1,319, R$ 1,991 and R$ 968, respectively. Such amounts, consistent with the US GAAP difference mentioned above, were pushed down as expenses in the reconciliation to US GAAP.
(iv) | Summary of pension benefits adjustments |
The effects included in the shareholders' equity reconciliation arising from these different criteria for pension and benefit accounting are presented below:
2007 | 2006 | |||
(unaudited) | ||||
Plan G1 | ||||
Accrued pension liability under US GAAP (SFAS 87) | (655,545) | (644,760) | ||
Accrued pension liability under BR CL | 365,234 | 321,212 | ||
Difference Plan G1 (SFAS 87) | (290,311) | (323,548) | ||
Incremental Effect of Applying SFAS Nº 158 | 238,422 | 361,450 | ||
Difference Plan G1 | (51,889) | 37,902 | ||
Plan G0 | ||||
Accrued pension cost under US GAAP (SFAS 87) | (1,192,624) | (1,156,492) | ||
Incremental Effect of Applying SFAS Nº 158 | (45,043) | (87,575) | ||
Difference Plan G0 | (1,237,667) | (1,244,067) | ||
Sabbatical paid leave | ||||
Recognition of reversed expense (i) (iii) | (7,246) | (8,565) | ||
Push-down accounting of Plan G0 and sabbatical | ||||
Paid leave | ||||
Gross amount paid for Plan G0 and sabbatical paid leave | ||||
recorded as receivables from the State | ||||
Government (i) | (994,047) | (889,425) | ||
Additional paid-in capital - Plan G0 and sabbatical | ||||
paid leave reimbursed by the State Government (i) | 114,970 | 114,970 | ||
7
The effects included in the reconciliation of net income (los) arising from these different criteria for pension and benefit accounting are presented bellow:
2007 | 2006 | 2005 | ||||
(unaudited) | ||||||
Plan G1 | ||||||
Accrued pension obligation Plan G1 | 33,237 | (14,469) | 45,163 | |||
Plan G0 | ||||||
Accrued pension obligation Plan G0 | (36,132) | (25,981) | (27,258) | |||
Sabbatical paid leave | ||||||
Recognition of reversed expense | 1,319 | 1,991 | 968 | |||
Gross amount paid for Plan G0 and sabbatical | ||||||
Paid leave recorded as receivables from the | ||||||
State Government | (104,622) | (101,741) | (96,388) | |||
(i) Capitalization of debt issuance costs
Under BR CL the costs associated with issuance of debts are recognized as a operational expenses. Under US GAAP, APB 21 Interest on Receivables and Payables debt issue costs are deferred and amortized using the effective interest method over the remaining term of the applicable debt obligations. At December 31, 2007, the balance of deferred debt issue costs included as an adjustment to shareholders equity, related to debt issue costs was R$ 7,481 (in 2006 was R$ 11,331), net of accumulated amortization.
(j) Donations
Under BR CL these amounts, which comprise principally contributions of property, plant and equipment that we receive from third parties, were recorded at fair value, generally determined based on estimates of the current replacement cost of the assets contributed, as a revenue until December 31, 2003 an as a credit to other capital reserves after this date.
For U.S. GAAP purposes, the amounts recorded as revenues and capital reserves related to donations received from third parties would be classified as a deferred credit, recorded as a reduction of the related amount of property, plant and equipment in the balance sheet, and amortized to reduce depreciation expense over the related estimated useful life of the donated assets. Prior to 2006, we did not account for any differences between BR CL and US GAAP, as the amounts of such donations have not historically been, and were not expected to be material. However, in light of the cumulative nature of such donations, beginning January 1, 2006, we began accounting for such differences.
As a result, shareholders equity under U.S. GAAP was lower by R$ 83,316, net of tax effects, as compared to BR CL at December 31, 2007 (in December 31, 2006 was R$ 69,535) . Net income in 2007 was also lower by R$ 3,487 (2006 was R$ 15,871), net of tax effects, as compared to BR CL, as a result of the cumulative differences in the accounting for donations under BR CL. The related impacts on prior year results of operations were not material.
(k) Segment reporting
Under BR CL, no separate segment reporting is required.
Under US GAAP, SFAS No. 131, "Disclosures about Segments of an Enterprise and Related Information" establishes the standards for the manner in which public enterprises are required to report financial and descriptive information about their operating segments. SFAS No. 131 defines operating segments as components of an enterprise for which separate financial information is available and evaluated regularly as a means for assessing segment performance and allocating resources to segments. A measure of profit or loss, total assets and other related information are required to be disclosed for each operating segment.
The Company operates in two segments: water services and sewage services.
(l) Comprehensive income
BR CL does not embody the concept of comprehensive income.
Under US GAAP, the Company has adopted the provisions of SFAS No. 130, "Reporting Comprehensive Income." A foreign (i.e., non-U.S.) registrant may present the statement of comprehensive income in any format permitted by SFAS No. 130. The information required by SFAS No. 130, has been included in the condensed financial statement information as prepared in accordance with US GAAP below.
(m) Provision for dividends and interest on shareholders' equity
Under BR CL, at each annual balance sheet date management is required to propose a dividend distribution from earnings and accrue for this in the financial statements. Under BR CL, companies are permitted to distribute a notional amount of interest, subject to certain limitations, calculated based on the government TJLP interest rate, on shareholders' equity. Such amounts are deductible for tax purposes and are presented as a deduction from shareholders' equity. Although not affecting net income except for the tax benefit, in certain cases companies include this notional charge in interest expense and reverse the same amount before totaling net income. The Company presents the financial expense net of the reversal in its financial statements.
8
Under US GAAP, since proposed dividends must be ratified or modified at the annual shareholders' meeting, dividends would generally not be considered as declared at the balance sheet date and, as such, would not be accrued. However, because the State Government is the Companys controlling shareholder, the minimum dividend proposal when made by management at year end is maintained as a provision, and therefore, no adjustments has been included in the reconciliation from BR CL to US GAAP. Interim dividends paid or interest credited to shareholders as interest on shareholders' equity under BR CL is considered as declared for US GAAP purposes. Under US GAAP, no similar interest distribution concept exists.
Distributions per share data (in the form of dividends or interest on shareholdersequity) is not required to be disclosed under BR CL.
Interest on shareholders' equity per common shares* for the years ended December 31, 2007, 2006 and 2005 were as follows:
December 31, | ||||||
2007 | 2006 | 2005 | ||||
(unaudited) | ||||||
Interest on shareholders' | ||||||
equity per shares | 1.32 | 1.19 | 1.53 |
* The weighted-average number of shares used in computing interest on shareholders' equity per thousand common shares for December 31, 2007, 2006 and 2005 was 227,836,623 (See item (r) of this note).
(n) Related parties
Under BR CL, related parties are generally defined in a more limited manner and require fewer disclosures than US GAAP. The Company has expanded its disclosure for purposes of BR CL.
No adjustments have been included in the reconciliation from BR CL to US GAAP.
(o) Items posted directly to shareholders' equity accounts
Under BR CL, various items are posted directly to shareholders' equity accounts. Examples include certain capitalized interest, the effects of adjustments to tax rates and tax incentive investment credits received. As noted in (a) above, Brazilian utility companies used to capitalize interest attributable to construction-in-progress at the rate of 12% per annum of the balance of construction-in-progress and that part which relates to interest on third-party loans is credited to interest expense based on actual interest costs with the balance relating to the self-financed portion being credited to capital reserves.
Under US GAAP, such items relating to third-party debt would be posted to the statement of operations. Since the original posting to equity accounts would, under US GAAP, be made directly to the statement of operations, these adjustments are included in the reconciliation of shareholders' equity and net income determined in accordance with US GAAP.
(p) Discounting
Under BR CL, discounting of trade receivables and payables to present value is not permitted. Under US GAAP, APB No. 21 "Interest on Receivables and Payables", such discounting, in certain cases, is required to record the effects of implicit interest income or expense or which are different from market rates on long-term assets and liabilities, except for transactions in which interest rates are affected by the tax attributes or legal restrictions prescribed by a government agency. The company does not have original long term agreements.
No adjustments have been included in the reconciliation from BR CL to US GAAP as the Company had no long-term trade accounts payables or receivables potentially subject to discounting at December 31, 2007, 2006 and 2005.
(q) Classification of statement of operations line items
Under BR CL, as noted above, the classification of certain income and expense items is presented differently from US GAAP. The Company has recast its statement of operations under BR CL to present a condensed statement of operations prepared in accordance with US GAAP. The reclassifications are summarized as follows:
(i) | Interest income and interest expense, together with other financial charges, are displayed within operating income in the statement of operations presented in accordance with BR CL. Such amounts have been reclassified to non-operating income and
expenses in the condensed statement of operations prepared in accordance with US GAAP; |
|
(ii) | Under BR CL, gains and losses on the disposal or impairment of permanent assets are classified as non-operating income (expense). Under US GAAP, gains and losses on the disposal or impairment of property, plant and equipment are classified as
an adjustment to operating income; |
|
(iii) | Following the issue of an accounting standard under BR CL, effective January 1, 2002, the Company is amortizing the related transition obligation related to Plan G1 over five years. The related amortization, as permitted, is being presented as
an Extraordinary item net of taxes, in the statement of operations. Under US GAAP, this amortization expense would be included as part of operating income. |
9
(r) Earnings per share
Under BR CL, net income per share is calculated on the number of shares outstanding at the balance sheet date. Information is disclosed per lot of one thousand shares, because this is the minimum number of shares of the Company that can be traded on the stock exchanges.
Under US GAAP, in accordance with SFAS No.128, "Earnings per Share", the presentation of earnings per share is required for public companies, including earnings per share from continuing operations and net income per share on the face of the statement of operations, and the per share effect of changes in accounting principles, discontinued operations and extraordinary items either on the face of the statement of operations or in a note. A dual presentation is required: basic and diluted. Computations of basic and diluted earnings per share data are based on the weighted average number of shares outstanding during the period and all potentially dilutive shares outstanding during each period presented, respectively.
Statement 128 requires the retroactive restatement of earnings-per-share computations for stock dividends, stock splits, and reverse splits. If a stock dividend or split is consummated after the close of the period but prior to the issuance of the financial statements, the earnings-per-share computation should be based on the new number of shares.
The Board of Directors, in its meeting on March 30, 2007, approved the proposal for submission to the Annual Shareholders Meeting, which took place on April 30, 2007, of the Grouping of Shares. On June 4, 2007, the shares were grouped in the proportion of 125 (one hundred twenty five) shares to 1 (one) share. The capital stock is represented by 227,836,623 common nominative and scriptural shares, without par value, remaining unchanged Sabesps capital stock.
Simultaneously to the grouping operation, the American Depositary Receits (ADRs) started to be traded in the proportion of 2 (two) shares to each ADR.
Considering the grouping of shares mentioned above the weighted-average number of shares used in computing basic earnings per share for December 31, 2007, 2006 and 2005 was 227,836,623. The Company had no potentially dilutive shares outstanding during 2007, 2006 or 2005.
(s) Leasing Transactions
Under Brazilian GAAP, generally, lessees account for long-term leases as operating leases, whereas in accordance with U.S. GAAP such leases could be accounted for as operating or capital leases. As a result, under Brazilian GAAP, lease payments by lessees with respect to leases are charged as an expense as incurred. Under U.S. GAAP, the lease payments may be charged as an expense as incurred (operating leases) or the leased asset and the corresponding lease liability may be recognized in the balance sheet and the effect of depreciation and interest expense in the results of operations (capital leases).
10
Net income (loss) reconciliation of the differences between BR CL and US GAAP
The following is a reconciliation of the differences in net income (loss) between BR CL and US GAAP:
2007 | 2006 | 2005 | ||||||
(unaudited) | ||||||||
Net income as reported under the BR CL | 1,048,703 | 778,905 | 865,647 | |||||
Depreciation of additional inflation restatement | ||||||||
in 1996 and 1997 | (a)(i) | (67,614) | (75,541) | (61,955) | ||||
Reversal of depreciation of revaluation increments | (f)(i) | 87,670 | 102,272 | 89,449 | ||||
Depreciation of supplementary restatement prior to 1991 | (a)(ii) | (101,361) | (118,243) | (103,420) | ||||
Deferred tax effects on above (excluding revaluation) | (b) | 57,452 | 65,887 | 56,228 | ||||
Net income as reported under the BR CL, | ||||||||
adjusted for inflation restatements and | ||||||||
revaluations | 1,024,850 | 753,280 | 845,949 | |||||
Accrued pension cost - Plan G1 | (h)(iv) | 33,237 | (14,469) | 45,163 | ||||
Accrued supplementary pension cost - Plan G0 | (h)(iv) | (36,132) | (25,981) | (27,258) | ||||
Sabbatical leave benefits | (h)(iv) | 1,319 | 1,991 | 968 | ||||
Actuarial liability (Plan G0) and sabbatical leave | ||||||||
benefits push-down recognition | (h)(iv) | (104,622) | (101,741) | (96,388) | ||||
Capitalized interest | (f)(ii) | 36,280 | 16,024 | 25,929 | ||||
Interests on Capital Leasing | (s) | (6,322) | 6,967 | (645) | ||||
Deferred charges, net of effects of accumulated | ||||||||
amortization | (g) | 6,561 | 10,496 | 18,566 | ||||
Capitalization of debt issuance costs | (i) | (3,850) | (2,645) | 13,976 | ||||
Deferred Credits - Donations | (j) | 5,283 | (26,622) | |||||
956,604 | 617,300 | 826,260 | ||||||
Deferred income taxes effects: | ||||||||
Other GAAP differences above, excluding | ||||||||
reversal of revaluation increments | (b) | (24,205) | 5,184 | (35,016) | ||||
Net income under US GAAP | 932,399 | 622,484 | 791,244 | |||||
Net income per thousand common shares | ||||||||
Basic and diluted (in reais) | (r) | 4.09 | 2.73 | 3.47 | ||||
Weighted average number of common shares | ||||||||
outstanding on December 31, 2007 | (r) | 227,836,623 | 227,836,623 | 227,836,623 |
11
Shareholders' equity reconciliation of the differences between BR CL and US GAAP
The following is a reconciliation of the differences in shareholders equity between BR CL and US GAAP:
2007 | 2006 | |||||
(unaudited) | ||||||
Shareholders' equity, as reported under BR CL | 9,784,006 | 9,018,482 | ||||
Add (deduct): | ||||||
Additional inflation restatement in 1996 and 1997, net | (a) (i) | 1,103,962 | 1,171,576 | |||
(a) (ii)/ | ||||||
Reversal of revaluation increments, net | (f) (i) | (2,339,829) | (2,427,499) | |||
Supplementary restatement prior to 1991, net | (a) (ii) | 2,705,277 | 2,806,638 | |||
Deferred tax effects on above (excluding revaluation) | (b) | (1,244,233) | (1,301,684) | |||
Shareholders' equity, as reported under BR CL, adjusted for | ||||||
inflation restatements and revaluations | 10,009,183 | 9,267,513 | ||||
Accrued pension cost - Plan G1 | (h) (iv) | (51,889) | 37,902 | |||
Accrued supplementary pension cost -Plan G0 | (h) (iv) | (1,237,667) | (1,244,067) | |||
Actuarial liability (Plan G0) and sabbatical leave expense | ||||||
push-down recognition | (h) (iv) | (994,047) | (889,425) | |||
Additional paid-in capital - Plan G0 and sabbatical expense | ||||||
reimbursed by the State Government | (h) (iv) | 114,970 | 114,970 | |||
Sabbatical paid leave of absence benefits | (h) (iv) | (7,246) | (8,565) | |||
Capitalized interest | (f) (ii) | 183,738 | 147,458 | |||
Interests on Capital Leasing | (s) | - | 6,322 | |||
Deferred charges expensed, net | (g) | (3,474) | (10,035) | |||
Capitalization of debt issuance costs | (i) | 7,481 | 11,331 | |||
Deferred Credits - Donations | (j) | (92,271) | (80,286) | |||
Other GAAP differences | (e) | 88 | (93) | |||
Deferred income taxes effects: | (b) | |||||
Other deferred tax effects on US GAAP differences above, | ||||||
excluding adjustments for available-for-sale securities, | ||||||
inflation restatements and revaluation increments | (37,235) | (54,861) | ||||
Shareholders' equity under US GAAP | 7,891,631 | 7,298,164 | ||||
12
SABESP
MANAGEMENT
REPORT 2007
13
Message from Sabesp CEO 2007 Improvements and Challenges for the coming years
The year 2007 was one of important changes for Sabesp. Internal and external alterations have placed new challenges and opportunities to the largest sanitation company in Latin America and one of the largest worldwide in number of consumers served.
Firstly, a new regulatory framework in the sanitation sector has been established with the approval of the Sanitation Law and of the Law for Creation of ARSESP, the São Paulo State Sanitation and Energy Regulatory Agency. The first indicates general guidelines for the sector regulation and rules the relationship between the operators and the granting authorities, thus reducing the potential regulatory risk and consequently the capital cost. The latest establishes, for the first time in São Paulo State Government, a state regulatory agency applying the best practices of independent regulation and technical excellence, thus reducing the legal insecurity.
Furthermore, ARSESP Law provides Sabesp with the possibility of entering markets such as energy, solid waste among others, with greater flexibility and agility. This opens new horizons, in conformity with the regulatory environment recently introduced, in which the competition must substitute the state monopoly.
There is no time to waste. Sabesp is already tuned with the competitive environment and with the need to comply with external regulation issues. The Company is mobilized to break the monopolist regime accommodation and to dispute markets based on efficiency and in favor of the citizens and consumers interests.
Secondly, and coherent with the regulatory framework, the Company did not spare efforts in 2007 to build a new relationship with the municipalities. The unilateral relationship was replaced by permanent dialogue and partnership with granting municipalities, including social civil organizations. The results announced happy news: 106 contracts renewed and 124 laws authorized in municipal chambers. This process remains in 2008, seeking stability contractual security.
Thirdly, the Company has conceived an ambitious program goal for 2007-2010, doubling the level of investments in relation to the 2003-2006 four-year period and foreseeing the investment of almost R$6 billion in resources. Such effort is focused on programs aligned with strategic planning and actions to overcome the gaps in sanitation areas attended by Sabesp, with special attention to the sewage treatment and the environmental sanitation. An economic-financial sustainability strategy was simultaneously conceived in order to assure the Company good risk classification and, consequently, guarantee the financing and investment capability. This has led to a range of initiatives to increase revenues and reduce expenses that started to bear fruit in 2007and generate the largest portion of results in the years to come.
Fourthly, environmental protection is no longer considered a complement of the work program, having therefore become the main reason for Sabesp existence.
We shall point out some of the important outcomes of this dramatic change in the company policy related to environment: a new environmental policy has been approved after a 100-day public consultation and two public hearings; an environmental management superintendence has been created in the administration sphere which has broadened its attributions in regard to Technology and Environment; dialogue with non governmental organizations have been strengthened with the creation, for example, of hearings on sustainability, which have ensured a noticeable approach of the Company with socio-environmental efforts of non-governmental organizations, academia and the private sector; the goal to integrate the Bovespa Corporate Sustainability Index (ISE) was advanced in two years from 2009 to 2007.
In line with the objective of sustainable use of water resources, and consonant with the revenue increase and diversification goals, a platform of products and services has been created through Sabesp Environmental Solutions Program. From the environmental standpoint, the Company intends to develop water consumption management tools to be used by major customers, leading them to make an optimal utilization of water from a social viewpoint. From the entrepreneurial point of view, such enterprises add value to the Company activity, allowing revenue increase and/or customers fidelity and strengthening of Sabesp brand.
Fifthly, commercial and institutional pro-activity has been adopted, emphasizing the customer valorization. Such adoption has developed at least three initiatives: improvement of the services rendered; revision of trading norms in compliance with consumers rights best practices; and, mainly, cooperation and partnership work with the granting municipalities. A demonstration of this new commitment is reflected in the inclusion of the new customer satisfaction indicator in the set of goals that rules the employees profit participation.
Next, a new relationship regime with government and several other partners has been instituted. Important steps have been taken towards solution of contract and finance issues with the State Government by means of a second amendment to the Term of Acknowledgement and Consolidation of Obligations, Payment Settlements and Other Covenants, signed in 2001, to settle existing debts among the parties. We must also highlight the agreement with São Paulo municipality, which means more institutional safety in Sabesp largest operation market.
Finally, Sabesp growth and modernization presuppose a solid partnership with the supply chain through both, competition and innovation. From the competition standpoint, a mechanism for broadening the range of suppliers and for adopting cooperation with competitors rights organizations was created, thus decreasing the
14
price setting capacity on the part of the goods and services sellers. From an innovation standpoint, Sabesp has strengthened and increased the technical cooperation agreements with advanced research and development centers in Brazil and abroad. Besides, it has implanted innovation hearings and stimulated the diffusion of best practices and technologies in its business units. The Company growth and sustainability depend essentially on the systematic introduction of new products and technologies, maintaining the Company in the worldwide innovation frontier.
The notion that the sanitation network demands smaller innovation rates, in relation to other infrastructure segments, is overcome. Several factors impose a strong technical progress rhythm in this segment, demanding from Sabesp a great effort in research and development: the new competitive regime; the new possibilities of information technology and introduction of water and sewage treatment technology; and, mainly, the highest standards of environmental treatment and residues final disposal.
Concerned with the increase in operational efficiency, Sabesp has structured programs to improve energy efficiency and to fight water losses. The latest foresees the reduction of losses index from 30% to 24% by 2010, with continuous improvement of this index up to 2018. The other program aims at reducing expenses with the Company main input, optimizing processes and using sub-products from its production process. On one hand, the water potential makes possible the creation of small power plant centers (PCHs). On the other hand, the biogas originated in the digestion of the sludge from the Sewage Treatment Stations (E TEs) facilitates the creation of small thermal centers (PCTs).
The new sanitation regulatory environment provides tremendous challenges to Sabesp. In 2007 some important steps were taken to successfully address these challenges. Proceeding with the work program, strictly in conformity with the best practices in Corporate Governance and with the José Serra Government guidelines should allow Sabesp to confirm its renewal and sanitation leadership capacity.
Gesner Oliveira
Sabesp CEO
15
Sabesp A Company of environmental solutions
MISSION
The Company mission statement is to universalize environmental sanitation public services in the State of São Paulo and provide quality services and products in the domestic and foreign markets, having as guiding principles: a) Commitment with environmental soundness in a competitive and self-sustained way; b) Balanced and efficient servicing both public service and business; c) Ethical operation and focus on the client, in a competitive environment; d) Social and environmental responsibility; e) Sanitation sector defense.
THE COMPANY AND ITS OPERATING ENVIRONMENT
Sabesp Companhia de Saneamento Básico do Estado de São Paulo (Basic Sanitation Company of the State of São Paulo) is an open capital mixed economy company that has as controlling shareholder the State of São Paulo Government. It operates directly in basic and environmental sanitation service rendering in 366 state municipalities. It also provides treated water on a wholesale basis and makes available the sewage treatment for more than six municipalities in the São Paulo Metropolitan Region RMSP serving around 26 million people which represents approximately 60% of the urban population of São Paulo State.
One of the 50 largest Brazilian companies, with gross revenue of R$6.4 billion and shareholders equity of R$9.8 billion Sabesp has been structuring itself to increase its operation basis and develop its mission statement as an environmental solutions Company, guided by the Goals Plan and by the Sustainability Program.
ALTERATION IN THE REGULATORY ENVIRONMENT
Regulations in the sanitation sector suffered important modifications in 2007. The major changes were the approval of the Federal Law 11,445/07, that established national directives for basic sanitation, and the approval of the Supplementary State Law 1.025/07 that created ARSESP (São Paulo State Sanitation and Energy Regulatory Agency).
The new regulatory environment seeks to consolidate the integration between the investments of the operator and the priorities of the services provider, making accountability more transparent, increase investment safety in the sector and provide economic rationality to the tariff structure.
NEW BUSINESSES PERSPECTIVE
The changes in the regulatory environment also created the possibility of geographical expansion and development of new markets. Sabesp has already signed a technical cooperation agreement with the Sanitation Company of Alagoas State (Companhia de Saneamento de Alagoas - CASAL); prepared agreements with the Water and Sewage Company of Paraíba State (Companhia de Águas e Esgotos da Paraíba CAGEPA) and with the Water and Sewage Company of Rio Grande do Norte State (Companhia de Água e Esgotos do Rio Grande no Norte CAERN); and carried out studies for automation of some production systems of the Sanitation Company of Espírito Santo State (Companhia Espírito-Santense de Saneamento - CESAN). In the foreign market, Sabesp started prospecting businesses in Latin American countries.
CONCESSIONS RENEWAL
In 2007, Sabesp signed contracts for rendering sanitation service programs with 106 municipalities. With these contracts, which will last 30 years, the Company assured the maintenance of its market, already adjusting the relationship with the municipalities as foreseen in the new Sanitation Law.
Besides the program agreements, the municipalities signed, with the São Paulo State Government, cooperation agreements that delegate the service regulation and inspection to ARSESP.
AGREEMENTS AND COMMITMENT PARTNERSHIP
In November 2007, Sabesp signed a commitment partnership with São Paulo City Hall to guarantee the institutional stability for providing basic and environmental sanitation public services, investing in common interest projects; finding solutions for pending financial situations; and resume the payment of the current consumption. This market represents around 50% of Company business. In February 2008, the final conclusion date for the steps in progress was postponed for 90 days.
16
In December 2007, the Company signed the Second Amendment to the Agreement with São Paulo State Government, for settling existing debts between the parties and the payments for water bill, as well as the dividends due to the State. Such amendment introduced a new phase in the relationship between Sabesp and the São Paulo State Government, on a more modern and transparent corporate basis.
In March, 2008, a Commitment Agreement was signed with the State of São Paulo in order to settle pending financial issues related to the reimbursement of supplementary benefits from pension and retirement plans.
Sabesp has operated in a proactive way in order to settle payment of debts through parceling agreements with several municipalities and also to accomplish the restructuring of accounts, aiming at recovering credits.
SABESP ENVIRONMENTAL SOLUTIONS
Sabesp Environmental Solutions program is a new business platform that has as main objectives to gain customer fidelity and expand the large industrial, commercial and residential customer base. The products and services are aimed at big customers who want to benefit from Sabesp knowledge and technology in the sustainability, environmental preservation and water resource management fields. The potential market is estimated to be of 10 thousand companies.
The four products available in the market during the first phase are:
Rational Use of Water Program (PURA) implements technologies and concepts for the correct use of water, for fighting waste and, consequently, reducing costs.
Reuse Water sub-product of the sewage treatment stations that substitutes the treated water in activities which do not require potable water, such as patio washing, equipment cooling and dilution of chemical waste, among others.
Collection of Non-Domestic Sewage Program (PREND) developed for organizations that wish to reduce costs with sewage treatment and that for this reason wish to rely on Sabesp adequate infrastructure for collection.
Firm Demand Contracts guarantee competitive tariff rates and supply to customers that commit themselves to only use water coming from public network, eliminating wells and water acquisition through tank trucks.
The second phase of Sabesp Environmental Solutions, which is forecast for 2008, plans to increase the offer and to incorporate new products such as remote and individualized measuring. Other services such as maintenance in private and public systems, installation of private treatment stations, and consulting can be later incorporated.
During 2007, Sabesp negotiated the reuse water supply with Polo Petroquímico de Capuava (Capuava Petrochemical Complex), whose protocol of intentions was signed in January 2008. The project called Aquapolo Ambiental is a clear example of the advancements of the offer of reuse water which constitutes one of Sabesp Environmental Solutions from its first stage. The volume supplied is equivalent to the consumption of a city such as Santos.
COMPANY MANAGEMENT - PLANNING, GOALS AND INVESTMENTS
Sabesp Goal Plan 2007/2010 was prepared after broad discussions within the Company based on the Balance ScoreCard BSC. The process culminated with the commitment of all employees during an event held on May 31st, 2007.
Aiming at the balance between service, operation and environmental indicators, the goals comprise the Company principal performance areas, the water supply system, and sewage collection and treatment, a permanent program of loss reduction and qualitative environmental goals.
17
Goals Program 2007-2010
Corporate Goals - Water | 2007 | 2008 | 2009 | 2010 | Total | |
Water | No. of connections x 1000 | 148.8 | 166.9 | 164.3 | 172.0 | 652.0 |
services | Universalized |
Water Loss Reduction | Real. 2006 | 2007 | 2008 | 2009 | 2010 |
liters/connections x day | 511 | 461 | 421 | 393 | 361 |
billing (%) | 31.9 | 30 | 27 | 26 | 24 |
Water supply: 2007 - 2010 | |
Increase in the water production capacity¹ | + 11.0 m³/s |
Corporate Goals - Sewage | 2007 | 2008 | 2009 | 2010 | Total | |
Sewages | No. of connections x 1000 | 140.1 | 164.4 | 169.6 | 317.6 | 791.7 |
services | from: 78% --> to: 84% |
Sewage collection and treatment 2007 2010 | |
? collection | + 4.6 m³/s |
? treatment | + 9.3 m³/s |
% treated of the sewage collected | from: 63% -->to: 82% |
Note: | (1) Availability increase in the producing systems: |
RMSP- Alto Tietê (PPP) = 5m³/s | |
Guarapiranga = 2m³/s and Rio Grande 0,5m³/s | |
Baixada Santista-Mambú/Branco = 1m³/s | |
Franca-Sapucaí = 1m³/s | |
remaining producing systems = 1,5m³/s |
Investments Plan 2007- 2010
In order to support the Goals Program, Sabesp has prepared the following Investments Plan for the period 2007-2010:
Investments (R$ million) | 2007 | 2008 | 2009 | 2010 | Total |
Water | 336 | 563 | 622 | 755 | 2,276 |
Sewage | 487 | 907 | 824 | 814 | 3,032 |
Others | 137 | 104 | 145 | 176 | 562 |
Total Sabesp | 960 | 1,574 | 1,591 | 1,745 | 5,870 |
18
INVESTMENTS REALIZED
In 2007 Sabesp invested R$921.1 million. The chart below presents the historical series of investments.
Obs.: | 1999 does not include the assumption of Osasco City (R$231 million) |
2003 does not include the transfer of sanitation services of São Bernardo do Campo City (R$415 million) |
The following table presents the realized investments in water and sewage in the RMSP (São Paulo Metropolitan Region) and Regional Systems in 2007.
Investment per Region (R$ million) | |||
Region | Water | Sewage | Total |
RMSP | 288.6 | 251.2 | 539.8 |
Sistemas Regionais | 127.4 | 253.9 | 381.3 |
Total | 416.0 | 505.1 | 921.1 |
The new water and sewage connections and the population serviced are presented as follows:
Water and sewage connections realized and population served | ||||
RMSP | Regional Sistems |
Total | ||
Water | # new connections ¹ | 108.4 | 65.3 | 173.7 |
population served ² | 460 | 170 | 630 | |
Sewage | # new connections ¹ | 86.5 | 65.0 | 151.5 |
population served ² | 340 | 195 | 535 |
(¹) In million units
(²) In million inhabitants
19
São Paulo Metropolitan Region - RMSP
The Metropolitan Executive Office services the RMSP and the Bragantina Region, totaling 38 municipalities. The water supply in this region is performed through an integrated system composed by eight production systems interconnected by the Metropolitan Region aqueduct system in addition to standalone systems. In 2007, R$288.6 million were spent in the improvement of the water supply system. The sewage collection and treatment service in this region is performed through a major system composed of five sewage treatment stations that service a collection infrastructure integrated by networks, trunk and intercepting sewers, besides 21 isolated systems. In 2007 there were invested R$251.2 million in several actions to improve the sanitation drainage system.
Regional Systems
The Regional Systems Executive Office services the Baixada Santista Metropolitan Region, composed of nine municipalities and remaining coastal and interior municipalities, totaling 328. The water supply in Baixada Santista is made through an integrated system that services seven municipalities. The remaining cities are serviced by standalone systems.
For the improvement of the water supply in the Regional Systems, R$127.4 million were used in 2007. In regard to sanitary sewage, the treatment is done through standalone systems, R$253.9 million has been invested.
Structuring Programs and Projects
The main objective of the Investments Plan is to eliminate sanitation gaps and service the State population who are in the most vulnerable social strata. To do so, it is essential that there is planning and scheduling of actions in order to maintain the focus and the pace of the accomplishments.
The main Programs and Structuring Projects are the following:
Alto Tietê Public Private Partnership
Seeking new water sources for the macro-metropolis, Sabesp launched the 1st PPP for the sanitation sector with the objective of expanding in 5 m³/s, the water production for supplying the São Paulo Metropolitan Region, which foresees, among other tasks, the increase in the Taiaçupeba ETA capacity from 10m³/s to 15m³/s and the construction of four reservoirs totaling 70 thousand m³, with investments estimated in R$300 million. On November 29, 2007, four consortiums handed in financial proposals and habilitation documents to Sabesp Special Bidding Commission.
Permanent Program of Loss Reduction
In the second semester of 2007 the structuring of a Corporate Program of Water Loss Reduction was started, with a ten-year span, aiming at obtaining a more consistent and faster reduction of losses, through the integration and expansion of the already existing ones in the Company Business Units and through assurance of the availability of resources.
Water Source Program
Aimed at the water source preservation for the São Paulo Metropolitan Region supply, with investments of US$281.8 million to be carried out with resources from the World Bank and participant matching funds. The conclusion of this program is foreseen for 2013. Sabesp participation in the Program is of US$125 million.
Tietê Project - Phases II and III
The purpose of this Program is to expand and optimize the sewage collection in the RMSP, raising the volume of sewage treated in the treatment stations, in order to:
20
Clean Wave Program
services 3 million people (steady and floating population) from the cities from Baixada Santista Metropolitan Region - Santos, São Vicente, Praia Grande, Guarujá, Itanhaém, Peruíbe, Mongaguá, Cubatão and Bertioga, increasing from 54% to 95% the service index for sewage collection and to 100% the treatment of collected sewage. Among the benefits expected from the Program, it is possible to highlight: improvement of sanitation conditions, clean-up of rivers and channels; recovery of the beaches for recreational use; increase in tourism; increase in revenues; and generation of jobs.
Nature Operation: Clean Stream Program
a partnership between the State Government, through Sabesp, and the São Paulo City Hall, which aims at cleaning and revitalizing the main Municipal streams in a two-year period, with investments of around R$200 million, by means of actions such as the improvement of the sanitary sewage system and the clean-up of the surrounding area of streams, with benefits to a population of 2.4 million inhabitants. From the 42 major streams selected in this first stage, 12 have already been cleaned.
TECHNOLOGICAL INNOVATION PROGRAMS
Information Technology
Performance in projects aimed at fulfilling the compliance demands, supporting the business and strengthening the information security were prioritized. Applications aimed at the business support and management developed during this period benefited the contract management, operational control, billing, field work, financial economic management; and physical-financial and accounting equity management. It is worth to poit out that the introduction of the digital certification in the Electronic Bidding, assuring reliability in the identity of participants.
Innovation Hearings
Which have as objective the creation of opening permanent space for stimulating innovation for the Companys supply chain, so that different segments are able to present their products, services and solutions, aiming at providing higher productivity and quality technical and operational processes in sanitation, thus enabling cost reduction and rendering of better services.
In 2007, eight hearings were held on several themes, such as filtering membranes, telemetry in water meter reading, recycling of sludge from ETAS, and automation systems.
With an annual schedule already defined, it is expected that the innovation theme would stimulate competitors in the main markets in which Sabesp acquires its products and services, generating great interest of the companies in exposing their projects to the Company technicians. With this purpose, the Guidelines for Sabesp purchase bidding were created.
Communication
Sabesp Communication activities, throughout 2007, showed the importance of maintaining the basis of the work being performed: transparency, agility, relationship and responsibility.
In the press area, Sabesp monitoring registered around 24 thousand news issues, being 20% of them positive and only 5% negative which clearly proves the media interest in the Company and, likewise, their interest in working side-by-side with Sabesp on the task of presenting to society, not only reliable information on the operating issues, but also news items and knowledge about the Company processes, products, services and technology.
The rather small number of negative news issues demonstrate that, despite the broadening of editorials on consumer rights, Sabesp has been able to respond to demand, not allowing operating occurrences, foreseeable in the Company market, to affect Sabesp image or its brand value.
In 2007, more than 600 booklets were produced, with wide use by the issuers. Sabesp site was reformulated, giving space to more news and greater dynamics. Through the summer project 2007-2008 the Company tried to promote consciousness and assure the regularity in water supply during the summer vacations. Sabesp was also present at more than 500 events and meetings, building up a strong commitment and dedication link, strengthening its message and Company mission statement.
SOCIAL RESPONSIBILITY
21
The incorporation of social responsibility practices at Sabesp is monitored based on the Social Responsibility Management System developed with the objective of unifying the data collection process in all the Companys chain of activities.
Supplied by a network of 1,500 collaborators representing all Executive Officers, the system allows the management and registration of social projects according to Ibase criteria (Brazilian Institute of Social and Economic Analysis). In 2007, for instance, Sabesp, through its educational projects aimed at the external community, serviced around 130 thousand people in São Paulo State.
Through this system, it is also possible to carry out a diagnosis of the Companys stage in Social Responsibility, guided by the Indicator Matrix of the Ethos Institute, according to the themes: 1- Values, Transparency and Governance; 2- Internal Public; 3- Environment; 4- Suppliers; 5- Consumers and Customers; 6- Community and 7- Government and Society.
Therefore, all indicators are evaluated in the Strategic Planning, culminating in goals and improvement actions.
The following indicators and goals defined through this process should be pointed out:
Operational Indicators
In 2007, the total volume of billed water, including wholesale, presented a 2.2% increase when compared to 2006. In regard to sewage services, there was a 4.3% increase in the billed volume, due to the enlargement of the sewage services, the higher volume of water billed and the new sewage treatment agreements, with the current water customers in the wholesale markets.. These new agreements, in addition to being another source of revenue for the Company, avoids the disposal of tons of sewage into the rivers of the São Paulo Metropolitan Region, with positive impacts to the environment.
Billed Water and Sewage Volume Per Customer Category - million m3 | ||||||||||||||||||
Água | Esgoto | Água + Esgoto | ||||||||||||||||
2006 | 2007 | % | 2006 | 2007 | % | 2006 | 2007 | % | ||||||||||
Residential | 1,314.7 | 1,338.8 | 1.8 | 1,035.6 | 1,065.1 | 2.8 | 2,350.3 | 2,403.9 | 2.3 | |||||||||
Commercial | 148.0 | 151.2 | 2.2 | 135.3 | 138.4 | 2.3 | 283.3 | 289.6 | 2.2 | |||||||||
Industrial | 34.4 | 35.3 | 2.6 | 32.4 | 33.3 | 2.8 | 66.8 | 68.6 | 2.7 | |||||||||
Public | 46.7 | 47.4 | 1.5 | 37.4 | 37.8 | 1.1 | 84.1 | 85.2 | 1.3 | |||||||||
Total retail | 1,543.8 | 1,572.7 | 1.9 | 1,240.7 | 1,274.6 | 2.7 | 2,784.5 | 2,847.3 | 2.3 | |||||||||
Wholesale | 263.4 | 274.3 | 4.1 | 5.3 | 24.9 | - | 268.7 | 299.2 | 11.4 | |||||||||
Total | 1,807.2 | 1,847.0 | 2.2 | 1,246.0 | 1,299.5 | 4.3 | 3,053.2 | 3,146.5 | 3.1 | |||||||||
Billed Water and Sewage Volume Per Region - million m3 | ||||||||||||||||||
Water | Sewage | Water + Sewage | ||||||||||||||||
2006 | 2007 | % | 2006 | 2007 | % | 2006 | 2007 | % | ||||||||||
Metropolitan | 1,030.8 | 1,046.8 | 1.6 | 843.5 | 866.0 | 2.7 | 1,874.3 | 1,912.8 | 2.1 | |||||||||
Regional (1) | 513.0 | 525,9 | 2.5 | 397.2 | 408.6 | 2.9 | 910.2 | 934.5 | 2.7 | |||||||||
Total retail | 1,543.8 | 1,572.7 | 1.9 | 1,240.7 | 1,274.6 | 2.7 | 2,784.5 | 2,847.3 | 2.3 | |||||||||
Wholesale | 263.4 | 274.3 | 4.1 | 5.3 | 24.9 | - | 268.7 | 299.2 | 11.4 | |||||||||
Total | 1,807.2 | 1,847.0 | 2.2 | 1,246.0 | 1,299.5 | 4.3 | 3,053.2 | 3,146.5 | 3.1 | |||||||||
Note (1) including coastal and interior regions.
22
The Company continues expanding its services and improving its operational indicators, which can be observed in the following table, through the increase of the number of water and sewage connections, population served, water losses and number of employees.
Information related to the volumes of water and sewage, number of employees, network extension (km), water and sewage connections, population served, operating productivity, water losses , savings achieved and investments in improvement programs were not audited.
Operacional Indicators | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | |
Water connections 1 | 4,111 | 4,324 | 4,601 | 4,946 | 5,242 | 5,535 | 5,717 | 5,898 | 6,044 | 6,358 | 6,489 | 6,609 | 6,767 | |
Sewage connecitons1 | 2,870 | 3,019 | 3,277 | 3,559 | 3,763 | 3,976 | 4,128 | 4,304 | 4,462 | 4,747 | 4,878 | 5,002 | 5,167 | |
Population Served2 |
Water | 17.4 | 17.6 | 18.5 | 19.1 | 19.4 | 20.5 | 20.8 | 21.1 | 21.3 | 22.3 | 22.6 | 22.7 | 23.0 |
Sewage | 12.9 | 13.1 | 14.0 | 14.8 | 15.1 | 15.9 | 16.2 | 16.7 | 17.0 | 18.0 | 18.3 | 18.5 | 18.9 | |
Volume billed 3 |
Water - wholesale |
315 | 357 | 368 | 388 | 393 | 318 | 322 | 339 | 346 | 251 | 259 | 263 | 274 |
Water - Retail |
1,323 | 1,348 | 1,409 | 1,429 | 1,396 | 1,413 | 1,376 | 1,431 | 1,419 | 1,441 | 1,500 | 1,544 | 1,573 | |
Sewage | 975 | 993 | 1,036 | 1,066 | 1,058 | 1,070 | 1,054 | 1,105 | 1,110 | 1,141 | 1,198 | 1,246 | 1,300 | |
Produced Volume 3 | 2,434 | 2,527 | 2,521 | 2,593 | 2,665 | 2,679 | 2,650 | 2,778 | 2,820 | 2,770 | 2,830 | 2,887 | 2,874 | |
Water loss (%) | 32.1 | 31.6 | 29.8 | 29.9 | 30.6 | 31.4 | 31.4 | 31.7 | 33.0 | 34.0 | 32.4 | 31.9 | 29.5 | |
# of employees 4 | 18,861 | 18,467 | 19,129 | 19,340 | 18,324 | 18,048 | 18,159 | 18,505 | 18,546 | 17,735 | 17,448 | 16,978 | 16,850 | |
Productivity 5 | 370 | 398 | 412 | 440 | 491 | 527 | 542 | 551 | 566 | 626 | 651 | 684 | 708 |
Notes: | ||
(1)In thousand units at the end of the period. |
||
(2) In million inhabitants at the end of the period (not including wholesale water supply, which represents more than 3.2 million inhabitants). | ||
(3) In million of m³. | ||
(4)Number of employees on December 31 of each year. |
||
(5)Number of water and sewage connections per employee. |
EXCELLENCE IN QUALITY MANAGEMENT
EXCELLENCE PROGRAM
Sabesp intends to be recognized as a World Excellence Standard Company in environment sanitation services. In order to do so, the Excellence Program of Quality Management is aligned to Sabesp Future Vision and has, as its main objective, to integrate the internal quality processes and strengthen its impacts on global results.
The external audits performed in 2007 assured the maintenance of the integrated certification that is the basis for the ISO9001:2000 (quality) and OSHAS 18001:1999 norms which assess the frequency and severity rates of work accidents (occupational health and safety).
Still during the year 2007, the process for obtaining the ISO 14001 norm certification (environmental management) in 10% of the Companys operating units by 2010 and the ISO/IEC 17025 accreditation for the sanitation control laboratories of the Metropolitan Office were started, integrated to the system implemented.
Another significant activity was the constitution of improvement groups per process, which ntegratei the pertinent areas to issues under the coordination of the functional area. These groups have as objectives, the homogenization of processes, through standardization and simplification of documents, indicators and management goals.
LABORATORIES ACCREDITATION
The laboratories accreditation was enlarged. These results were only due to the convergence of efforts and to the effective participation of all employees who contributed to quality standards compatible with Sabesps importance to society.
Sabesp, at Regional System Office level, obtained accreditation granted by INMETRO, as recommended by ISO 17025, of all its Sanitary Control Laboratories. Nowadays, Sabesp has eleven accredited laboratories (ten in the Regional Systems and a main laborat ory in the RMSP). With this accreditation, Sabesp sanitation control units start to comply with the requisites previously defined and, by means of INMETRO external auditing, demonstrate that they are competent to perform their activities with confidence and international recognition.
23
CORPORATE GOVERNANCE
Sabesp has integrated, as of December 1st, 2007, the Bovespa (São Paulo Stock Exchange) Corporate Sustainability Index (ISE), being the only company from the sanitation sector to be part of this index, which reflects the performance of the companys actions representing its high level of commitment with sustainability and social responsibility.
It was also the first mixed capital company to join to the Bovespa Novo Mercado, a segment reserved to companies with best corporate governance practices, in April, 2002. The Company procedures are aligned with the norms in force in both, the Brazilian and the North American markets. Practice applications have been constantly monitored and are reinforced by the Corporate Governance verticalization program, with training for the communication and strengthening of its basic principles.
Sabesp corporate governance structure is composed by:
Shareholders Meeting Maximum decision venue, rules upon the destination of the net income, elects the members of the Board of Directors and Fiscal Council and, occasionally, according to the By-Laws, indicates the members of the Audit Committee, in addition to determining the board members remuneration.
Board of Directors Established since Sabesp foundation and, since it is a mixed capital company, the Board of Directors is currently composed of ten members with unified one-year mandates. Among them, three are independent, according to the Novo Mercado rules, being one elected by the minority shareholders.
Audit Committee The Board of Directors is assisted by an Audit Committee composed by three independent board members which one is a finance expert and coordinator of the committee.
Code of Ethics and Conduct The Code of Ethics and Conduct was approved by the Executive Officers and the Board of Directors in the beginning of 2006. Afterwards, there was a broad communication to all employees, suppliers and remaining stakeholders. The document is composed of organizational values and ethic principles that guide the Company behavior and contribute to solve any possible conflicts of interest.
Ethical Committee An instance of advisory, normative and educational nature, that was composed with the formalization of the Code of Ethics and has executive representatives of issues related to the code. In 2007 meetings were held, focused on the assessment of the claims with greater incidence and in the proposals for changes in processes.
Hot Line Sabesp maintains a Hot Line via phone, e-mail or PO box to handle internal denunciation of presumed illicit acts or breach of its code of ethics and conduct. In 2007, 181 claims were received and investigated or have on-going investigations. The Executive Officer and the Audit Committee follow up all denunciations and the recommended corrective actions made by internal audit.
Relationship with Independent Auditors The Company follows the principles that preserve the independence of external auditors in non-auditing of their own work, not carrying out management roles and not auditing its own client. Deloitte Touche Tohmatsu Auditores Independentes performed as our independent auditor for the fiscal year ending on December 31, 2007 and 2006. Deloitte Touche Tohmatsu Auditores Independentes did not carryout, for Sabesp, any services unrelated to external auditing.
Risk Management and Internal Controls In 2007, in order to address the North American Sarbanes-Oxley (SOx) legislation, there were improvements made to the control of financial risks, with emphasis on the continuous monitoring actions of the controls developed, aiming at their rationalization and automation. Additionally, corrective measures were adopted as required in order to address the two material weaknesses related to the 2006 fiscal year.
The methodology adopted considered the principles of the Committee of Sponsoring Organizations of the Treadway Commission (COSO) and of the Control Objectives for Information and Related Technology (COBIT). A project is under way to manage risks, at corporate level, through the identification and assessment of strategic risks and of Sabesps main processes. It is also worth highlighting the extension of the strategic risk assessment to Fundação de Seguridade Social Sabesprev, which should be completed in 2008.
ARBITRATION CLAUSE
As provided in the New Market Regulation (Regulamento do Novo Mercado), the Company is bonded by an Arbitration Clause, through which Bovespa and the Company and its shareholders and members of the Fiscal Council agree to settle, through arbitration, any and all disputes or claims amongst them, related or otherwise
24
arising out of the application, validity, efficiency, understanding, breach and its effects, of the provisions contained in the Brazilian Corporate Law (Lei das Sociedades por Ações), in the Company By-Laws, in the norms set forth by the National Monetary Council (Conselho Monetário Nacional), Central Bank of Brazil and the Securities Exchange Commission (Comissão de Valores Mobiliários) , as well as all applicable norms for the operation of the securities market in general, in addition to those provided in the Regulation Listing of the New Market (Regulamento de Listagem do Novo Mercado), of the Arbitration Regulation (Regulamento de Arbitragem) and the New Market Participation Agreement (Contrato de Participação do Novo Mercado). As per the Sabesp Articles of Incorporation, the bonding to the Arbitration Clause is limited to the applicable of its inalienable rights.
Social responsibility in its relationships
Sabesp maintains the policy of an open channel with several segments of society, making the necessary information available, in order to clarify and communicate its actions, aiming at the legitimate interest of the stakeholders and of public health.
Today, the Company is guided by the purpose of inserting socially responsible practices in its daily operations and also of incorporating to its organizational culture the concept of sustainability, aiming at integrating the necessities and aspirations of all its stakeholders shareholders, employees, family members, customers, suppliers, communities, governments and general society.
In order to direct the sustainability to all its activities and to integrate it to its value chain, Sabesp relies on a Social Responsibility Program that, supported by its Code of Ethics and Conduct, defines the institutional guidelines, contemplating the Company diversity, strengthening confidence and assuring the transparency of the actions.
RELATIONSHIP WITH CUSTOMERS
Today, Sabesp serves, directly and indirectly, more than 26 million people in the State of São Paulo with treated water, through approximately 6.5 million connections. And almost 19 million people with sewage collection. It also has individual contracts with certain municipalities for wholesale water supply.
Sabesp maintains the social responsibility commitment, providing products and services within the parameters of social justice, with respect to consumers rights and a permanent concern of informing and educating people for conscious water consumption. In order to do so, the Company has open communication channels such as:
Ombudsman a qualified second instance communication channel where customers can express their dissatisfaction and difficulties regarding the Company and where they receive full attention, assessment and servicing.
Virtual Agency by internet, customers can request emergency services, maintenance services, obtain 2nd copy of bills, consult their last 12 month consumption, be informed about the date in which the property water consumption will be read, besides obtaining information on tariffs and services. In 2007, Sabesp started a project of reformulating the Virtual Service Agency in order to provide its services by means of customers life situation and events.
Commercial Agencies There are 342 service agencies distributed throughout the State, through which, the customers may request, personally or through telephone contact, any kind of service, clarify doubts and complain or file claims. Besides agencies installed in Poupa Tempo Sé, Santo Amaro, Itaquera, São Bernardo do Campo and São José dos Campos.
RELATIONSHIP WITH EMPLOYEES
Management and employees, regardless of their hierarchical position, perform their duties based on ethical behavior, without discrimination of origin, race, gender, color, age or any other kind of discrimination. This is a commitment expressed in the Sabesp Code of Ethics and Conduct, and is reflected in the transparent policies of personnel management and in hiring, development, performance evaluation, and remuneration processes.
25
RELATIONSHIP WITH SUPPLIERS
The recently created regulatory framework of the basic sanitation sector (Law 11.445/07) inserts the Company in an environment in which commercial practices must take into consideration the rules of the competitive defense legislation, specifically in Law 8.884/94. In this same line, in the year 2007, Sabesp gave maximum publicity to the market concerning its purchasing planning, stimulating competitors. With this, Sabesp intends to invest in a cost effective and efficient manner, acting in a foreseeable and stable way.
The company created its Public Purchasing Competition Guidelines (Diretrizes Concorrenciais nas Compras Públicas) in which it establishes general guidelines for increasing the range of suppliers and promoting competition. Furthermore, it seeks the suppliers qualification in biddings process and the fortuitous creation of barriers to avoid the entry of new competitors.
Another Sabesp initiative was signing the technical cooperation agreement with the competitors rights organizations Economic Monitoring Secretariat (Secretaria de Acompanhamento Econômico (SEAE)) and Economic Rights Secretariat (Secretaria de Direito Econômico (SDE)) , which foresees information sharing, technical aid and preparation of analysis and studies in competition and economic regulation areas related to the basic sanitation sector.
Sabesp Online Auction, national reference on biddings process, is constantly improved, in order to stimulate competitors and bring more safety to this procedure. Among the innovations there are the standard messages catalog, the grouping of items in strategic batches, the 5-minute postponement in the bidding phase, external monitoring of the site and digital certification.
RELATIONSHIP WITH INVESTORS
Sabesp is listed in Bovespa Novo Mercado (São Paulo Stock Exchange) and in NYSE (New York Stock Exchange). The Relationship with Investors Department has a dedicated team of executives composed of the Chief Financial Officer and Investor Relations Officer, Head of Investor Relations, Manager and Analysts
Sabesp has several communication channels with the market. Besides the regular relationship channels, such as site visits, and meetings with capital market analysts and investors, participation in events, seminars and conferences, the Company has IR website dedicated to investors and shareholders, with the relevant information from the Company.
The corporate governance best practices and the constant interest in the Company have encouraged the coverage of sell side analysts. At the end of 2007, Sabesp had eleven well-known national and foreign institutions that were covering Sabesp papers. At Bovespa, the amount of shares traded reached 4.7 billion and a daily average volume of R$15.3 million. At NYSE 81.2 million ADRs were traded, equivalent to, approximately, 162.4 million shares and a daily average volume of US$13.6 million.
These initiatives have brought a differential in visibility, transparency and liquidity with positive effects in the perception of the Companys credit risk, thus contributing to the institutional image and sustainability.
RELATIONSHIP WITH THE SOCIETY
Sabesp does not measure efforts to get closer and maintain dialogs with all sectors of society, such as surrounding communities, non-governmental organizations, and Government, because it believes that partnerships are instrumental for the sustainable development and improvement in quality of life. Therefore, the Company has built alliances with representative instances of the civil society.
The Company believes that guidelines and projects of such a nature promote social responsibility, demanding daily effort and coherence between speech and practice, attitude, action and commitment in relation to society, mainly in relation to future generations.
It is worth stressing the meetings with community leaders and the community participation programs. Both initiatives have as objectives, the closer relationship between Sabesp and the community, dweller associations, leaders, city halls, councils and civil society representatives. In the meetings and regular visits program, the Company aims at identifying demands, prioritizing and intermediating solutions. Sabesp relies on approximately 50 employees, acting as community agents, who have performed 21 meetings with the community in 2007, involving a population of over 2.4 thousand people. The Community Participation Program serviced a population greater than 41 thousand people in meetings and community visits.
ECONOMIC-FINANCING PERFORMANCE INDICATORS
Operating Revenue
26
The gross operating revenue totaled R$6.4 billion, 7.8% higher than in the previous year, due to the 4.12% tariff readjustment and to the 3.1% increase in the volume of billed water and sewage. The net operating revenue reached R$6.0 billion, an 8.0% increase compared to the same period in the previous year.
Operating Result
EBITDA (Earnings Before Interests, Taxes, Depreciation and Amortization) moved from R$2.4 billion in 2006 to R$2.7 billion in 2007, a 10.3% increase. EBIT (Earning Before Interests and Taxes) increased by 15.1% to R$2.1 billion in 2007 from R$ 1.8 billion in 2006.
EBITDA of R$2,698.9 million (R$2,446.2 million in 2006) is formed by the operating profit of R$1,515.4 million (R$1,240.7 million in 2006), added to the values of depreciation and amortization expenses of R$622.5 million (R$642.2 million in 2006) and financial and exchange variation expenses, net of R$561.0 million (R$563.3 million in 2006).
Net Income
The net income reached R$1.05 billion in 2007, a 34.6% increase over the previous year.
27
Indebtedness Evolution
In 2007, the Company amortized R$734.8 million in its debt and contracted new debt in the amount of R$222.5 million. The net balance was a R$512.3 million drop in total indebtedness. As a consequence, the total debt to EBITDA ratio recorded an expressive improvement, from 2.6x in 2006 to 2.1x in 2007. Foreign exchange variation dropped from 23.3% to 21.9% . The net debt/EBITDA improved from 2.45x to 1.93x. The net debt to shareholders equity moved from 66.5% to 53.4% .
In order to make effective the Multi-Annual Investment Plan, Sabesp is negotiating and has already contracted for its programs, the following loans and financings:
Environmental recovery program of the baixada santista metropolitan region
Financing agreement, which was guaranteed by the federal government, in the amount of 21.320 million japanese Yens, equivalent to approximately R$338 million, dedicated to the environmental recovery program of the Baixada Santista metropolitan region, known as Onda limpa, an investment of approximately R$1.2 billion. Up to this moment, approximately, 10% of the total amount has been disbursed.
Financing agreement totaling R$130 million for "Onda limpa" program matching funds. This amount represents 10.8% of the current amount of the total investment.
Environmental sanitation program of the upper Tietê water resources
Financing of US$129 million out of the US$281.8 million of the total budget for the Water Source Program (Programa Mananciais), whose general coordination will be made by the Sanitation and Energy Secretariat of the State of Sao Paulo (Secretaria de Saneamento e Energia do Estado de Sao Paulo). The largest amount of the resources financed, US$100 million, will be directed to Sabesp, whose matching funds will reach US$25 million, therefore totaling US$125 million from the total amount. Sabesp received from IBRD, in October, the drafts of the contract pre-negotiations and is waiting for approval of Project Law 1,145/07 which will authorize the State to be accountable before the Federal Government for this financing.
Integrated Program for Environmental Improvement in the Billings reservoir Springs Area in São Bernardo do Campo
Sabesp has been negotiating a financing for a sanitation program in the city of São Bernardo do Campo for the environmental improvement of the Billings spring. The total investment of the Pro-Billings Program (Programa Pró-Billings) amounts to US$98.9 million. Sabesps participation corresponds to 73.4% of the general budget, being US$55.9 million from financing before the JBIC (56.5%) and US$16.7 million as matching funds (16.9%) .
28
The letter of understanding was approved by the External Financings Committee - COFIEX in September 2007 and the contract signing is forecast for 2008, during the celebration of the 100-year anniversary of the Japanese Immigration in Brazil.
Tietê Project Phase II
Inter-American Development Bank (IDB)
Financing for Phase II of the Tietê River Clean-up Program in the São Paulo Metropolitan Region, is now in the final phase of disbursement. Until December 2007 US$197 million were disbursed from the total of US$200 million contracted.
Banco Nacional de Desenvolvimento Econômico e Social (BNDES) The Brazilian Development Bank
BNDES finances part of Sabesp matching funds from Phase II, by means of a contract in the amount of R$240 million. Until December 2007 around 90% of the financed amount was disbursed.
Tietê Project Phase III
Inter-American Development Bank (IDB)
In order to proceed with the Tietê River Clean-up Program in the São Paulo Metropolitan Region, Sabesp has made a financing request to IDB, in the amount of up to US$600 million, for a total investment program of US$800 million.
In the first half of 2008 obtaining of an authorization from COFIEX is foreseen from the Ministry of Planning, for the negotiation with IDB.
Sanitation for All Program (PAC 2007)
In 2007 a total of 21 projects in several cities in the State of SãoPaulo were selected by the Ministry of Cities. Out of these, 20 agreements were signed with Caixa Econômica Federal (CEF) in a total financed amount of R$484 million, and a contract in the amount of R$130 million was signed with BNDES. A total of R$614 million in financing was contracted for investments of around R$715 million.
Sanitation for All Program (PAC 2008)
In August 2007 the Ministry of Cities selected 81 projects from Sabesp for cities located in three metropolitan regions of São Paulo State, with a total investment of R$960 million and a financed amount of R$800 million. In March, 2008, the Ministry of Cities authorized contracting all developments currently in progress. Financing agents for these projects will be Caixa Econômica Federal, with 71 projects and R$625 million of funding and BNDES with 10 projects and R$175 million of funding.
A second selection was carried out by the Ministry of Cities in October 2007. In this process the Company registered 116 proposals, equivalent to a total financed amount of R$245 million, out of which 22 were selected, corresponding to the total investment of R$137 million and financed amount of R$126 million. The final authorization and contracting of these financial operations should occur during the year 2008.
Loans
In 2007, Sabesp did not reach national or international capital markets. During this period the Company amortized R$333.7 million in debts that had been contracted from the local capital market.
Also in 2007, Sabesp began structuring a financing with IDB a loan under the A/B Loan structure, in the amount of up to US$250 million. The resources from this loan are dedicated to the Company investment program, more specifically for the conclusion of supplementary works of the Tietê Project Phase II and for anticipating the beginning of Phase III of the same project, as well as for debt refinancing due during the year 2008. These new resources are forecast for the beginning of the first semester of 2008.
Refinancing of Resources
PRODES National Program of Water Basins Clean-up of the Water National Agency ANA
Sabesp has its ETE Taubaté/Tremembé enterprise, under construction, approved in the selective process of the Water Basins Clean-up - PRODES/2007.
29
In October 2007 a contract was signed to provide financing stimulus for treated sewage. The amount of resources that will be given is R$16 million, being R$13 million from the Federal Government General Budget (Orçamento Geral da União OGU) and R$2.8 million from CEIVAP Committee for Integration of the Paraíba do Sul River Water Basin.
Capital Markets
In 2007, Sabesp shares traded at Bovespa reached a par value of 12%, ending the year at R$41.13. The shares were present at 100% of the trading days, with daily average volume of R$15.3 million, a 37% increase over 2006. The average daily trading volume was 49% higher than the previous year.
Sabesp ADRs traded at NYSE ended the year at US$47.00, a par value of 39%. 81 million of ADRs were negotiated, with a movement of more than US$3.4 billions in 2007. The average trading volume was US$13.6 million, a 74% increase over 2006.
In June 2007 Sabesp approved a reverse stock split of 125 common shares into one common share which up to that time were traded at Bovespa in blocks of one thousand shares. This reverse stock split also impacted in the shares traded in the American market, since each American Depositary Receipts ADR, traded at the New York Stock Exchange NYSE, up to that moment at the ratio 1 ADR for 250 shares, began to be traded in the ratio 1 ADR per 2 shares. The reverse stock split was better from a market standpoint, since it is easier to compare their business with other papers and other trading forms.
After five years of Bovespa Novo Mercado listing segment and in NYSE and after the 2nd offering in 2004, the Company presentes the following evolution:
2002 | 2007 | |
Bovespa - SBSP3 | ||
Share value (R$) | 18.68 | 41.13 |
Average daily trading volume (R$ million)* | 4.4 | 15.3 |
Average daily trading volume* | 223 | 588 |
Bovespa Free Float (%) | 26.5 | 27.2 |
NYSE SBS | ||
ADRs values (US $) | 11.15 | 47.00 |
Average daily trading volume (US$ million)* | 0.6 | 13.6 |
ADRs outstanding (million) | 4.3 | 25.8 |
NYSE Free Float (%) | 1.95 | 22.6 |
* The fiscal year 2002 considers the period from April to December for the shares traded at Bovespa and from May to December for the ADRs
Throughout 2007, shareholders received dividends relative to 2006 in the amount of R$9.51 per 1,000 shares. For 2007, the Board of Directors proposed the distribution of dividends in the amount of R$300.7 million, which corresponds to 28.7% of the net income, equivalent to approximately R$1.32 per share.
Sabesp has corporate credit rating BB- in the Standard & Poors (S&P) risk classification of global scale, and A+(bra) in S&P national scale and in Fitch Ratings. For the issuance of Eurobonds with maturity in 2016, the corporate rating attributed by Fitch was BB. In Fitch vision the rating perspective is stable. In S&P view, the rating perspective is positive, due to the strengthening of the indicators and of Sabesps financial profile.
COST REDUCTION
Created in 2007, the executive group for management improvement and reduction of cost and expenses has two lines of performance:
Cost and expenses Management Development of tools for information and support of managerial decision, highlighting two actions:
The budget of expenses is now designed for five years. This allows a more precise planning for the several Executive Officer and also a cost reduction goal definition in medium term, among other gains; Development and availability of information system for cost management, together with professional training in order to provide regional managers with a detailed analysis of the costs incurred in the Companys several areas and departments.
30
Costs Reduction and expenses - After mapping the accounts, specific projects were created. The main lines of performance were:
In 2008, the program for cost reduction will continue to be part of the Company strategic objective inserted in the BSC.
Reduction of Costs with Electric Power
In 2007, actions aimed at the reduction of electric power expenses, optimization of the contracts with the electric power concessionaries in several operational and administrative installations were initiated, with estimated savings of R$8 million/year; study for migrating other consumer units to the Free Market; and study for the use of existing electric power generation potential in Sabesp installations (hydroelectric and biomass).
Since the migration of 11 large installations to the Free Market, in 2004, Sabesp has obtained the following savings:
Year | 2004 | 2005 | 2006 | 2007 | Aggregate |
Saving (R$ million) | 9.4 | 24.9 | 31.6 | 40.0 | 105.9 |
Tariffs
As of September 10, 2007, tariffs related to water supply and sewage services were readjusted in a non linear way, in 4.12%, except tariffs related to consumption higher than 20 m³/month in the non residential category and which were readjusted according to the IPCA index, accumulated from August 2006 to July 2007. The index was 3.74% .
Besides reinstating the annual inflation and maintaining Sabesps capacity of handling the costs and expenses arising from the rendering of basic sanitation service, the objective of the differentiated readjustment was to balance the participation among the several consumption ranges.
Responsibility with collaborators
The Company has 16,850 employees, of which 81.5% are men and 18.5% women, with an average tenure of 16 years with Sabesp, there is a concentration of 66.9% above the age range of 40. It must be emphasized that 44% of the employees have High School education level and 32.2% have University education level. Conc erning ethnic distribution, there are 85% white, 13.5% Black/mullatos, 1.3% yellow/Indians and 0.2% not declared.
Sabesp, due to the fact that it is a mixed economy company, is obliged to carry out public selections to hire its employees and guarantees 5% of the positions offered to people with impaired capabilities, in accordance with decree 3,298 from 1999. The Company is recognized for the job opportunities created for the physically impaired and therefore was granted, in 2005, the seal Empresa Solidária, by Avape. In 2007, Sabesp had 54 disabled employees working in the Call Center in the RMSP and in the Poupa Tempo agencies at Sé, Itaquera, Santo Amaro and São Bernardo do Campo.
For employees with children or dependents who are physically and/or mentally impaired, Sabesp offers special daycare center which reimburses expenses with rehabilitation institutions and special schools.
Organizational Climate
31
Collaborators satisfaction and commitment with the Company are an essential reference for Sabesp. Therefore, they are annually monitored by an Organizational Climate Survey which is voluntarily and confidentially answered, carried out and consolidated by an external consulting company. In the 2007 cycle, the return index was 71% and the favorability indicator was 65 points, a result that presents gradual and significant increase of this indicator which was 59 in 2005.
The results suggest that the Company advances in challenging goals, taking into consideration the expectations of employees. The results generate action plans and contribute to the good internal organizational climate, key-element to strengthen the company results and business strategies.
The goal for 2010 is to be ranked as one of the best companies to work for, with a favorability index of 71%.
People Management by competence
The model of management by competence adopted by the Company relies on the effective participation of all employees. The model stimulates performance, competence, investment in continuous qualification and professional development, and facilitates diversity, life quality of the employees as well as of the volunteer work. The participation becomes effective through the Human Resources Strategic Committee composed of representatives of all Executive Office and works as a forum for sharing decisions and as a communication channel between the Company and the employee.
The model integrates Screening, Development, Performance Evaluation and Remuneration processes in order to foster continuous training and exchange of experiences in the workplace, thus contributing to a better corporate performance. For screening and hiring, Sabesp complies with the specific legislation carrying out Public Entrance Exam, looking for competent, qualified, and committed professionals for the strategic objectives development and fulfillment.
In 2007, Sabesp performed two examinations for qualified trainees in order to fill in 702 vacant positions. There was a total of 9,207 candidates.
Qualification and development
Sabesp Corporate University is responsible for the institutional teaching-learning process, directed to employees, families, suppliers, service providers, communities and population in general. This approach allows for the alignment between the corporate objectives and the people development and progress. For disseminating knowledge in an flexible way, and to the largest possible number of people, the company adopts classroom and distance learning, with an investment of R$6.5 million, guaranteeing 102 thousand participations in training activities, which corresponds to 48 training hours.
Occupational health and safety
Occupational health and safety management has, as an objective, to guarantee safer working conditions, promote valuation of work processes and added value to the organization through its employees and contractors. This aspect was validated with the maintenance of the integrated certification, which took place in 2007, and that has, as a baseline, the ISO 9001:2000 (quality) and OSHAS 18001:1999 (Occupational health and safety) norms.
For reducing the number of occupational accidents and strengthening the culture of prevention, in 2007 Occupational Health and Safety Technical Group was constituted to become a representative technical forum to address issues related to the Occupational Health and Safety System and review Safety Procedures. Additionally, the courses and lectures which focused on prevention of occupational accidents were intensified.
Sabesprev Pension Plan
Sabesp Foundation of Social Security (Fundação Sabesp de Seguridade Social - Sabesprev) is a nonprofitable, closed entity supplementary pension plan, which has, as its basic purpose, the administration of Benefit Plans of a private pension and a service assistance nature. Sabesp contributed to Sabesprev, in 2007, with R$15.9 million in private pension, therefore assuring its employees of the possibility of enjoying pension plan benefits supplementary to the Official Social Security.
Social investment and institutional support for projects
32
Aiming at establishing criteria for volunteer allocation of financial resources and/or in cash, directed to the public interest, the Orientador de Apoio Institucional e Financeiro. Social action was created in 2007, including those based on tax incentive laws, must necessarily add value to Sabesps brand name, emphasizing environmental preservation, maintenance and sustainability.
Investment in Cultural Projects
Sabesp has invested R$10 million in tax incentives in projects, based on Rouanet Law (Federal Law 8. 313/91 of Dec. 23,1991) and Audiovisual Law (Federal Law 8.685 of July 20, 1993, with wording altered by Law 11.437 of 2006). Among the various projects we shall mention: XXXVII Festival de Inverno de Campos do Jordão, Projeto Bem Te Vi, Estação Pinacoteca, Digitalização e Catalogação da Documentação Sonora Museu Imagem Som, Quatrocentos Contra Um, A Casa de Alice, O Poeta da Vila, Onde andará Dulce Veiga.
We must also emphasize the continuity of the recovery of the historical, architectural, and documental sanitation asset, with visits the Sanitation Regional Museum "Palácio Saturnino de Brito" with the objective of preserving the Baixada Santista sanitation history.
Social Programs
In 2007 Sabesp assisted approximately 1.1 thousand people in the State of São Paulo through its social projects directed to the external community, in the areas of education, health, hunger prevention, sports and culture.
Voluntary Action Programs
In accordance with the São Paulo Volunteer Work Center the new attitude of the companies towards business management, committed with ethics and sustainable development, has positive impacts on all publics. Corporate social responsibility is a competitive differential, bringing employees and customer fidelity and improving quality of life for the communities.
In its commitment with the development of society, Sabesp has invested in a variety of projects, counting primarily on the potential of its employees that embrace ideas and gather efforts to benefit social and environmental causes, thus creating the necessary changes for a harmonious life in a sustainable world.
Nowadays, Sabesp has a large network of volunteers, involved in a diverse range of social projects, spread in all units, throughout the State of São Paulo.
Sabesp open to the community
Sabesp seeks to communicate with the community and facilitate the access to its sites. In order to do so, it has permanent relationship programs, such as the show room project with more than 300 monitored visits, attending approximately 13 thousand people. In 2007, additional 403 site visits were provided to: Guaraú, Estação Elevatória de Santa Inês (Pumping Station) and Reservatório Paiva Castro (Reservoir). Almost 14 thousand people were attended. Furthermore, 775 employees children participated in the A day at Sabesp (Um dia na Sabesp) program carried out through 18 monitored events.
33
Annual Social Statement / 2007
CIA DE SANEAMENTO BÁSICO DO ESTADO DE SP
1. Calculation basis | Amount 2007 (Reais 000) | Amount 2006 (Reais 000) | ||||
Net Income (NI) | 5,970,842 | 5,527,333 | ||||
Operating income (OI) | 1,515,447 | 1,240,712 | ||||
Gross Payroll (GP) | 1,171,991 | 1,176,252 | ||||
2. Internal Social Indicators | Amount | % over GP | % over NI | Amount | % over GP | % over NI |
Meals | 88,622 | 7.56% | 1.48% | 82,195 | 6.99% | 1.49% |
Compulsory social burdens | 108,271 | 9.24% | 1.81% | 116,770 | 9.93% | 2.11% |
Private pension | 58,788 | 5.02% | 0.98% | 60,070 | 5.11% | 1.09% |
Health | 85,185 | 7.27% | 1.43% | 79,725 | 6.78% | 1.44% |
Occupational health and safety | 7,343 | 0.63% | 0.12% | 5,704 | 0.48% | 0.10% |
Education | 849 | 0.07% | 0.01% | 746 | 0.06% | 0.01% |
Culture | 705 | 0.06% | 0.01% | 732 | 0.06% | 0.01% |
Training and professional development | 5,365 | 0.46% | 0.09% | 6,194 | 0.53% | 0.11% |
Daycare or daycare allowance | 1,491 | 0.13% | 0.02% | 1,550 | 0.13% | 0.03% |
Profit sharing | 47,734 | 4.07% | 0.80% | 75,975 | 6.46% | 1.37% |
Others | 3,125 | 0.27% | 0.05% | 3,335 | 0.28% | 0.06% |
Total Internal Social Indicators | 407,478 | 34.77% | 6.82% | 432,996 | 36.81% | 7.83% |
3. External Social Indicators | Amount | % over OI | % over NI | Amount | % over OI | % over NI |
Education | 1,574 | 0.10% | 0.03% | 2,000 | 0.16% | 0.04% |
Culture | 16,376 | 1.08% | 0.27% | 15,116 | 1.22% | 0.27% |
Health and sanitation | 1,249 | 0.08% | 0.02% | 287 | 0.02% | 0.01% |
Sports | 958 | 0.06% | 0.02% | 753 | 0.06% | 0.01% |
Hunger prevention and food safety | 0 | 0.00% | 0.00% | 0 | 0.00% | 0.00% |
Others | 6,952 | 0.46% | 0.12% | 5,776 | 0.47% | 0.10% |
Total contributions to society | 27,109 | 1.79% | 0.45% | 23,932 | 1.93% | 0.43% |
Taxes (excluding social burdens) | 1,136,948 | 75.02% | 19.04% | 1,035,912 | 83.49% | 18.74% |
Total External Social Indicators | 1,164,057 | 76.81% | 19.50% | 1,059,844 | 85.42% | 19.17% |
4. Environmental Indicators | Amount | % over OI | % over NI | Amount | % over OI | % over NI |
Investments pertaining to production / company operations | 136 | 0.01% | 0.00% | 80 | 0.01% | 0.00% |
Investment in external programs and/or projects | 48,077 | 3.17% | 0.81% | 1,461 | 0.12% | 0.03% |
Total Investments in the environment | 48,213 | 3.18% | 0.81% | 1,541 | 0.12% | 0.03% |
Concerning annual goals to minimize waste, the general consumption in production/operations and increase efficiency in the use of natural resources, the Company: | ( ) has no goals ( ) complies from 0 to 50% ( ) complies from 51 to 75% (x) complies from 76 to 100% |
( ) has no goals ( ) complies from 0 to 50% ( ) complies from 51 to 75% (x) complies from 76 to 100% |
||||
5. Staff Indicators | 2007 | 2006 | ||||
No. of employees at the end of the year | 16,850 | 16,978 | ||||
No. od admissions during the period | 47 | 150 | ||||
No. of contractor employees | 0 | 0 | ||||
No. of trainees | 337 | 350 | ||||
No. of employees above 45 years of age | 8,986 | 8,482 | ||||
No. of women working in the company | 3,117 | 3,143 | ||||
% of management positions occupied by women | 19.03% | 17.07% | ||||
No. of black employees in the company | 2,277 | 2,164 | ||||
% of black employees in management positions | 4.50% | 3.56% | ||||
No. of employees with impaired capabilities or with special needs | 52 | 34 | ||||
6. Relevant information concerning the practice of corporate citizenship | 2007 | 2008 Goals | ||||
Ratio between highest and lowest wages in the company | 29.66 | nd | ||||
Total number of work related accidents | 351 | 276 | ||||
Social and Environmental programs were developed by: | ( ) directors | (x) directors and managers |
( ) all employees | ( ) directors | (x) directors and managers |
( ) all employees |
The safety and health standards in the workplace were defined by: | (x) directors and managers |
( ) all employees | ( ) all employees + CIPA |
(x) directors and managers |
( ) all employees | ( ) all employees + CIPA |
Concerning freedom of union representation, collective agreement negotiation and internal representation of employees, the company: | ( ) is not involved |
(x) abides by WLO norms |
( ) Fosters and abides by WLO norms |
( ) will not be involved |
(x) will abide by WLO norms |
( ) will foster and abides by WLO norms |
Private pension encompasses: | ( ) directors | ( ) directors and managers |
(x) all employees | ( ) directors | ( ) directors and managers |
(x) all employees |
Profit sharing encompasses: | ( ) directors | ( ) directors and managers |
(x ) all employees | ( ) directors | ( ) directors and managers |
(x) all employees |
In choosing suppliers, the same standards of ethics and social and environmental responsibility adopted by the company: | ( ) are not considered |
( ) are suggested | (x) are required | ( ) will not be considered |
( ) will be suggested |
(x) Will be required |
Concerning employee participation in volunteer work, the company: | ( ) is not involved |
( ) supports | (x) organizes and motivates |
( ) will not be involved |
( ) will support | (x) will organize and will motivate |
The total number of complaints and criticism from consumers received at the specific area of the company ( ouvidoria ) : | at the company 21,145 |
at Procon 2,662 |
At court (expressinho ) 671 |
at the company n/a |
at Procon n/a |
At court (expressinho ) n/a |
% of complaints and criticism addressed or solved: | at the company 97.1% |
at Procon 95.71% |
At court (expressinho) 57.42% |
at the company n/a |
at Procon n/a | At court (expressinho) n/a |
Total Added Value for distribution (in R$ 000) | In 2007: 3,986,473 | In 2006: 3,649,357 | ||||
Distibution of Added Value (DAV) | 28.6% government 27.6% employees 7.5% shareholders 17.5% contractors 18.8% withheld |
28.4% government 31.4% employees 7.4% shareholders 18.9% contractors 13.9% withheld | ||||
7. Other Information | ||||||
"This company does not use child or slave labor, has no involvement with prostitution or sexual exploitation of children or adolescents and is not involved with corruption Our company values and respects internal and external diversity. |
34
Environmental Management
Sabesp Environment Policy, issued in 1998, was revised in 2007 in order to establish new guidelines for environmental management and positions Sabesp as an Environmental Solution Company, whose natural vocation, due to its line of products and services, that offers to the market.
The preparation of the new Policy relied on direct participation of society. Two public hearings were carried out and the draft remained available on the internet for comments. Consonant with the most modern concepts, the policy has as guideline a corporate performance, taking the environment into consideration in a systemic way, conducting it to an integrated planning and sustainability of the process in economic, environmental and social dimensions and of the rational use of natural resources.
Environmental Objectives and Goals
Sabesp began 2007 adopting a new administration model that considers environmental management as one of its strategic objectives. In order to comply with this objective, aligned with the Environment Policy, some environmental goals have been established, among which:
Environment Management Network
In 2007, the Company began to change the process for organizational structure realignment with renewed emphasis on environmental issues. It is a huge challenge, considering the dimension and diversity of the Company, and its decentralized business management.
The Environment management was incorporated to the new Technology, Enterprise and Environment Office that created the Environment Management Department. An Environmental Legal Area has also been created. For establishing integrated performance and administrating specific environment demands from each Business Unit, Environmental Management Nucleuses (NGAs) are being implemented to act as operating agents for environmental management, streamlining the information flow.
Iso 14001 Certification
ISO 14001 Certification is an objective to be sought by the entire Company. The goal for the programs 1st phase is to certify 10% of the operating units by the end of 2010, which corresponds to 65 Water Treatment and/or Sewage Treatment Stations.
Management of Environmental Conformity
Management of environmental conformity is greatly related to compliance with the Conduct Adjustment Terms (TACs) and Legal Agreements, and to maintain and regulate environmental licenses and grant the use of water resources rights of part of the existing operating plants. With the purpose of standardizing the approach to legal support activities in an efficient, effective and corporate manner, Sabesp began working on the qualification of
35
internal experts and technical assistants. The required activities have been implemented with strict technical and administrative severity aiming at finding solutions to environmental demands. Compliance with the commitments arising from the agreements and adjustments are foreseen in the budgetary planning.
Considering the need of periodic renovation of licenses and grants, Sabesp has been improving management instruments for monitoring its activities and installations when it comes to meet technical demand from prevailing licenses and grants in force and needs to regularize existing operating plants. In new developments, the feasibility and environment conformity analysis are present in the stages of conception, implantation and operation.
Participation in Water Resources Panel
Water resources panel comprises all sectors directly or indirectly involved in the participative management of hydro resources, gathering efforts from Government, users and civil society. This makes easier the inter-institutional integration and the actions planning.
Due to the importance of active and qualified participation of Sabesp representatives in plenary sitting and Technical Chambers, the guidelines for institutional representation have been established. In 2007 the first guiding document was prepared for this purpose, called Guidelines for institutional representation before state and national systems for management of water resources (Diretrizes para representação institucional junto aos sistemas nacional e estadual de gestão de recursos hídricos), which presents the representation principles, guidance for representatives indication and responsibilities involved, among others, making feasible the homogeneous and organized performance in these forums. Sabesp is present in 26 State Water Basin Committees, three Federal Water Basin Committees, 74 State Technical Chambers, and a Federal Technical Chamber; and has hosted meetings and received visits from the members of these committees.
Environmental Education
In 2007, Sabesp began structuring the Corporate Environmental Education Program, whose objective is to spread the environment sanitation culture to all Companys employees and interested audiences, making possible an articulated, integrating and strategic vision about the environmental theme in the Company. The process will directly involve 900 managers and employees from all Sabesp Office, during the training which will take place during 2008 and will allow the selection of 100 employees who will receive additional qualification to perform as multiplying agents of Sabesps Environmental Education.
Environment Educational projects directed to the community convey concepts in a recreational and interactive way, by means of drama, dance, music, mimicry, drawing and handouts which are especially oriented to teenagers, public and private students, teachers and low income communities. Among the several projects we highlight: Sabesp nas Escolas, Clubinho Sabesp, Educando para a Cidadania, Visitas Monitoradas with participation of 790 people in 2007. We also stress the Sabesp Ensina project, available in the Company website, with and average of 190 thousand participants per months.
Cleaner Production
Sabesp has adopted, as a strategy, the carrying out of its operations aiming at gaining environmental efficiency in both natural resources and energy inputs. In this sense, Sabesp participated in the foundation of the Paulista Round Table of Cleaner Production, in 2002, and is still an acting member. In 2007, the Company strengthened its performance in this area and included the Cleaner Production as an area of knowledge at Sabesp Corporate University level.
Carbon Emission Management
Sabesp has established, as one of its corporate goals, the maximization of participation opportunities in the Carbon Credit Market. In order to do so, it decided to participate in the Carbon Disclosure Project (CDP) in 2006 and 2007. A publication was issued for preparation of the first inventory of emission of greenhouse gases, together with the feasibility study of projects capable of generating credits of certified reductions of emissions and emission control and carbon sequestration, as well as to assess the Sabesp renovation of vehicles fleet considering the reduction of greenhouse emission.
Meanwhile, Sabesp systematically invests in training for its technical and managerial board so that they are able to operate with proficiency in this new and important global challenge.
36
Environmental Best Practices
Plantation and Nursery Program Sabesp keeps, in the RMSP, the forestry nurseries of Jaguari, in Vargem Grande County, and Morro Grande in the city of Cotia, whose total production capacity is of approximately 300 thousand seedling per year.
Green Life Program (Verde Vida) This program aims at the recovery of Canoas and Paraíba river riparian woods, in the city of Franca and in the region of São José dos Campos, respectively, in partnership with local community and civil society. These initiatives promoted, in 2007, the planting of 17 thousand plants, totaling more than 127 thousand new plants since 2001. Additional 74 thousand plants are scheduled to be planted in 2008, in partnership with the Municipal Education Secretariat, comprising schools preferably located in the environmental recovery areas.
Rehabilitation of the Cantareira System Since 1996 the Company has been developing a project for soil restoration and reforestation of the degraded areas that surround the Cantareira System. During the last 10 years, 500 thousand new plants were planted, among which the predominant species are natural from the Atlantic Forest.
Bio-solid This project was developed for the adequate treatment of the sludge resulting from the sewage treatment stations, transforming it in fertilizer and conditioner for agricultural application. With this measure, Sabesp avoids disposal of the sludge in landfills, which are becoming increasingly restricted and of high operational cost, and transforms the main operational waste into product. Throughout 2007, more than 16 tons of bio-solids were applied in approximately 400 hectares of agricultural area in the region of Franca.
Project for minimizing and destination of solid waste The main actions carried out in this project were the selective disposal of paper, suppression of some disposable items from the restaurant and the composting of 120 kg/day of organic waste.
In 2007, the 2nd phase of the project was started, in the Administrative Complex of Costa Carvalho, aiming at reducing the generation of waste by 30% in 2008. Among the activities planned, we highlight:
RECYCLE PAPER
Sabesp uses approximately 2.4 million recycled sheets of paper per month (around 12 tons of paper, preserving the equivalent of 288 trees), for printing administrative letters, and also monthly water and/or sewage service bills.
SUSTAINABILITY HEARINGS
Events conceived for presentations of environmental, leisure, sporting, cultural, scientific, social and artistic projects aiming at the promotion of sustainability, seeking its feasibility through partnership and sponsorships. The purpose of these hearings is to narrow the bonds between the Company and society, academic and nongovernmental entities. Each event has its own theme and starts with presentation of work developed from the projects which have been implemented or proposed by third sector and public entities.
The theme of the 1st hearing, held in November, was the Tietê river metropolitan area and had the participation of the Instituto Navega São Paulo, that belongs to the artist Eduardo Srur. The 2nd hearing addressed the theme of used cooking oil as raw-material for the production of bio-diesel, soap, paint and other products and
37
alternatives that avoid the contaminating effect of the oil in the bodies of water and the consequent clogging of the network. For 2008, other hearings are expected.
PARTNERSHIPS
When developing activities on environment education and preservation and recovery of water springs, Sabesp relies on partnership of several NGOs, state institutions, city halls, schools, research institutes, Basin Committees, among others.
AWARDS
Prêmio E-Gov - Excelência em Governo Eletrônico (Excellence in E-Government) - Category G2B Government to Business, in recognition for its constant improvement in the processes through betterment of its actions via electronic relationship with the community and suppliers;
Prêmio Prodes Programa de Despoluição de Bacias Hidrográficas (Water Basins Clean-up Program), granted to Sabesp by the Water National Agency ANA, for the construction of ETE Taubaté, considered the best project among the 50 projects submitted from companies from all Brazilian states;
Prêmio As 10 Melhores Empresas em IDHO 2007(10 IDHO Best Companies, 2007), for its contribution to human development within the organization;
Prêmio Empresa Sustentável 2007 (Sustainable Company Award, 2007), in recognition for work of developing community awareness by means of visits to the Água Rio Grande Treatment Station;
Prêmio Nacional de Qualidade em Saneamento (National Quality Sanitation Award) - PNQS/2007 Levels I, II and III;
Prêmio Nacional de Qualidade em Saneamento (National Quality Sanitation Award) - PNQS/2007 Winner Case in the category Innovation in Sanitation Management;
Prêmio Gestão Banas 2007 - Qualidade (ISO 9001) (Banas Management 2007 Quality), for its high level of development and commitment with the quality system;
Prêmio Benchmarking Ambiental (Environmental Benchmarking Award), for the innovative ways to manage conflicts and for obtaining resources to be invested in environment preservation;
Prêmio Gestão Eficiente de Energia Elétrica e Água (Efficient Management of Electric Power and Water Award);
Prêmio Paulista da Qualidade de Gestão (Paulista Award of Management Quality) (PPQG) - Level III - State Governor Trophy of Management Excellence, for its management model, obtained results and future perspectives;
Prêmio RH Cidadão 2007 (HR Citizenship 2007), for being one of the ten best companies in corporate citizenship;
Prêmio 19 de Março (March 19th Award) Category Electronic Bidding (or Auction) Innovation of Sabesp bidding system, considered one of the best electronic purchasing methods in Brazil;
E-Learning Award (National Reference) granted to Sabesp Corporate University;
Prêmio 100 melhores Empresas de Cidadania Corporativa - RH Cidadão (100 best Corporate Citizenship Companies Award HR Citizenship);
Prêmio TI&Governo (IT & Government Award) - Category E-Public Administration for the projects Sabesp Online Bidding and Bidding Management System SGL.
Prêmio Mario Covas 2007 (Mario Covas Award 2007) Innovations in Public Management The Bidding Management System SGL, was one of the winners in the category "Use of Information and Communication Technologies; Human Resources Category: The paths of a socially responsible company; and Honorable Mention for the work "Implantation of the Water Rational Use Program in Schools from the São Paulo Metropolitan Region.
38
COMPANHIA DE SANEAMENTO BASICO DO ESTADO DE SÃO PAULO - SABESP BALANCE SHEET |
As of December 31, 2007 and 2006 (In thousands of Brazilian reais - R$) |
Assets | Note | 2007 | 2006 | Liabilities and shareholders' equity | Note | 2007 | 2006 | |||||||
Current | Current | |||||||||||||
Cash and cash equivalents | 4 | 464,997 | 328,206 | Accounts payable to suppliers and | ||||||||||
Customer accounts receivable | 5 | 1,207,885 | 1,111,289 | contractors | 165,267 | 144,167 | ||||||||
Transactions with Related Parties | 6 | 338,506 | 367,864 | Loans and financing | 10 | 742,114 | 852,475 | |||||||
Inventories | 53,141 | 48,889 | Accrued payroll and related charges | 166,797 | 177,705 | |||||||||
Recoverable taxes | 9,414 | 31,582 | Taxes payable | 12 | 127,735 | 105,552 | ||||||||
Other assets | 41,782 | 24,124 | Deferred taxes | 11 | 75,249 | 76,359 | ||||||||
Deferred income and social contribution taxes | 11 | 108,792 | 7,078 | Interest on shareholders equity payable | 16(d) | 680,339 | 511,519 | |||||||
Provision for contingencies | 15 | 290,172 | 2,294 | |||||||||||
Total current assets | 2,224,517 | 1,919,032 | Services received | 156,987 | 152,953 | |||||||||
Other liabilities | 50,077 | 78,912 | ||||||||||||
Total current liabilities | 2,454,737 | 2,101,936 | ||||||||||||
Noncurrent | Noncurrent | |||||||||||||
Long -term assets: | Long-term liabilities: | |||||||||||||
Customer accounts receivable | 5 | 278,787 | 296,562 | Loans and financing | 10 | 4,943,121 | 5,474,254 | |||||||
Transactions with Related Parties | 6 | 986,988 | 863,467 | Taxes payable | 12 | 197,635 | 230,440 | |||||||
Indemnities receivable | 7 | 148,794 | 148,794 | Deferred taxes | 11 | 159,865 | 146,901 | |||||||
Escrow deposits | 19,806 | 33,835 | Provision for contingencies | 15 | 655,084 | 655,258 | ||||||||
Other assets | 75,202 | 52,238 | Accrued pension obligation | 13 | 365,234 | 321,212 | ||||||||
Deferred income and social contribution taxes | 11 | 357,226 | 342,654 | Other liabilities | 103,694 | 51,470 | ||||||||
1,866,803 | 1,737,550 | Total noncurrent liabilities | 6,424,633 | 6,879,535 | ||||||||||
Permanent assets: | Shareholders equity | |||||||||||||
Investments | 720 | 720 | Paid -in Capital | 3,403,688 | 3,403,688 | |||||||||
Property, plant and equipment | 8 | 14,060,073 | 13,837,498 | Capital reserve | 124,255 | 106,690 | ||||||||
Intangible assets | 9 | 507,789 | 495,118 | Revaluation reserve | 2,339,829 | 2,427,499 | ||||||||
Deferred charges | 3,474 | 10,035 | Profits reserve | 3,916,234 | 3,080,605 | |||||||||
14,572,056 | 14,343,371 | |||||||||||||
Total noncurrent assets | 16,438,859 | 16,080,921 | Total shareholders' equity | 16 | 9,784,006 | 9,018,482 | ||||||||
Total assets | 18,663,376 | 17,999,953 | Total liabilities and shareholders' equity | 18,663,376 | 17,999,953 | |||||||||
The accompanying notes are an integral part of these financial statements.
39
COMPANHIA DE SANEAMENTO BASICO DO ESTADO DE SÃO PAULO - SABESP STATEMENT OF OPERATIONS |
For the Years Ended December 31, 2007 and 2006 (In thousands of Brazilian reais R$, except per share data) |
Note | ||||||
2007 | 2006 | |||||
GROSS REVENUE FROM SALES AND SERVICES | 19 | 6,448,211 | 5,984,012 | |||
Gross revenue deductions | (477,369) | (456,679) | ||||
NET REVENUE FROM SALES AND SERVICES | 5,970,842 | 5,527,333 | ||||
COST OF SALES AND SERVICES | 20 | (2,695,696) | (2,616,764) | |||
GROSS PROFIT | 3,275,146 | 2,910,569 | ||||
OPERATING EXPENSES | ||||||
Selling expenses | 20 | (639,552) | (719,185) | |||
Administrative | 20 | (559,190) | (387,407) | |||
OPERATING INCOME BEFORE FINANCIAL EXPENSES AND EXCHANGE VARIATIONS, NET | 2,076,404 | 1,803,977 | ||||
Financial expenses, net | 20 | (748,995) | (658,863) | |||
Exchange variations, net | 20 | 188,038 | 95,598 | |||
OPERATING PROFIT | 1,515,447 | 1,240,712 | ||||
NONOPERATING INCOME (EXPENSES) | ||||||
Income | 46,115 | 7,810 | ||||
Expenses | (81,291) | (58,717) | ||||
(35,176) | (50,907) | |||||
INCOME BEFORE INCOME AND SOCIAL CONTRIBUTION TAXES | 1,480,271 | 1,189,805 | ||||
INCOME AND SOCIAL CONTRIBUTION TAXES | ||||||
Current taxes | 11 | (543,345) | (383,123) | |||
Deferred taxes | 11 | 111,777 | 7,345 | |||
INCOME BEFORE EXTRAORDINARY ITEM | 1,048,703 | 814,027 | ||||
Extraordinary item net of income and social contribution taxes | 13(b) | - | (35,122) | |||
NET INCOME | 1,048,703 | 778,905 | ||||
Earnings per share R$(per thousand shares in 2006) | 16(c) | 4.60 | 27.35 | |||
The accompanying notes are an integral part of these financial statements. | ||||||
40
COMPANHIA DE SANEAMENTO BASICO DO ESTADO DE SÃO PAULO - SABESP STATEMENTS OF CHANGES IN SHAREHOLDERS EQUITY |
For the Years Ended December 31, 2007 and 2006 (In thousands of Brazilian reais - R$) |
Note | Revaluation | Profits reserves | ||||||||||||||||
Paid-in Capital |
Tax incentives |
Capital reserve |
reserve | Legal | Investments | Retained earnings |
TOTAL | |||||||||||
BALANCES AS OF DECEMBER 31, 2005 | 3,403,688 | 15,780 | 63,040 | 2,529,771 | 215,273 | 2,254,996 | - | 8,482,548 | ||||||||||
Donations | 16(e) | - | - | 27,870 | - | - | - | - | 27,870 | |||||||||
Realization of revaluation reserve | 8(h) | - | - | - | (102,272) | - | - | 102,272 | - | |||||||||
Net income | - | - | - | - | - | - | 778,905 | 778,905 | ||||||||||
Legal reserve | 16(f) | - | - | - | - | 38,946 | - | (38,946) | - | |||||||||
Interest on shareholders equity | 16(d) | - | - | - | - | - | - | (270,841) | (270,841) | |||||||||
Investment Reserve | 16(f(ii)) | - | - | - | - | - | 571,390 | (571,390) | - | |||||||||
BALANCES AS OF DECEMBER 31, 2006 | 3,403,688 | 15,780 | 90,910 | 2,427,499 | 254,219 | 2,826,386 | - | 9,018,482 | ||||||||||
Donations | 16(e) | - | - | 17,565 | - | - | - | - | 17,565 | |||||||||
Realization of revaluation reserve | 8(h) | - | - | - | (87,670) | - | - | 87,670 | - | |||||||||
Net income for the year | - | - | - | - | - | - | 1,048,703 | 1,048,703 | ||||||||||
Legal reserve | 16(f) | - | - | - | - | 52,435 | - | (52,435) | - | |||||||||
Interest on shareholders equity | 16(d) | - | - | - | - | - | - | (300,744) | (300,744) | |||||||||
Investment Reserve | 16(f(ii)) | - | - | - | - | - | 783,194 | (783,194) | - | |||||||||
BALANCES AS OF DECEMBER 31, 2007 | 3,403,688 | 15,780 | 108,475 | 2,339,829 | 306,654 | 3,609,580 | - | 9,784,006 | ||||||||||
The accompanying notes are an integral part of these financial statements.
41
COMPANHIA DE SANEAMENTO BASICO DO ESTADO DE SÃO PAULO - SABESP STATEMENTS OF CHANGES IN FINANCIAL POSITION |
For the Years Ended December 31, 2007 and 2006 (In thousands of Brazilian reais - R$) |
Note | ||||||
2007 | 2006 | |||||
SOURCES OF FUNDS | ||||||
From operations: | ||||||
Net income | 1,048,703 | 778,905 | ||||
Expenses (income) not affecting working capital | ||||||
Allowance for doubtful accounts long-term accounts receivable | 105,301 | 102,025 | ||||
Depreciation and amortization | 20 | 622,549 | 642,171 | |||
Write-off of investments | - | 20 | ||||
Write-off of property, plant and equipment | 68,568 | 54,350 | ||||
Write-off of deferred charges | 1,276 | 5,195 | ||||
Monetary variations on long-term assets | (15,786) | (11,521) | ||||
Reversal of provision for losses on escrow deposits, net | - | (4,421) | ||||
Provision for contingencies | 287,704 | 75,450 | ||||
Other accruals | 155 | 7,504 | ||||
Accrual for pension obligation | 44,022 | 44,654 | ||||
Interests and monetary and exchange variation on noncurrent liabilities: | ||||||
Loans and financing | (46,141) | 15,733 | ||||
Taxes and contributions | 10,197 | 15,151 | ||||
Deferred taxes: | ||||||
In long-term assets | (14,572) | (43,834) | ||||
In long-term liabilities | 12,964 | 13,458 | ||||
Total from operations | 2,124,940 | 1,694,840 | ||||
From third parties | ||||||
Transfers from long-term to current assets | 351,944 | 394,738 | ||||
Increase in noncurrent liabilities: | ||||||
Loans and financing | 222,474 | 706,774 | ||||
Other increases | 52,069 | 9,306 | ||||
Increase in property, plant and equipment from donation support to construction works | 17,565 | 27,870 | ||||
Total from third parties | 644,052 | 1,138,688 | ||||
Decrease in working capital | 47,316 | 145,532 | ||||
Total sources | 2,816,308 | 2,979,060 | ||||
Uses of funds | ||||||
Increase in long-term assets | 556,140 | 606,197 | ||||
Capitalized amounts property, plant and equipment | 27,371 | 27,902 | ||||
In noncurrent assets | ||||||
Property, plant and equipment | 901,598 | 886,534 | ||||
Intangible assets | 32,818 | 12,630 | ||||
Deferred charges | - | 2,789 | ||||
In noncurrent liabilities | ||||||
Transfers from noncurrent to current liabilities: | ||||||
Loans and financing | 666,757 | 858,532 | ||||
Taxes and contributions | 12 | 43,002 | 40,824 | |||
Provision for contingencies | 287,878 | - | ||||
Early settlement of loans and financing | 10(f(i)) | - | 272,811 | |||
Interest on shareholders equity | 16(f(i)) | 300,744 | 270,841 | |||
Total uses | 2,816,308 | 2,979,060 | ||||
Current assets | ||||||
At end of year | 2,224,517 | 1,919,032 | ||||
At beginning of year | 1,919,032 | 1,725,386 | ||||
Change in current assets | 305,485 | 193,646 | ||||
Current liabilities | ||||||
At end of year | 2,454,737 | 2,101,936 | ||||
At beginning of year | 2,101,936 | 1,762,758 | ||||
Change in current liabilities | 352,801 | 339,178 | ||||
Decrease in net working capital | (47,316) | (145,532) | ||||
The accompanying notes are an integral part of these financial statements.
42
COMPANHIA DE SANEAMENTO BASICO DO ESTADO DE SÃO PAULO - SABESP SUMMARY STATEMENTS OF CHANGES IN FINANCIAL POSITION |
For the Years Ended December 31, 2007 and 2006 (In thousands of Brazilian reais - R$) |
Note | ||||||
2007 | 2006 | |||||
SOURCES OF FUNDS | ||||||
From operations | 2,124,940 | 1,694,840 | ||||
From third parties | 644,052 | 1,138,688 | ||||
Decrease in net working capital | 47,316 | 145,532 | ||||
TOTAL SOURCES | 2,816,308 | 2,979,060 | ||||
USES OF FUNDS | ||||||
Increase in long-term assets | 556,140 | 606,197 | ||||
Capitalized amounts property, plant and equipment | 27,371 | 27,902 | ||||
In property, plant and equipment, deferred charges and intangible assets | 934,416 | 901,953 | ||||
Transfers from noncurrent to current liabilities | 997,637 | 899,356 | ||||
Early settlement of loans and financing | 10(f (i)) | - | 272,811 | |||
Shareholders - interest on shareholders equity | 16(f (i)) | 300,744 | 270,841 | |||
TOTAL USES | 2,816,308 | 2,979,060 |
The accompanying notes are an integral part of these financial statements.
43
COMPANHIA DE SANEAMENTO BÁSICO DO ESTADO DE SÃO PAULO - SABESP NOTES TO THE FINANCIAL STATEMENTS |
For the Years Ended December 31, 2007 and 2006 (Amounts in thousands of Brazilian reais - R$, unless otherwise stated) |
1. OPERATIONS
The Company is a mixed-capital company headquartered in São Paulo, controlled by the São Paulo State Government. The Company is engaged in the provision of basic and environmental sanitation services, and supplies treated water on a bulk basis and provides sewage treatment services to other six municipalities of the Greater São Paulo Metropolitan Area.
In addition to providing basic sanitation services in the State of São Paulo, SABESP may perform these activities in other states and countries, and can operate in drainage, urban cleaning, solid waste handling and energy markets. The company intends to expand it basic operations and, at the same time, become an environmental solutions company.
The company operates water and sewage services in 366 of 645 municipalities of the State of São Paulo, mostly based on 30-year concession agreements. Of the 174 municipalities whose concessions expired, 124 approved a municipal law that authorizes the signature of a program contract with SABESP . One hundred and six of these municipalities have already signed the program contracts and the remainder is in the final stage for formalizing the procedure.
In the municipality of Santos, in the Santista lowland, which has a significant population, the Company operates supported by a public authorization deed, a similar situation in other municipalities in that region and in Ribeira valley, where the Company started to operate after the merger of the companies that formed it.
Between 2008 and 2037, 159 concessions will expire in addition to other 35 with legal relationships with indefinite term for which Law 11,445, which regulated the sanitation services in Brazil, determines that the parties can sign an agreement by 2010. Management believes that all these legal situations will result in new contracts or extensions, and does not consider the risk related to the discontinuity in the provision of municipal water and sewage services. As of December 31, 2007, the book value of property, plant and equipment of the concessions in final stage of formalization or terminating in 2008 total R$2.02 billion and revenues from these concessions for the year ended December 31, 2007 totals R$935 million.
On January 5, 2007, Law 11,445 was enacted, establishing the basic sanitation regulatory framework, providing for the nationwide guidelines and basic principles for the provision of such services, such as social control, transparency, the integration authority of sanitation infrastructures, water resources management, an the articulation between industry policies and public policies for urban and regional development, housing, suppression of poverty, promotion of health and environmental protection, and other related issues. The regulatory framework also aims at efficiently improving quality of living and economic sustainability, allowing for the adoption of gradual and progressive solutions consistent with users payment ability.
As benefits for the Company, this law:
The Companys shares have been listed in the Novo Mercado (New Market) segment of the BOVESPA (São Paulo Stock Exchange) since April 2002, and in the New York Stock Exchange (NYSE) as ADRs since May 2002.
The information on concession area, number of municipalities, water and sewage volumes, and other related data disclosed in this report that are not derived from the financial statements is not audited by the independent auditors.
44
2. PRESENTATION OF FINANCIAL STATEMENTS
Preparation criteria
The financial statements have been prepared and are presented in conformity with Brazilian accounting practices and standards established by the Brazilian Securities Commission (CVM).
3. SIGNIFICANT ACCOUNTING PRACTICES
The Companys accounting practices are based on the accrual basis of accounting and are in conformity with the Brazilian Corporate Law, as follows:
(a) Revenue from sales and services
Revenue from water supply and sewage collection are recognized as the water is consumed and services are provided. Revenues from unbilled water supply and sewage services are recorded as trade accounts receivable based on monthly estimates, so as to match revenues and expenses in the proper period.
(b) Publicity and advertising expenses
Publicity and advertising expenses are substantially recorded in administrative expenses. Expenses amounting to R$16,431 and R$11,895 were incurred in the years ended December 31, 2007 and 2006, respectively. There were not deferred publicity and advertising expenses in December 31, 2007 and 2006.
(c) Financial income and expenses
Represented mainly by interest, monetary and exchange variations on loans and financing, contingencies, accounts receivable and temporary cash investments, calculated and recorded on the accrual basis of accounting.
(d) Income and social contribution taxes
Income and social contribution taxes are calculated based on taxable income.
The rates used are 15%, plus a 10% surtax for income tax and 9% for social contribution tax and the taxes are accounted for on the accrual basis.
Deferred income and social contribution taxes are calculated based on taxable amounts or amounts deductible in future periods and are recorded as their realization is probable.
Pursuant to a CVM resolution, the Company decided to not recognize deferred income and social contribution taxes on the revaluation reserve of property, plant and equipment recorded through 1991.
(e) Other income and expenses
Other revenues and expenses are recognized on the accrual basis.
(f) Cash and cash equivalents
Cash and cash equivalents co mprise mainly bank deposits and temporary cash investments and are presented at cost, plus accrued earnings when applicable, which does not exceed fair value. Temporary cash investments expressed in reais are highly liquid and mainly represented by Bank Certificates of Deposit (CDB) in 2007 and 2006.
(g) Customer accounts receivable and allowance for doubtful accounts
Trade accounts receivable, except for agreements on refinanced amounts, do not take into consideration financial charges, monetary adjustment or fines.
The allowance for doubtful accounts is recorded in an amount considered sufficient by Management to cover probable losses on the realization of receivables. The allowance is recorded for accounts that exceed R$5 and that are past due for more than 360 days, and also for accounts that exceed R$30 and that are past due for more than 360 days and which are in the process of judicial collection. The amount thus determined is adjusted when it is excessive or insufficient, based on the analyses of the history of receipts, taking into consideration the expectation of recovery in the different categories of customers. Amounts up to R$5 and past due for more than 180 days are written off against income.
The Company does not record an allowance for doubtful accounts for any amount receivable from the State Government or entities that are controlled by the State Government because it does not expect to incur in any losses on such receivables.
45
(h) Inventories
Inventories of supplies for consumption and maintenance of the water and sewage systems are stated at the lower of average cost of acquisition or realizable value, and are classified in current assets. Inventories for investments are classified in property, plant and equipment and recorded at average cost of acquisition.
(i) Other current and noncurrent assets
Stated at cost or realizable values, including, when applicable, income earned.
(j) Property, plant and equipment
Stated at cost, monetarily adjusted through December 31, 1995, combined with the following: Depreciation is calculated under the straight-line method, at the annual rates mentioned in note 8.
The revaluation of property, plant and equipment items, carried out in two stages in 1990 and 1991, was based on an appraisal report issued by independent appraisers and is recorded as a contra -entry to the Revaluation Reserve in Shareholders Equity, realized through depreciation, sale, and disposal of the respective assets, as a credit to Retained earnings.
Financial charges on loans and financing for construction in progress are allocated to the costs of the assets.
The Company reviews the realization of long-term assets, mainly water and sewage structures and systems to be used in the business, for purposes of calculating and determining the degree of impairment, on a recurring basis, or when current situations or changes indicate that the book value of an asset or group of assets may not be recovered. Impairment is valued based on projected depreciation charges to be recovered through income from operations.
Donations of property, plant and equipment received from third parties and government entities to enable the Company to provide water supply and sewage services are recorded in property, plant and equipment as a contra entry to capital reserve.
The construction in progress projects are recorded at cost and are mainly related to construction projects contracted with third parties.
Improvements made in the existing assets are capitalized and the expenses on maintenance and repairs are recorded in income and expensed when incurred. Materials allocated to specific projects are added to construction in progress.
(k) Intangible assets
Starting 1999, the acquisition of concession rights from third parties has been accounted for at the amount determined in economic and business valuation reports. These rights are recorded as intangible assets in permanent assets and are amortized under the straight-line method over the period provided for in the agreements.
(l) Deferred charges
Deferred charges comprise costs for projects and technical studies, and are amortized under the straight-line method over five years from starting on the date benefits begin to be generated.
(m) Loans and financing
Restated based on monetary and exchange variations, plus the provisions for the respective financial charges incurred to the balance sheet date.
Foreign currency-denominated loans and financing are translated into reais at the balance sheet dates. Adjustments arising from exchange variation are recognized when incurred under the caption Exchange variations, net.
(n) Accrued payroll and related charges
Salaries, including accrual for vacation and 13th salary and additional payments negotiated in collective labor agreements plus related charges are recorded on the accrual basis.
(o) Profit sharing
46
The reserve for profit sharing is recorded on the accrual basis as operating expenses.
(p) Provision for contingencies
Recorded to cover losses on civil, tax, labor, and environmental lawsuits at administrative and judicial levels, which are considered by the Companys legal counsel to be probable and estimable as of December 31, 2007 and 2006. The reserves for contingencies are shown net of related escrow deposits.
(q) Environmental costs
Costs related to ongoing environmental programs are expensed as incurred. Ongoing programs are designed to minimize the environmental impact of the operations and to manage the environmental risks inherent to the Companys activities.
(r) Accrued pension obligation
The Company sponsors a private defined benefit pension plan. CVM Resolution No. 371 of December 13, 2000, requires the recognition of actuarial liabilities in excess of plan assets.
(s) Interest on shareholders equity
This interest has been recorded in accordance with Law No. 9,249/95 for tax deductibility purposes, limited to the daily pro rata variation of the Long-term Interest Rate (TJLP), and recorded in Shareholders Equity.
(t) Use of estimates
The preparation of financial statements requires Management to make estimates and assumptions that affect the reported amounts of assets and liabilities and revenues and expenses with electric energy and provision of services. Actual results could differ from those estimates.
(u) Earnings per share
Calculated based on the number of shares outstanding at the balance sheet dates.
(v) Approval of the Financial Statements
The Financial Statements were approved by the Board of Directors on March 27, 2008. There were no events subsequent to the balance sheet date that should be recorded.
4. CASH AND CASH EQUIVALENTS
2007 | 2006 | |||
Cash and banks | 72,833 | 80,118 | ||
Temporary cash investments | 392,164 | 248,088 | ||
464,997 | 328,206 | |||
5. CUSTOMER ACCOUNTS RECEIVABLE
(a) Balance sheet amounts
2007 | 2006 | |||
Private sector: | ||||
General and special customers (i) (ii) | 704,626 | 667,143 | ||
Agreements (iii) | 202,037 | 179,353 | ||
906,663 | 846,496 | |||
Government entities: | ||||
Municipal | 524,519 | 446,495 | ||
Federal | 25,792 | 23,524 | ||
Agreements (iii) | 81,490 | 85,909 | ||
631,801 | 555,928 | |||
Wholesales customer Municipal Administration Offices: (iv) | ||||
Guarulhos | 383,911 | 340,534 | ||
Mauá | 135,272 | 115,189 | ||
Mogi das Cruzes | 12,549 | 4,139 | ||
Santo André | 326,549 | 289,592 | ||
São Caetano do Sul | 2,971 | 2,932 |
47
Diadema | 99,932 | 85,620 | ||
Total whole sales Municipal Administration Offices | 961,184 | 838,006 | ||
Unbilled supply | 301,695 | 290,578 | ||
Subtotal | 2,801,343 | 2,531,008 | ||
Allowance for doubtful accounts | (1,314,671) | (1,123,157) | ||
Total | 1,486,672 | 1,407,851 | ||
Current | 1,207,885 | 1,111,289 | ||
Noncurrent (v) | 278,787 | 296,562 |
(i) General customers - residential and small and medium-sized companies.
(ii) Special customers - large consumers, commercial, industries, condominiums and special billing consumers (industrial waste, wells, etc.).
(iii) Agreements installment payments of past-due receivables, plus monetary adjustment and interest falling due between 6 and 12 months, except for agreements with municipal administration offices, which fall due through 2011.
(iv) Wholesale customers municipal administration offices This balance refers to the sale of treated water to municipalities, which are responsible for distributing to, billing and charging final consumers. Some of these municipalities are questioning in court the tariffs charged by SABESP and do not pay for the amounts in dispute. The amounts past due are classified in long-term assets pursuant to the changes below:
2007 | 2006 | |||
Balance at beginning of year | 838,006 | 727,892 | ||
Billing for services provided | 292,041 | 265,298 | ||
Collections services in the current year | (141,451) | (133,926) | ||
Collections services in previous years | (27,412) | (21,258) | ||
Balance at end of year | 961,184 | 838,006 | ||
Current | 50,769 | 16,170 | ||
Noncurrent | 910,415 | 821,836 |
(v) The noncurrent portion consists of trade accounts receivable that are past due and renegotiated with customers and amounts past due related to bulk sales to municipal administration offices and is recorded in the allowance for doubtful accounts.
(b) Customer accounts receivable aging summary:
2007 | 2006 | |||
Current | 783,946 | 705,863 | ||
Past -due: | ||||
Up to 30 days | 148,498 | 247,970 | ||
From 31 to 60 days | 81,244 | 72,064 | ||
From 61 to 90 days | 55,821 | 48,962 | ||
From 91 to 120 days | 46,202 | 40,540 | ||
From 121 to 180 days | 81,313 | 71,101 | ||
From 181 to 360 days | 151,993 | 186,387 | ||
Over 360 days | 1,452,326 | 1,158,121 | ||
Total | 2,801,343 | 2,531,008 | ||
(c) Allowance for doubtful accounts
(i) Changes in the allowance during the year were as follows:
2007 | 2006 | |||
Beginning balance | 1,123,157 | 920,736 | ||
Private sector / government entities | 86,213 | 87,160 | ||
Bulk sales | 105,301 | 115,261 | ||
48
Additions for the fiscal year | 191,514 | 202,421 | ||
Ending balance | 1,314,671 | 1,123,157 | ||
Current | 587,713 | 501,500 | ||
Noncurrent | 726,958 | 621,657 |
(ii) In the income
The Company recorded probable losses on accounts receivable in 2007 in the amount of R$323,339, R$131,825 of which (net of recoveries), were written off from accounts receivable (in 2006 R$115,739), under Selling expenses. In 2006, these losses amounted to R$411,918.
6. TRANSACTIONS WITH RELATED PARTIES
The Company is a party to transactions with its controlling shareholder, the State Government, and companies related to it.
(a) Accounts receivable, interest on shareholders equity and operating revenue with the São Paulo State Government (Gesp)
2007 | 2006 | |||
Current assets: | ||||
Water and sewage services (i) | 311,528 | 308,030 | ||
Gesp Agreement (iii) (iv) | 26,978 | 59,834 | ||
Total current assets | 338,506 | 367,864 | ||
Long -term assets: | ||||
Water and sewage services Gesp Agreement (iii) (iv) | 107,911 | 89,012 | ||
Reimbursement of additional retirement and pension benefits paid (ii) | 879,077 | 774,455 | ||
Gross long -term amount receivable from shareholder | 986,988 | 863,467 | ||
Total receivable from shareholder | 1,325,494 | 1,231,331 | ||
Provision of water and sewage services | 446,417 | 456,876 | ||
Reimbursement of additional retirement and pension benefits | 879,077 | 774,455 | ||
1,325,494 | 1,231,331 | |||
Interest on shareholders equity payable | 551,974 | 396,361 | ||
Operating revenue | 2007 | 2006 | ||
Gross revenue from sales and services | ||||
Water sales | 185,976 | 175,124 | ||
Sewage services | 149,853 | 146,074 | ||
Collections | (326,065) | (199,375) | ||
Financial income | 51,469 | 50,882 |
(i) Water and sewage services
The Company provides water supply and sewage collection services to the State Government and other companies related to it in accordance with usual market terms and conditions, except for the settlement of receivables, which may be realized in the conditions mentioned in items (iii) and (iv).
(ii) Reimbursement of additional retirement and pension benefits
Refer to amounts that supplement retirement and pension benefits paid by the Company to former employees from state -owned companies that merged to form the Company and to employees contracted in 1973 and 1974. The amounts involved have to be reimbursed to the Company by the State Government in its capacity of main debtor pursuant to State Law No. 200/74. As of December 31, 2007 and 2006, 2,635 and 2,670 retired employees, respectively, received additional retirement benefits and for the years ended December 31, 2007 and 2006, the Company paid R$104,622 and R$101,740, respectively. There were 144 active employees as of December 31, 2007 who will be entitled to these benefits as a result to their retirement in comparison to 163 as of December 31, 2006.
49
On January 2004, the payments that supplement retirement and pension benefits were transferred to the Finance Department and would be made in accordance with the calculation criteria determined by the State Attorneys Office (PGE). As a result of a legal decision, the responsibility for the payments is of SABESP again, as they were initially.
(iii) Gesp Agreement
Entered into on December 11, 2001 between the Company, the São Paulo State Government (through the State Finance Business Department) and the Water and Electric Energy Department (Daee), with the intermediation of the Sanitation and Energy Department (former Water Resources, Sanitation and Construction Works Department), in which the State acknowledges that, under Law No. 200/74 it is accountable for the benefits arising from additional retirement and pension benefits and recognizes the existence of debs arising from bills related to the provision of water supply and sewage services. Total agreement amounted to R$678,830, at historical value, R$320,623 of which refers to additional retirement and pension benefits in the period between March 1986 and November 2001, and R$358,207 arising from the provision of water supply and sewage collection services, billed in and past due since 1985 until December 1, 2001.
In view of the strategic importance of the Taiaçupeba, Jundiaí, Biritiba, Paraitinga and Ponte Nova reservoirs for guaranteeing and maintaining the Upper Tietê water volume , the Water and Electric Energy Department (Daee) intends to transfer these assets to the Company as partial amortization, by assigning a receivable in the amount owed by the State. The appraisal of the reservoirs was approved by the Companys Board of Directors and indicates the amount of R$300,880 (base date June 2002), as mentioned in the related report. However, there is a civil class action at the São Paulo State Appeals Court involving the transfer of these reservoirs. The Companys legal counsel evaluate the risk of loss from this lawsuit as probable, which would hinder the transfer of the related reservoirs as a partial amortization of the balance receivable.
Based on Official Letter No. 53/2005, of the Council for the Protection of the States Equity (Codec) of March 21, 2005, the negotiations between the Company and the State Government were resumed aiming at the financial balance of the debt related to the additional retirement and pension benefits under the Gesp Agreement, including the amounts past due after November 2001. The Company contracted Fipecafi to determine the amounts effectively reimbursable by the State Government, taking into consideration the legal guidance of the State Attorney General.
On march 26, 2008, a Commitment Agreement between the São Paulo State Government (GESP) and SABESP was signed (note 27(I)).
The balances of water supply and sewage collection services were included in the First amendment as described below (iv).
(iv) First Amendment to the Gesp Agreement
On March 22, 2004, the Company and the State Government amended the terms of the original Gesp Agreement, (1) consolidating and recognizing the amounts due by the State Government for water supply and sewage collection services provided, monetarily adjusted until February 2004; (2) formally authorizing the offset of amounts due by the State Government with interest on capital declared by the Company and any other debit existing with the State Government as of December 31, 2003, monetarily adjusted until February 2004; and (3) defining the payment conditions of the remaining liabilities of the State Government for the receipt of the water supply and sewage collection services.
Pursuant to the Amendment, the State Government recognized the amounts due to the Company for services water supply and sewage collection services provided until February 2004 in the amount of R$581,779, including monetary restatement based on the TR (a managed prime rate ) at the end of each year until February 2004. The Company recognized amounts payable to the State Government related to interest on capital in the amount of R$518,732, including (1) amounts declared and paid related to years prior to 2003 (R$126,967), (2) monetary adjustment of these amounts based on the annual variation of the Consumer Price Index (IPC/Fipe) until February 2004 (R$31,098); and (3) amounts declared and due related to 2003 (R$360,667).
The Company and the State Government agreed on the mutual offset of R$404,889 (monetarily adjusted until February 2004). The remaining liability, of R$176,890, of February 29, 2004, with payment in monthly installments between May 2005 and April 2009, monetarily restated by the Extended Consumer Price Index (IPCA/IBGE), plus interest of 0.5% .
50
In 2005, the amount of R$105,520 was offset against interest on capital of 2003, as expected. In 2006, the Company received the amount of RR$47,228 related to the installments from January to October 2007.
The Amendment to the Gesp Agreeme nt does not provide for amounts due by the State Government related to the additional retirement and pension plan benefits paid on behalf of the State Government by the Company, which are still subject to the terms of the original Gesp Agreement.
Management believes that all amounts due by the State Government are receivable and does not expect to incur in losses on such accounts receivable.
(v) Second Amendment to the Gesp Agreement
On December 28, 2007, the Company and the State Government, by means of the Finance Department, signed the second amendment to the terms of the original Gesp Agreement, (1) agreeing upon the payment in installments of the remaining balance of the First Amendment, amounting to R$133,709 (on November 30, 2007), to be paid in 60 monthly and consecutive installments of the same amount, the first of which falling due on January 2, 2008. The amount of the installments will be monetarily restated in accordance with the variation of the IPCA-IBGE, plus interest of 0.5% per month. The balance of this agreement, the installments of which have been monthly paid, includes the amount of R$46,244, which the State does not recognize as due. SABESPs understanding differs from that of the State regarding this amount and does admit the review of these previously agreed-upon amounts without the supported and unequivocal demonstration of the lack of relation between the amounts presented by SABESP and the services effectively provided. For this reason the Company understands that the recognition of an allowance for losses regarding these amounts is not necessary (pursuant to item VII, of the Recitals, of the Second Amendment to the Recognition Instrument, Payment Commitment and Other Covenants between the State of São Paulo and SABESP ) (2) with respect to the accounts past due and unpaid in the period between March 2004 and October 2007, arising from the provision of water supply and sewage collection services in the amount of R$256,608, R$231,407 was received and R$25,201, is pending confirmation of receipt. These amounts are being jointly analyzed by SABESP and the representatives of the many State departments. To date, differences regarding the debtor but not the amount of the debt have been identified. In the event of the reclassification of the entity responsible for paying the account, SABESP will transfer the charge to the respective Entity. The Company did not recognize an allowance for losses in this amount as it understands that the differences are substantially related to the identification of the debtor. (3) The interest on capital due by SABESP to the State, related to the period between March 2004 and December 2006, in the amount of R$400,823, restated between June 2007 and November 2007, based on the Selic (central Bank overnight rate), was paid in the period between January and March 2008. (4) The State and SABESP agreed on immediately resuming the compliance with their mutual obligations under new assumptions: (a) implementation of an electronic account management system to facilitate and speed up the monitoring of payment processes and budget management procedures; (b) structuring of the Rational Water Use Program (PURA) to rationalize the consumption of water and the amount of the water and sewage bills under the responsibility of the State; (c) establishment, by the State, of criteria for budgeting so as to avoid the reallocation of amounts to a specific water and sewage accounts as from 2008; (d) possibility of registering state bodies and entities in a delinquency system or reference file; (e) possibility of interrupting water supply to state bodies and entities in the case of nonpayment of water and sewage bills.
Approximately 70% of the billing from November 2007 and February 2008 has already been paid by the State Government.
(b) Cash and cash equivalents
The Companys cash and temporary cash investments with financial institutions controlled by the State Government amounted to R$421,630 and R$287,999 as of December 31, 2007 and 2006, respectively. The financial income arising from these temporary cash investments totaled R$51,469 and R$50,882 in the years ended December 31, 2007 and 2006, respectively. The Company must, pursuant to a State Decree, invest its surplus resources with financial institutions controlled by the State Government.
(c) Agreements for the use of reservoirs
In its operations, the Company uses the Guarapiranga and Billings reservoirs and part of some reservoirs of the Upper Alto, which are owned by the Water and Electric Energy Department (Daee); should these reservoirs not be available for use to the Company, there could be the need to collect water in more distant places. The Company does not pay any fee for the use of these reservoirs but it is responsible for their maintenance and operating costs.
(d) Agreements with lower tariffs with State and Municipal Government Entities that joined the Rational Water Use Program
51
The Company has signed agreements with government entities related to the State Government and municipalities where it operates involving approximately 7,240 real estates that are benefited from a reduction of 25% in the tariff of water supply and sewage collection services when they are not in default. These agreements provide for the implementation of the rational water use program, which takes into consideration the reduction in the consumption of water.
(e) Guarantees
The State Government grants guarantees for some loans and financing of the Company and does not charge any fee with respect to such guarantees.
Management is making efforts to maintain the States payments with respect to transactions with related parties in non-default on a permanent basis.
7. INDEMNITIES RECEIVABLE
Indemnities receivable are a noncurrent asset that represents amounts receivable from the Municipalities of Diadema and Mauá as an indemnity for their unilateral termination of the concessions for water supply and sewage collection services of the Company in 1995. As of December 31, 2007, this asset amounted to R$148,794.
Due to these concession agreements, the Company invested in the construction of water and sewage systems in those municipalities in order to meet its concession service commitments. For the unilateral termination of the Diadema and Mauá concessions, the municipalities assumed the responsibility of supplying water and sewage services in those regions. At that time, the Company reclassified the balances of property, plant and equipment related to the assets used in those municipalities to noncurrent assets (indemnities receivable) and recorded non-indemnifiable costs to reflect the assets by their estimated recoverable amounts, contractually agreed as indemnity by the Company with the proper authorities. The net book value of property, plant, and equipment relating to the Municipality of Diadema, written off in December 1996, amounted to R$75,231, and the indemnity balance and other receivables from the municipality amounted to R$62,876 as of December 31, 2007 and 2006. The net book value of property, plant and equipment relating to the Municipality of Mauá, written off in 1999 fiscal year, amounted to R$103,763, and the indemnity balance totaled R$85,918 as of December 31, 2007 and 2006.
The Companys right to recover these amounts is challenged by the municipalities and no amount has been received to date.
SABESP filed lawsuits to collect the amounts due by the municipalities. With respect to Diadema, the decision of the lower court judge was unfavorable to SABESP , which filed an appeal in November 2000. On December 1, 2005, SABESPs appeal to have the agreement entered into with the municipality of Diadema declared valid was partially accepted. On October 11, 2006, the municipality administration office filed special and extraordinary appeals and on November 21, 2006 the decision that allowed the Company to present it reply to said appeals was published. SABESP presented its reply on December 6, 2006. The appeals were rejected by the Chief Jude on March 27, 2007 and the municipal administration office filed new interlocutory appeals against this decision. The interlocutory appeal filed to the Federal Supreme Court (STF) was accepted but only for the purposes of determining the sentence for the extraordinary appeal that had been rejected. On December 26, 2007, the decision that accepted the execution of the Companhia de Saneamento the Diadema Saned was rendered, ordering this company to be summoned to pay the full amount of the debt within 15 days under the penalty of fine. Currently, the Company awaits the effect of this summons as said decision was published on January 31, 2008 and Saned filed an Interlocutory Appeal against it but, on February 28, 2008, the Reporting Judge, sustained the decision and awaits for information on the lower court decision in order to analyze the motion for suspension.
With respect to Mauá, a lower court decision demanded this Municipality to pay the amount of R$153,2 million as a compensation for loss of profits. This decision was appealed by Mauá on April 15, 2005 and is pending a new decision by the Court De cision. On July 4, 2006, the decision was converted in diligence consisting of an expert clarification on the amount of the indemnity for loss of profits. The clarification was provided on December 18, 2007 and the expert confirmed the amount of the loss of profits determined by the lower court.
Based on the opinion of its legal counsel, Management continues to state that the Company is entitled to receive the amounts related to the indemnity and continues to monitor the status of the lawsuits.
52
8. PROPERTY, PLANT AND EQUIPMENT
2007 | 2006 | |||||||
Adjusted | Accumulated | |||||||
cost | depreciation | Net | Net | |||||
In use | ||||||||
Water systems: | ||||||||
Land | 961,538 | - | 961,538 | 958,283 | ||||
Buildings | 2,817,488 | (1,565,786) | 1,251,702 | 1,363,088 | ||||
Connections | 972,635 | (386,476) | 586,159 | 500,477 | ||||
Water meters | 294,846 | (149,522) | 145,324 | 135,853 | ||||
Networks | 3,492,852 | (1,100,436) | 2,392,416 | 2,358,024 | ||||
Wells | 205,117 | (107,627) | 97,490 | 107,366 | ||||
Equipment | 514,603 | (344,899) | 169,704 | 172,213 | ||||
Other | 16,287 | (13,163) | 3,124 | 2,105 | ||||
9,275,366 | (3,667,909) | 5,607,457 | 5,597,409 | |||||
Sewage systems: | ||||||||
Land | 348,508 | - | 348,508 | 347,104 | ||||
Buildings | 1,652,146 | (648,337) | 1,003,809 | 952,431 | ||||
Connections | 944,588 | (390,863) | 553,725 | 530,679 | ||||
Networks | 5,570,794 | (1,249,521) | 4,321,273 | 3,816,746 | ||||
Equipment | 559,080 | (435,740) | 123,340 | 114,904 | ||||
Other | 4,904 | (2,791) | 2,113 | 2,083 | ||||
9,080,020 | (2,727,252) | 6,352,768 | 5,763,947 | |||||
General use: | ||||||||
Land | 107,707 | - | 107,707 | 107,707 | ||||
Buildings | 138,120 | (80,238) | 57,882 | 57,153 | ||||
Transportation equipment | 141,708 | (130,561) | 11,147 | 6,895 | ||||
Furniture, fixtures and equipment | 315,515 | (175,255) | 140,260 | 108,895 | ||||
Free lease land | 20,556 | - | 20,556 | 20,556 | ||||
Free lease assets | 8,457 | (2,534) | 5,923 | 5,923 | ||||
732,063 | (388,588) | 343,475 | 307,129 | |||||
Subtotal in use | 19,087,449 | (6,783,749) | 12,303,700 | 11,668,485 | ||||
Construction in progress: | ||||||||
Water systems | 734,016 | - | 734,016 | 708,646 | ||||
Sewage systems | 1,018,620 | - | 1,018,620 | 1,454,445 | ||||
Other | 3,737 | - | 3,737 | 5,922 | ||||
Subtotal in progress (d) | 1,756,373 | - | 1,756,373 | 2,169,013 | ||||
Grand Total | 20,843,822 | (6,783,749) | 14,060,073 | 13,837,498 | ||||
Property, plant and equipment represent the assets involved in the provision of water supply and sewage services in 352 municipalities. Under the assets arising from contracts negotiated based on economic and financial reports and program contracts, SABESP is both the owner and the manager.
In 2007, one hundred and seventy four (174) concession agreements expired, 106 of which signed the program contracts and the remainder are in the final stage for formalizing procedures. The net book value of the property, plant and equipment used in the municipalities where the concessions are in the final stage for formalizing procedures or will expire in 2008 totaled R$2,02 billion.
In 2007, the depreciation charges of these municipalities were R$79,713.
The concession agreements provide for the assets to be returned to the concession grantor at the end of the term by means of an indemnity at the net book value or fair value in accordance with what is stipulated in each contract. In the program contracts, the indemnity will correspond to the present value of the cash flow in the remaining period on the date the services are resumed, monetarily restated, plus interest to the date of the effective payment.
(a) Depreciation
Depreciation is calculated based on the following annual rates: - buildings 4%, interceptors and networks 2%, machinery and equipment 10%, water meters 10%, vehicles 20%, computer equipment 20%, building connectors 5% and office furniture 10%.
53
(b) Disposals of property, plant, and equipment
In 2007, the Company wrote off property, plant and equipment items in the amount of R$68,568 (2006 R$54,350), which resulted in a total loss of R$68,349 (2006 - R$47,807), of which R$14,247 (2006 - R$21,348), refers to items in use, due to obsolescence, theft and sale, and R$54,103 to discontinued construction, unproductive wells and projects considered economically unfeasible, and, in 2006, R$26,459 referred to projects considered economically unfeasible.
(c) Capitalization of interest and financial charges
The Company capitalized interest and monetary adjustment, including exchange variation, in property, plant and equipment in the amount of (R$13,338) in the year ended December 31, 2007 (2006-R$ 5,784), and during this period these assets were presented as construction in progress.
(d) Construction in progress
Construction in progress refers mainly to new projects and operating improvements and is represented by:
2007 | 2006 | |||
Water systems: | ||||
Networks and connections | 178,977 | 227,360 | ||
Transmission | 22,281 | 29,626 | ||
Water treatment | 71,375 | 80,130 | ||
Sub-transmission | 225,646 | 188,342 | ||
Production and storage | 160,602 | 126,519 | ||
Other | 75,135 | 56,669 | ||
Total water systems | 734,016 | 708,646 | ||
Sewage systems: | ||||
Collection | 710,960 | 1,133,958 | ||
Treatment | 179,604 | 187,047 | ||
Other | 128,056 | 133,440 | ||
Total sewage systems | 1,018,620 | 1,454,445 | ||
Other | 3,737 | 5,922 | ||
Total | 1,756,373 | 2,169,013 | ||
The estimated disbursements related to already contracted investments total approximately R$2,050 million for the years from 2008 to 2015 (unaudited).
(e) Expropriations
As a result of the construction of priority projects related to water and sewage systems, the Company was required to expropriate or establish rights of way in third-parties properties, and the owners of these properties will be compensated either amicably or through courts.
The amount of compensation to be paid starting in 2008 is estimated at approximately R$472 million (unaudited) which will be paid with own funds. The assets to be received as a result of these negotiations will be recorded as property, plant, and equipment after the transaction is completed. In 2007, the amount related to expropriations was R$16,813 (2006 - R$8,385).
(f) Assets offered as guarantee
As of December 31, 2007 and 2006, the Company had assets in the amount of R$249,034 offere d as guarantee to the request for the PAES (tax debt refinancing program) (note 12).
The three real estate properties of the Company in the amount of R$60,539, which were offered as guarantee for a financing from the International Bank for Reconstruction and Development (BIRD) and the settlement of which took place in April 2007, are awaiting release by the Federal Government.
(g) Nonoperating assets
The Company had, as of December 31, 2007 and 2006, free lease assets in the amount of R$26,479 mainly related to land located near operating areas.
(h) Revaluation
Property, plant and equipment items were revalued in 1990 and 1991 and are depreciated at annual rates that correspond to their remaining useful lives determined in the related reports, which, as general rule, fall into the periods of the rates presented above.
54
As allowed by CVM Instruction No. 197/93, the Company failed to recognize a provision for the deferred tax effect on the appreciation arising from the revaluation of property, plant and equipment in 1990 and 1991. Should income and social contribution taxes be recognized on the revaluation reserve, the unrealized amount as of December 31, 2007 would total R$400,606 (2006 R$430,375). The amounts of R$87,670 and R$102,272 of the re valuation reserves were realized in the years ended December 31, 2007 and 2006, respectively.
(i) Totally depreciated assets
As of December 31, 2007, the book value of the fully depreciated assets that are still in use is R$606,142 (2006 R$426,659).
9. INTANGIBLE ASSETS
In the period between 1999 and 2006, the negotiations for new concessions were conducted on the basis of the economic and financial results of the transaction, determined in an appraisal report issued by independent experts.
The amount determined in the respective contract, after the transaction is closed with the municipal authorities, with payment through Company shares or in cash, is recorded in this account and amortized over the period of the related concession (usually 30 years). As of December 31, 2007 and 2006 there were no amounts pending related to these payments to the municipalities.
The net amount shown relates to concessions with the following municipalities:
Historical | Accumulated | |||||||
cost | amortization | Net | Net | |||||
2007 | 2006 | |||||||
Agudos | 7,773 | (2,167) | 5,606 | 5,651 | ||||
Bom Sucesso do Itararé | 350 | (37) | 313 | 317 | ||||
Campo Limpo Paulista | 15,269 | (3,224) | 12,045 | 9,038 | ||||
Conchas | 3,541 | (590) | 2,951 | 1,768 | ||||
Duartina | 1,589 | (343) | 1,246 | 1,178 | ||||
Estância de Serra Negra | 15,124 | (1,921) | 13,203 | 11,853 | ||||
Itapira | 16,123 | (1,330) | 14,793 | 13,399 | ||||
Itararé | 5,784 | (1,617) | 4,167 | 4,136 | ||||
Marabá Paulista | 1,603 | (107) | 1,496 | 364 | ||||
Miguelópolis | 4,431 | (1,230) | 3,201 | 3,003 | ||||
Osasco | 288,025 | (69,165) | 218,860 | 209,255 | ||||
Paraguaçu Paulista | 14,418 | (4,185) | 10,233 | 10,460 | ||||
Paulistânia | 154 | (34) | 120 | 122 | ||||
Sandovalina | 2,384 | (101) | 2,283 | 166 | ||||
Santa Maria da Serra | 1,147 | (265) | 882 | 867 | ||||
São Bernardo do Campo | 237,463 | (31,026) | 206,437 | 214,389 | ||||
Várzea Paulista | 13,250 | (3,297) | 9,953 | 9,152 | ||||
Total | 628,428 | (120,639) | 507,789 | 495,118 | ||||
55
10 - LOANS AND FINANCING
2007 | 2006 | |||||||||||||||||||
Annual interest | Monetary | |||||||||||||||||||
Current | Noncurrent | Total | Current | Noncurrent | Total | Guarantees | Final maturity | rate | restatement | |||||||||||
In local currency: | ||||||||||||||||||||
Government of | ||||||||||||||||||||
the State of São | ||||||||||||||||||||
Paulo and Own | ||||||||||||||||||||
Banco do Brasil | 238,194 | 1,642,644 | 1,880,838 | 215,723 | 1,854,042 | 2,069,765 | Funds | 2014 | 8.50% | UPR | ||||||||||
Debentures 5th Issue | - | - | - | 46,038 | - | 46,038 | No guarantees | 2007 | 10.65% | IGP-M | ||||||||||
Debentures 6th Issue | - | 427,657 | 427,657 | 231,813 | 397,165 | 628,978 | No guarantees | 2010 | 11% | IGP-M | ||||||||||
Debentures 7th Issue | - | 312,362 | 312,362 | - | 304,350 | 304,350 | No guarantees | 2010 | CDI+1.5% and 10.8% | IGP-M | ||||||||||
Debentures 8th Issue | - | 737,438 | 737,438 | - | 709,815 | 709,815 | No guarantees | 2011 | CDI+1.5% and 10.75% | IGP-M | ||||||||||
Caixa Econômica Federal | 58,267 | 490,904 | 549,171 | 49,648 | 477,628 | 527,276 | Own Funds | 2008/2022 | 5% to 9.5% | UPR | ||||||||||
FIDC SABESP I | 55,555 | 125,000 | 180,555 | 55,555 | 180,556 | 236,111 | Own Funds | 2011 | CDI + 0.70% | |||||||||||
National Bank for Economic and Social Development (BNDES) |
41,904 | 165,689 | 207,593 | 31,515 | 154,043 | 185,558 | Own Funds | 2013 | 3% + TJLP 6% LIMIT | |||||||||||
Other | 3,146 | 18,753 | 21,899 | 2,791 | 23,136 | 25,927 | 2009/2011 | 12% / CDI /TJLP + 6% | UPR | |||||||||||
Accrued Interest and financial charges | 93,398 | 32,036 | 125,434 | 99,252 | 20,891 | 120,143 | ||||||||||||||
490,464 | 3,952,483 | 4,442,947 | 732,335 | 4,121,626 | 4,853,961 | |||||||||||||||
In foreign currency: | ||||||||||||||||||||
Eurobonds US$238,052,000 (2006US$238,052,000) |
173,680 | 247,982 | 421,662 | - | 508,955 | 508,955 | No guarantees | 2008/2016 | 12% and 7.5% | US$ | ||||||||||
Interamerican Development Bank (IDB): US$432,099,000 (2006 US$435,867,000) |
64,764 | 700,613 | 765,377 | 99,930 | 831,952 | 931,882 | Federal Government |
2016/2025 | 3.00% to 5.61% | Currency Basket Variation + US$ |
||||||||||
International Bank for Reconstruction and Development (BIRD) (2006-US$2,223,000) |
- | - | - | 4,752 | - | 4,752 | Federal Government |
2007 | 5.15% | Currency Basket Variation + US$ | ||||||||||
JBIC Yen 2,654,422 (2006 Yen 652,814) | - | 42,043 | 42,043 | - | 11,721 | 11,721 | Federal Government |
2029 | 1.8% and 2.5% | Japanese Yen | ||||||||||
Interest and financial charges | 13,206 | - | 13,206 | 15,458 | - | 15,458 | ||||||||||||||
251,650 | 990,638 | 1,242,288 | 120,140 | 1,352,628 | 1,472,768 | |||||||||||||||
Total loans and financing | 742,114 | 4,943,121 | 5,685,235 | 852,475 | 5,474,254 | 6,326,729 | ||||||||||||||
Exchange rate as of December 31, 2007: US$1.7713; Yen 0.015839 (2006 US$2.1380; Yen 0.017954 )
As of December 31, 2007, the Company did not have balances of loans and financing raised in the short-term.
56
(a) Banco do Brasil
In March 1994, existing loan agreements with Caixa Econômica Federal were refinanced and the loan rights were transferred by that financial institution to the Federal Government, with Banco do Brasil acting as an agent. Under the terms of the agreement signed with the Federal Government, payments are made based on the Price amortization system, monthly indexed by the Standard Reference Unit (UPR), which is equal to the Governments benchmark interest rate (TR), plus interest of 8.5% per year. The interest and principal amount are monthly paid with final maturity in 2014. This financing is guaranteed by the São Paulo State Government by a pledge of its own revenues and revenues of the Company.
(b) Debentures
(i) 5th Issue
On April 1, 2002, the 5th issue of registered, non-convertible debentures, without preference or guarantee, was made with a face value of R$10 each. The face value of the 2nd series is changed monthly in view of its features, in accordance with the respective indenture.
The Company issued 40,000 debentures in two series, as follows:
1st series | 2nd series | |
Placement date | 05/16/2002 | 05/16/2002 |
Number Face value - Issue | 31,372 R$313,720 | 8,628 R$86,280 |
Payment form of | CDI + 1.85% p.a. | IGP -M + 13.25% p.a. |
Return | Quarterly, except for the last | Annual, except for the last |
Repayment | installment on March 1, 2007 | installment on March 1, 2007 |
3 installments on April 1, 2005, | 3 installments on April 1, 2005, | |
April 1, 2006 and March 1, 2007 | April 1, 2006 and March 1, 2007 |
In April 2005, returns on both series were last renegotiated and the rate for the 1st series was changed from CDI + 2% p.a. to CDI + 1.1% p.a. and for the 2nd series from IGP-M + 12.7% p.a. to IGP-M + 10.65% p.a., effective through the end of the contracts.
On April 19, 2006, the Company early settled the 5th issue of debentures, 1st series, the settlement of which was expected for March 2007 through the use of a portion of the funds raised with SABESP I FIDC (Receivables Investment Fund), in the amount of R$106,373.
Interest expenses totaled R$837 and R$6,089 in 2007 and 2006, respectively, related to the second series. On March 1, 2007, the 2nd series of this issue was settled.
(ii) 6th Issue
On September 17, 2004, the Company registered with CVM a securities program in the total amount of R$1,500,000. As part of this program, the Company issued on September 1, 2004, 600,000 debentures in three series, without renegotiation, with a face value of R$1 each, totaling R$600,000. The date for the financial settlement of the operation was September 21, 2004 for the 1st series and September 22, 2004 for the 2nd and 3rd series.
The debentures were placed on the market as follows:
Payment of | ||||||||||||
Number | Adjustment | Interest | interest | Repayment | Maturity | |||||||
1st Series | 231,813 | - | CDI+1.75% p.a. | Semiannual | Single payment | September 2007 | ||||||
2nd Series | 188,267 | IGP-M | 11% p.a. | Annual | Single payment | September 2009 | ||||||
3rd Series | 179,920 | IGP-M | 11% p.a. | Annual | Single payment | September 2010 |
57
Interest expenses totaled R$21,708 and R$38,054 in 2007 and 2006, respectively, related to the 1st series, R$23,290 and R$21,932, respectively, related to the 2nd series, and R$22,258 and R$20,960,
respectively, related to the 3rd series. The remaining balances to be paid, amounting to R$7,366 (2006 R$6,841) for the 2nd series and R$7,040 (2006 R$6,538) for the 3rd series, are
recorded in the caption Loans and Financing in current liabilities.
On September 3, 2007, the 1st series of the 6 th issue of debentures was fully paid for.
(iii) 7th Issue
Pursuant to the program recorded with CVM on September 17, 2004, the Company issued on March 1, 2005, 300,000 debentures in two series, without renegotiation, with a face value of R$1, totaling R$300,000. The date for the financial settlement of the operation was March 14, 2005.
The debentures were placed on the market as follows:
Payment of | ||||||||||||
Number | Adjustment | Interest | interest | Repayment | Maturity | |||||||
1st Series | 200,000 | - | CDI+1.5% p.a. | Semiannual | Single payment | March 2009 | ||||||
2nd Series | 100,000 | IGP-M | 10.80% p.a. | Annual | Single payment | March 2010 |
Interest expenses totaled R$26,159 and R$32,305 in 2007 and 2006, respectively, related to the 1st series, and R$11,974 and R$11,162, respectively, related to the 2nd series. The remaining balances to be paid, amounting to R$7,788 (2006 R$9,304) for the 1st series and R$9,975 (2006 R$9,218) for the 2nd series, are recorded in the caption Loans and Financing in current liabilities.
(iv) 8th Issue
To terminate the program registered with CVM on September 17, 2004, the Company issued on June 1, 2005, 700,000 debentures, using the option to increase the number of debentures allowed by up to 20%, pursuant to the provision of paragraph 2 of Article 14 of CVM Instruction No. 400/03, in two series, without renegotiation, with the face value of R$1 each, totaling R$700,000. The date for the financial settlement of the operation was June 24, 2005. The amount raised was used to settle the Eurobonds contract (note 10(f(i))).
The debentures were placed o n the market as follows:
Payment of | ||||||||||||
Number | Adjustment | Interest | interest | Repayment | Maturity | |||||||
1st Series | 350,000 | - | CDI+1.5% p.a. | Semiannual | Single payment | June 2009 | ||||||
2nd Series | 350,000 | IGP-M | 10.75% p.a. | Annual | Single payment | June 2011 |
Interest expenses totaled R$45,744 and R$56,385 in 2007 and 2006, respectively, related to the 1st series, and R$40,496 and R$37,953, respectively, related to the 2nd series. The remaining balances to be paid, amounting to R$3,187 (2006 R$3,668) for the 1st series and R$23,444 (2006 R$21,773) for the 2 nd series, are recorded in the caption Loans and Financing in current liabilities.
Covenants of the 6th, 7th and 8th issue of debentures:
(c) Caixa Econômica Federal
Post-sanitation Progra m
(i) Water and sewage
58
Several loan agreements were signed between 1996 and 2004 under the Pro -Sanitation Program with a view to expanding and improving the water supply and sewage systems of several municipalities of the State of São Paulo and of the City of
São Paulo. The loans are collateralized by the collections of the daily billings of water supply and sewage services up to the total amount of the debt.
Contractually established repayment terms range from 120 to 180 months, starting at the beginnin g of the related collections.
The balance as of December 31, 2007 is R$527,669 (2006 - R$506,221), and the unused amount of these loans is R$396,221.
The contractual charges are:
Contract signed in: | 1996 | 1997 | 1998 to 2004 | |||
Interest rate | 9.5% p.a. | 6.5% to 8.0% p.a. | 6.5% to 8.0% p.a. | |||
During the grace period: | ||||||
Risk rate | 1.0% p.a. on the amount disbursed |
1.0% p.a. on the amount disbursed |
0.6% p.a. or 2% p.a. on the outstanding balance | |||
Management fee | 0.12% p.m. on the contract amount |
2.0% p.a. on the amount disbursed |
1.0% p.a. on the amount disbursed or 2% p.a. on the
amount disbursed fro the contracts signed between 2003 and 2004 |
|||
In the return phase: | ||||||
Management fee | Difference between the calculation of the
installment and the rate of 10.5% p.a. less the rate of 9.5% p.a. |
1.0% on the debt balance |
1.0% on the debt balance |
(ii) Pro-Sanitation Program Pró-Sanear
In 1997 and 1998, contracts were signed under the Pró-Sanear Program for the improvement of water and sewage services, with the participation of the communities receiving the services, in several municipalities of the Metropolitan Region of São Paulo. The loans are collateralized by the collections of the daily billings of water supply and sewage services up to the total amount of the debt. Repayments will be made in 180 months after the beginning of collections. As of December 31, 2007, the balance is R$21,502 (2006 - R$21,055), and the amount available for use from these loans, for projects already in progress, is R$8,676.
The financial charges are:
Interest rate - 5.0% p.a.
Management fee (grace period) - 2.0% p.a. on the outstanding balance
Management fee (repayment phase) - 1.0% p.a. on the outstanding balance
Risk rate (grace period) - 1.0% on the amounts disbursed
Covenants:
Through the Agreement for Performance Improvement, targets are established for financial indicators (operating margin, revenue evasion, cash and cash equivalents and reduction of the number of days accounts receivable are compromised), as well as operating indicators that, based on the past two years, are annually projected for the following five years.
(d) BNDES
Contract 01.2.619.3.1 - signed in August 2002, in the total amount of up to R$60,000, for the purpose of financing part of the Companys contribution to the Tietê River Pollution Abatement Project - Stage II, related to loan agreement 1212/OC - BR with the Interamerican Development Bank (IDB). The related project is in progress and the outstanding balance as of December 31, 2007 is R$51,896
59
(2006 R$46,389).
The onlending agreement 10/669.748 -6, in the total amount of R$180,000, is distributed among the financing agents as follows:
Agent | Amount | |
Unibanco União de Bancos Brasileiros S.A. | 60,000 | |
Banco BBA Creditanstalt S.A. | 51,000 | |
Banco Alfa de Investimento S.A. | 39,000 | |
Banco Itaú S.A. | 30,000 | |
Total | 180,000 | |
The related project is in the performance stage and the outstanding balance as of December 31, 2007 was R$155,697 (R$139,169 in 2006). The funds are passed on from BNDES to the agents and from the latter to SABESP. The onlending agreement has the same purpose as the agreement between BNDES and SABESP, and the same interest and repayment terms, as follows:
Interest - TJLP limited to 6% p.a., plus a spread of 3% p.a., paid quarterly during the grace period, and monthly in the repayment phase. The TJLP portion exceeding 6% p.a. will be added to the outstanding balance.
Contract repayment was initiated in September 2005, with monthly payments and conclusion scheduled for February 2013.
The contracts are collateralized by part of revenues from the provision of water and sewage services.
Covenants:
(e) FIDC
On March 23, 2006, a single series of senior shares and 26 subordinated shares, held in a deposit account in the name of its holders, were issued with unit value on issue date corresponding to R$500.000 (five hundred thousand) The senior shares are being repaid in 54 monthly installments, starting October 2006, and their final maturity is in March 2011. As of December 31, 2007, the balance of subordinated shares is R$16,121, recorded under the caption Other receivables in noncurrent assets; the balance of senior shares is R$180,555, recorded under the caption Loans and financing. Subordinated shares were subscribed and paid up exclusively by SABESP. The Fund yield benchmark corresponds to 100% of the DI rate (a managed prime rate), plus a fixed interest coupon of 0.70% per base year of 252 business days, pursuant to the terms of its regulations.
The Fund is managed by Caixa Econômica Federal and its custodian and recording agent is Banco do Brasil S.A.
The funds raised, in the amount of R$250 million, were used by the Company to settle debts in 2006.
(f) Eurobonds
(i) In June 2003, the Company issued Eurobonds abroad (Eurobonds 2008) in the amount of US$225,000 thousand. The issue was led by The Bank of New York and the principal agent was The Bank of Tokyo Mitsubishi Ltd. The interest rate is 12% p.a., paid semiannually, and final maturity is in June 2008. The funds were used for the final settlement of the US$200,000 thousand Eurobond matured in July 2003.
On November 6, 2006, the Company settled in advance part of this loan, in the amount of R$272,811, with funds raised through the issue of Eurobonds in the amount of US$140,000 thousand.
(ii) On November 3, 2006, the Company issued Eurobonds abroad (Eurobonds 2016) in the amount of US$140,000 thousand. The issue was led by Deutsche Bank Trust Company Americas and the principal agent was Deutsche Bank Luxembourg S.A. The interest rate is 7.5% p.a., paid semiannually, and final maturity is in November 2016. As mentioned in (i) above, the funds raised
60
were used to partially settle in advance US$225,000 thousand in the Eurobonds issued, with final maturity in June 2008, and the amount redeemed was US$126,948 thousand.
Due to the payment in advance of Eurobonds 2008, an amendment to the loan agreement was signed cancelling the mandatory calculation of covenants.
Covenants for Eurobonds 2016.
Limitation against incurring new debt so that:
. total debt adjusted to EBITDA does not exceed 3.65
. the Companys debt service coverage ratio, determined on the date this debt was incurred, shall not be lower than 2.35.
(g) Inter-American Development Bank (IDB)
Loan Agreement 229 Entered into in June 1987, in the amount of US$163 million, to finance a sewage program for the Greater São Paulo Metropolitan Area. Semiannual repayments started in January 1994, with annual interest of 7.7% and final maturity in July 2007. In June 1987, the Federative Republic of Brazil signed a guarantee contract with IDB guaranteeing the funds for the fulfillment of the contractual obligations. The last installment was paid in July 2007.
Loan Agreement 713 - In December 1992, the Company signed a loan agreement with the IDB for US$400 million to finance the first stage of the Tietê River Pollution Abatement Project. Semiannual repayments started in June 1999, with final maturity in December 2017. Interest varies according to the cost of loans of the Bank in each six-month period and final maturity in 2017. In December 1992, the Federative Republic of Brazil signed a guarantee contract with the IDB guaranteeing the funds for the fulfillment of the contractual obligations. The outstanding balance as of December 31, 2007 was US$224,688 thousand, R$397,990 (2006 - R$507,974).
Loan Agreement 896 In December 1992, the Company signed a loan agreement with the IDB for US$50 million to finance the first stage of the Tietê River Pollution Abatement Project. Semiannual repayments started in June 1999, with annual interest of 3% and final maturity in December 2016. In December 1992, the Federative Republic of Brazil signed a guarantee contract with the IDB guaranteeing the funds for the fulfillment of the contractual obligations. The outstanding balance as of December 31, 2007 was US$25,000 thousand, R$44,282 (2006 R$59,389).
Loan Agreement 1212 In July 2000, the Company signed a loan agreement with the IDB for US$200 million to finance the second stage of the Tietê River Pollution Abatement Project. The project is in the execution stage. Total amount drawn down in 2007 was US$33,664,000 and the unused balance is US$2,434 thousand. The loan is being repaid semiannually and final maturity is July 2025. Interest is being paid on a semiannual basis, based on daily balances, at an annual variable rate according to the costs of loans of the Bank in the preceding six-month period, plus a spread, and changes every six months. The outstanding balance as of December 31, 2007 was US$182,411 thousand, R$323,105 (2006 R$336,625).
Covenants
. Loan Agreements 713, 896 and 1212 - Tariffs must: a) produce revenues sufficient to cover the systems operating expenses, including administrative, operating, maintenance, and depreciation expenses; b) provide a return on property, plant, and equipment no less than 7%. During project execution, the balances of short-term loans must not exceed 8.5% of shareholders equity.
(h) International Bank for Reconstruction and Development BIRD
Loan Agreement 3504 In March 1993, the State of São Paulo and SABESP signed an onlending agreement to transfer the funds covered by the basic agreement signed between the State of São Paulo and BIRD in December 1992 to finance the environmental clean-up of the Guarapiranga Basin. In December 1992, the Federative Republic of Brazil signed a guarantee contract with the BIRD guaranteeing the funds for the fulfillment of the contra ctual obligations. The agreement was repaid in semiannual installments since October 1997 and the last installment was paid in April 2007.
(i) Japan Bank For International Cooperation (JBIC)
On August 6, 2004, the Company entered into a financing agreement with the JBIC Japan Bank For International Cooperation, guaranteed by the Federal Government, in the amount of ¥21,320 million,
61
equivalent to approximately R$337,687, for the Environmental Recovery Program of the Santos Metropolitan Region. Total financing period is 25 years, with a seven-year grace period and 18 years of repayment in semiannual installments. Interest is being paid on a semiannual basis since 2006, and is 2.5% p.a. for the sewage network and 1.8% p.a. for sewage treatment facilities. The balance of this loan agreement as of December 31, 2007 was R$42,043 (2006 R$11,721).
(j) Covenants
As of December 31, 2007 and 2006, the Company had met all the requirements set forth by its loan and financing agreements.
(k) Maturities of loans and financing
2014 | ||||||||||||||||
2008 | 2009 | 2010 | 2011 | 2012 | 2013 | onward | Total | |||||||||
In local currency | 490,464 | 1,208,383 | 787,837 | 831,493 | 447,961 | 445,678 | 231,131 | 4,442,947 | ||||||||
In foreign currency | 251,650 | 64,764 | 64,764 | 65,900 | 67,037 | 67,037 | 661,136 | 1,242,288 | ||||||||
Total | 742,114 | 1,273,147 | 852,601 | 897,393 | 514,998 | 512,715 | 892,267 | 5,685,235 | ||||||||
11. DEFERRED TAXES
(a) Balance sheet
2007 | 2006 | |||
In current assets (i) | ||||
Deferred income tax | 79,994 | 5,205 | ||
Deferred social contribution tax | 28,798 | 1,873 | ||
108,792 | 7,078 | |||
In long-term assets (ii) | ||||
Deferred income tax | 260,847 | 250,246 | ||
Deferred social contribution tax | 96,379 | 92,408 | ||
357,226 | 342,654 | |||
In current liabilities (iii) | ||||
Deferred PASEP (tax on revenue) | 21,507 | 22,508 | ||
Deferred COFINS (tax on revenue) | 53,742 | 53,851 | ||
75,249 | 76,359 | |||
In noncurrent liabilities (iv) | ||||
Deferred income tax | 66,909 | 63,594 | ||
Deferred social contribution tax | 19,578 | 18,384 | ||
Deferred PASEP | 19,128 | 17,033 | ||
Deferred COFINS | 54,250 | 47,890 | ||
159,865 | 146,901 | |||
2007 | 2006 | |||
In net income | ||||
Income tax | (395,634) | (288,010) | ||
Deferred income tax | 82,075 | 14,539 | ||
(313,559) | (273,471) | |||
Social contribution tax | (147,711) | (95,113) | ||
Deferred social contribution tax | 29,702 | (7,194) | ||
(118,009) | (102,307) | |||
62
(i) In current assets
Calculated substantially based on temporary differences in the amount of R$319,977 (2006 R$20,819).
(ii) In long-term assets
Calculated substantially based on temporary differences in the amount of R$1,043,388 (2006 R$1,000,985) related to income tax and R$1,070,876 (2006 R$1,026,756) related to social contribution tax.
According to a technical feasibility study, the temporary differences mentioned in items (i) and (ii) may be realized in 2008 and 2009.
(iii) Current liabilities
Calculated substantially on billings to government entities, and the obligation is determined and the allowance is recognized when the service is provided, and its settlement when the invoices are received.
(iv) In noncurrent liabilities
-Income and social contribution taxes
Calculated substantially based on temporary differences in the amount of R$267,636 (2006 - R$254,376) related to income tax and R$217,530 (2006 R$204,269) related to social contribution tax.
- PASEP and COFINS
Calculated substantially on billings to government entities, and the obligation is determined and the allowance is recognized when the service is provided, and its settlement when the invoices are received.
(b) Breakdown of deferred income and social contribution taxes
In current assets | 2007 | 2006 | ||
Provision for contingencies | 108,792 | 7,078 | ||
In long-term assets | ||||
Provision for contingencies | 225,697 | 226,265 | ||
Accrued pension obligation | 121,039 | 106,097 | ||
Other | 10,490 | 10,292 | ||
357,226 | 342,654 | |||
Total deferred tax assets | 466,018 | 349,732 | ||
In current assets | 2007 | 2006 | ||
In current liabilities | ||||
Revenue from public entities | 75,249 | 76,359 | ||
In noncurrent liabilities | ||||
Profit from governmental agencies | 86,487 | 81,978 | ||
Revenue from governmental agencies | 73,378 | 64,923 | ||
159,865 | 146,901 | |||
Total deferred tax liabilities | 235,114 | 223,260 | ||
63
(c) Reconciliation of the effective tax rate
The amounts recorded as income and social contribution tax expenses in the financial statements are reconciled to the statutory rates, as shown below:
2007 | 2006 | |||
Income before taxes | 1,480,271 | 1,189,805 | ||
Statutory rate | 34% | 34% | ||
Expected expense at statutory rate | (503,292) | (404,534) | ||
Permanent differences: | ||||
Realization of revaluation reserve | (29,808) | (34,772) | ||
Interest on shareholders equity | 102,253 | 92,086 | ||
Other differences | (721) | (28,558) | ||
Income and social contribution taxes | (431,568) | (375,778) | ||
Current income and social contribution taxes | (543,345) | (383,123) | ||
Deferred income and social contribution taxes | 111,777 | 7,345 | ||
Effective rate | 29% | 32% | ||
12. TAXES PAYABLE
Current | Noncurrent | |||||||
2007 | 2006 | 2007 | 2006 | |||||
Income tax | 4,420 | - | - | - | ||||
Social contribution tax | 5,331 | - | - | - | ||||
COFINS and PASEP | 41,629 | 38,142 | - | - | ||||
PAES (tax debt refinancing program) | 43,918 | 41,897 | 197,635 | 230,440 | ||||
INSS (social security contribution) | 20,072 | 18,230 | - | - | ||||
Other | 12,365 | 7,283 | - | - | ||||
Total | 127,735 | 105,552 | 197,635 | 230,440 | ||||
The Company applied for enrollment in PAES on July 15, 2003, in accordance with Law No. 10684 of May 30, 2003, and included in its application the debts related to COFINS and PASEP which were involved in a legal action challenging application of Law 9718/98, and the outstanding balance under the Tax Recovery Program (REFIS). The total amount included in PAES was R$316,953, as follows:
Tax | Principal | Fine | Interest | Total | ||||
COFINS | 132,499 | 13,250 | 50,994 | 196,743 | ||||
PASEP | 5,001 | 509 | 2,061 | 7,571 | ||||
REFIS | 112,639 | - | - | 112,639 | ||||
Total | 250,139 | 13,759 | 53,055 | 316,953 | ||||
The debt is being paid in 120 months. The amounts paid in 2007 and 2006 were R$43,002 and R$40,824, respectively, recorded as financial expenses of R$12,218 and R$17,646, respectively. The debit balance as of December 31, 2007 was R$241,553. The assets pledged as guarantee under the previous REFIS Program, in the amount of R$249,034, continue to guarantee the PAES Program amounts.
13. PENSION OBLIGATIONS
(a) Health benefit plan
Managed by Fundação SABESP de Seguridade Social SABESPREV, which provides optional, freely-chosen health plans maintained by contributions from the Company (sponsor) and participants, which were as follows:
Company: 7.2% (2006 7.0%) on average on gross payroll;
Participating employees: 3.21% of base salary and premiums, equivalent to 2.3% of gross payroll, on
64
average.
(b) Pension Benefits
The defined-benefit pension plan managed by SABESPREV is supported by monthly contributions amounting to 2.10% from the Company and 2.3% from participants. In order to meet the provisions of CVM Resolution No. 371 of December 13, 2000, the amounts of the pension and retirement benefits granted or to be granted, to which employees are entitled after retirement, are presented below.
As of December 31, 2007, based on the report of the independent actuary calculated under the Projected Unit Credit Method, SABESP had a net actuarial liability of R$365,234 (R$321,212 in 2006) representing the difference between the present value of the Companys obligations to the participating employees, retired employees, and pensioners, and the value of the related assets, as shown below:
(i) Reconciliation of assets and liabilities | 2007 | 2006 | ||
Present value of actuarial obligations | (1,386,563) | (1,096,219) | ||
Fair value of plan assets | 969,440 | 812,909 | ||
Gains to be recognized in future years | 51,889 | (37,902) | ||
Net liabilities | (365,234) | (321,212) | ||
Unrecorded portion of past service liabilities | - | - | ||
Net liabilities recorded in balance sheets | (365,234) | (321,212) | ||
(ii) Expenses recognized in the statements of income | ||||
Cost of current service | 33,440 | 17,545 | ||
Cost of interest | 131,848 | 93,270 | ||
Expected return on plan assets | (96,439) | (83,065) | ||
Amortization of (gain) loss | - | (9,508) | ||
Employees contributions | (12,925) | (15,411) | ||
Amortization of cost of past service | - | 53,214 | ||
Total | 55,924 | 56,045 | ||
(iii) Changes in net actuarial liabilities | ||||
Present value of net actuarial obligation at beginning of year | (321,212) | (276,558) | ||
Cost of current service | (33,440) | (17,545) | ||
Cost of interest | (131,848) | (93,270) | ||
Expected return on plan assets | 96,439 | 83,065 | ||
Amortization of (gain) loss | - | 9,508 | ||
Employees contributions | 12,925 | 15,411 | ||
Amortization of cost of past service | - | (53,214) | ||
(377,136) | (332,603) | |||
Actual Company contributions for the year | 11,902 | 11,391 | ||
Present value of actuarial obligation at end of year | (365,234) | (321,212) | ||
(iv) Changes in fair value of plan assets | ||||
Fair value of plan assets at beginning of year | 812,909 | 678,185 | ||
Actual income from fair value of plan assets | 183,748 | 138,444 | ||
Actual contributions for the year | 24,827 | 26,802 | ||
Benefits paid | (52,044) | (30,522) | ||
Fair value of plan assets at end of year | 969,440 | 812,909 | ||
(v) Changes in present value of liabilities | ||||
Present value of liabilities at beginning of year | 1,096,219 | 790,552 | ||
Current service costs | 33,440 | 17,545 | ||
Interest costs | 131,848 | 93,270 | ||
Benefits paid | (52,044) | (30,522) | ||
Present value of liabilities | 177,100 | 225,374 | ||
Present value of liabilities at end of year | 1,386,563 | 1,096,219 | ||
65
(vi) Estimated expenses | 2008 | 2007 | ||
Cost of current service | 33,347 | 33,440 | ||
Cost of interest | 164,124 | 131,848 | ||
Expected return on plan assets | (117,317) | (96,439) | ||
Amortization of (gain) loss | - | - | ||
Employees contributions | (13,025) | (12,925) | ||
Amortization of cost of past service | - | - | ||
Total | 67,129 | 55,924 | ||
(vii) Actuarial assumptions
Several statistical and other factors that seek to project future events are used in calculating the expense and liability related to the plans. These factors include assumptions about the discount rate, expected return on plan assets and the rate of future salary increases as determined by SABESP, within certain internal guidelines. In addition, the actuary also uses subjective factors such as termination, turnover and mortality rates to estimate these factors. The actuarial assumptions used by SABESP are reviewed on a routine basis and may differ materially from the actual results due to changing market and economic conditions, regulatory events, judicial rulings, higher or lower termination rates or longer or shorter life spans of participants. These differences may result in a significant impact on the amount of pension expense recorded by SABESP.
The assumptions used for the actuarial valuation are the following:
Economic assumptions | 2007 | 2006 | ||
Discount rate | 10.85% p.a. | 12.32% p.a. | ||
Expected rate of return on plan assets | 10.85% p.a. | 12.06% p.a. | ||
Future salary growth rate | 6.08% p.a. | 6.08% p.a. | ||
Increase in social security retirement benefits and limits | 4.00% p.a. | 4.00% p.a. | ||
Capacity factor | ||||
- Salaries | 98% | 98% | ||
- Benefits | 98% | 98% | ||
Demographic assumptions for | 2007 | 2006 | ||
Mortality table | AT 83 | AT 83 | ||
Disability mortality table | RRB 44 | RRB 1944 | ||
Disability table | RRB 44 | Modified RRB 1944 | ||
Turnover table | Prudential | Prudential | ||
First age entitled to one of | First age entitled to one | |||
the benefits | of the benefits | |||
Retirement age | ||||
% of active participants married on theretirement date | 95% | 95% | ||
Age difference between participants and their spouses | Wives are four years | Wives are four years | ||
younger than their | younger than their | |||
husbands | husbands |
For the 2007 actuarial valuation, to conform the study to the current long-term economic circumstances, the Company changed its discount rate to 10.85% per year, from 12.32% per year as a result of an interest rate of 6.59%, plus an annual inflation rate of 4%.
The number of active participants as of December 31, 2007 was 15,881 (16,681 in 2006). The number of beneficiaries, retirees and pensioners as of December 31, de 2007 was 4,245 (3,692 in 2006).
The valuation of the costing plan of SABESPREV is carried out by an independent actuary, and the assumptions used differ from those applied for purposes of calculating employee benefits, established by CVM Resolution No. 371. SABESPREVs technical deficit calculated as of December 31, 2007 amounts to R$319,463 (2006 - R$491,391). Calculations differ substantially in relation to the actuarial method applied for determining risk benefits before retirement age, with the apportionment method used by SABESPREV versus capitalization to comply with CVM Resolution No. 371.
66
Under CVM Resolution No. 371, the Company elected to recognize, starting 2002, for a five-year period, the actuarial liability on the pension plan granted to its employees, determined as of December 31, 2001, in the amount to R$266,074.
As required, the amount related to the past service cost is recorded as Extraordinary item, net of taxes, and it is presented in the statement of income, as follows:
2007 | 2006 | |||
Extraordinary item | - | 53,215 | ||
Deferred income and social contribution taxes | - | (18,093) | ||
Extraordinary item, net | - | 35,122 | ||
Liabilities as of December 31, 2001 | 266,074 | |||
Extraordinary item recorded in the period 2002-2006 | (266,074) |
The Sponsor and SABESPREV initiated negotiations to resolve the technical deficit through the settlement and the migration from the defined benefit plan to the variable contribution plan. Management estimates it will not incur in additional costs as result of the changes in the mentioned plans.
14. PROFIT SHARING
As a result of negotiations held by the Company and the entities representing the employees, the Company implemented a Profit Sharing Program for the period January-December 2007, with the payment of the amount corresponding to up to one months payroll, depending on achievement of targets.
In December 2007, the Company paid an advance R$17,361, and the supplementary payment, if applicable, will be paid in 2008.
In 2007, the Company accrued R$51,351.
15. PROVISION FOR CONTINGENCIES
(a) Lawsuits with probable likelihood of loss
The Company is a party to a number of claims and legal proceedings lawsuits arising in the normal course of business, including civil, labor, environmental, tax and other litigation. The Company recognized provisions for lawsuits at amount considered by Management and its legal counsel as sufficient to cover probable losses. As of December 31, 2007 and 2006, these reserves are presented according to the nature of the corresponding claims, as follows:
2007 | 2006 | |||
Customers (i) | 526,302 | 273,258 | ||
Contractors (ii) | 174,556 | 168,547 | ||
Other civil lawsuits (iii) | 127,890 | 76,909 | ||
Tax (iv) | 34,491 | 21,162 | ||
Labor (v) | 61,747 | 71,213 | ||
Environmental (vi) | 50,075 | 65,988 | ||
Subtotal | 975,061 | 677,077 | ||
Escrow deposits | (29,805) | (19,525) | ||
Total, net of escrow deposits | 945,256 | 657,552 | ||
Current | 290,172 | 2,294 | ||
Noncurrent | 655,084 | 655,258 |
67
Changes in the provision for contingencies for the year ended December 31, 2007 are as follows:
Interest, monetary | ||||||||||
adjustments and | ||||||||||
Dec 06 | Additions | Exclusions | reversals | Dec 07 | ||||||
Customers | 273,258 | 198,570 | (46,408) | 100,882 | 526,302 | |||||
Contractors | 168,547 | 9,838 | (14,863) | 11,034 | 174,556 | |||||
Other civil lawsuits | 76,909 | 36,131 | (26,302) | 41,152 | 127,890 | |||||
Tax | 21,162 | 4,477 | (3,042) | 11,894 | 34,491 | |||||
Labor | 71,213 | 8,112 | (27,102) | 9,524 | 61,747 | |||||
Environmental | 65,988 | 9,827 | (34,281) | 8,541 | 50,075 | |||||
Subtotal | 677,077 | 266,955 | (151,998) | 183,027 | 975,061 | |||||
Escrow deposits | (19,525) | (26,276) | 17,031 | (1,035) | (29,805) | |||||
Total | 657,552 | 240,679 | (134,967) | 181,992 | 945,256 | |||||
During 2007, the Company paid R$145,668, which comprises the provision amount, adjusted through the actual payment date.
(b) Lawsuits with possible likelihood of loss
The ongoing lawsuits at various administrative levels or in courts, in which the Company is a defendant, for which losses are considered by the Companys legal counsel as possible losses, and for which provisions have therefore not been recognized in the financial statements, are as follows:
2007 | 2006 | |||
Customers (i) | 709,000 | 789,300 | ||
Contractors (ii) | 254,100 | 198,500 | ||
Other civil lawsuits (iii) | 195,300 | 141,600 | ||
Tax (iv) | 199,900 | 104,900 | ||
Labor (b) | 70,400 | 43,700 | ||
Environmental (vi) | 514,400 | 192,400 | ||
Total | 1,943,100 | 1,470,400 | ||
(i) Customers
Approximately 1,170 lawsuits were filed by commercial customers, which claim that their tariffs should be equal to the tariffs of another consumer category, and therefore claim the refund of the amounts collected by SABESP. The Company was granted both favorable and unfavorable final decisions at several courts, and recognized a provision when the likelihood of loss is considered probable. In 2007, the Company started a review work to improve the methodology to quantify the lawsuits involving customers, considering the most recent history of favorable and unfavorable court decisions to improve its disbursement estimate. The result of this process evidenced the need to increase the provision by approximately R$253 million, net of exclusions.
(ii) Contractors
Contractors claims include lawsuits filed by some building companies alleging an underpayment of monetary adjustments, withholding of amounts related to the understatement of official inflation rates after the Real economic plan, and the economic and financial imbalance of the agreements. These lawsuits are in progress at different courts and a reserve is recognized when the likelihood of loss is considered probable. The R$55,600 increase in lawsuits whose likelihood of loss is considered possible is related to the inclusion of monetary adjustment, interest and fees for the year.
(iii) Other civil lawsuits
68
The Company is a party to several civil lawsuits related to indemnities for property damage, pain and suffering, and loss of profits allegedly caused to third parties. As of December 31, 2007, the Company recognized provisions of R$127,890 (R$76,909 in 2006) for claims whose likelihood of loss is considered probable. There was an increase both in lawsuits with probable and possible risk of loss, arising from the increase in lawsuits and the review of the expected outcomes, comprising monetary adjustment, interest and fees for the year.
(iv) | Tax |
The provision for tax contingencies refers mainly to issues related to tax collections challenged due to differences in the interpretation of legislation by the Companys legal counsel.
In 2006, the Federal Revenue Service, by means of a tax execution, audited the Companys compliance with the tax obligations related to income and social contribution taxes for calendar 2001, and recognized taxes payable in the amount of R$277 million (R$298 million adjusted through December 31, de 2007). The Company filed a timely objection and will appeal against the tax assessment at administrative level and in courts. According to its legal counsel, the likelihood of loss in approximately 90% of this administrative proceeding is considered remote and 10% possible.
The company filed for an injunction to challenge the revocation of the exemption from tax service granted by the Municipality of São Paulo, under a City Law enacted in 2002. In April 2003, the exemption request was granted under an injunction determining the suspension of tax payments. In May 2005, the courts issued a decision overruling the injunction. In July 2005, SABESP filed an appeal to ensure the injunction granted remained in effect. There is no final decision on the lawsuit, and the likelihood of a favorable outcome is considered possible. Concurrently, on September 18, 2006, the São Paulo Municipal Finance Department issued a tax deficiency notice, against which the Company filed timely administrative objection, with subsequent rejection of the appeal filed with lower courts, whose involved amount is estimated at R$70.0 million (R$120 million as adjusted through December 31, 2007).
The Company filed lawsuits against the Municipalities of Bragança Paulista and São Paulo due to the collection of a charge on the use of public areas to install water and sewage networks used for the water supply and sewage services provided to these municipalities. In the lawsuit filed against the Municipality of Bragança Paulista, the Company was granted a remedy suspending this charge and preventing the Municipality from collecting any current or future amounts related to such charge until there is a final decision on the merit of the lawsuit. In June 2005, the lower court decided favorably to the Company and the initial remedy was maintained. The Municipality appealed against the decision, which is awaiting judgment by the Court of Justice. As regards the lawsuit filed against the Municipality of São Paulo, the lower court issued a decision confirming the legality of the municipal charge. The Company filed an appeal and awaits judgment. Subsequently, a new Law was approved to implement the collection of a charge on the use of public areas in the city of São Paulo. In April 2004, the Company filed for an injunction to suspend the collection of the municipal charge. The injunction was granted by the lower court and confirmed when the decision was issued, which recognizes the charge as undue. The Municipality filed an appeal and is awaiting judgment by the Court of Justice. The Company, based on the assessment of its legal advisors, did not recognize any provision for this municipal charge.
All tax collection proceedings involving the Company and the Municipality of Ferraz de Vasconcelos were reviewed, resulting in an increase of approximately R$39 million, changing the likelihood assessment from remote to possible.
(v) | Labor |
The Company is a party to labor lawsuits, involving issues such as overtime, health hazard premium and hazardous duty premium, prior notice, change of function, salary equalization, and other. Part of
69
the amount involved is in pro visional or final execution at various court levels , and thus is classified as of probable loss and accordingly a provision was recognized.
On October 6, 1989, Sintaema (Union of the Water, Sewage, and Environmental Workers of São Paulo) filed a lawsuit against the Company claiming the payment of salary differences arising from health hazard premium from September 1987 to February 1991. On December 19, 1997, the Superior Labor Court issued a decision unfavorable to SABESP. The Company appealed against this decision, which was maintained by the Superior Labor Court. Sintaema started the execution of the court decision and the court expert report presented on February 21, 2007 determined the payment of R$28,313 (R$30,735 adjusted through December 31, 2007). The Companys legal counsel considered the risk of loss as probable and a provision is recognized as of December 31, 2007.
(vi) | Environmental |
Refers to several administrative proceedings and lawsuits filed by government entities, including Companhia de Tecnologia de Saneamento Ambiental Cetesb and the São Paulo State Public Prosecution Office for the imposition of fines for environmental damages allegedly caused by the Company.
Some of the litigation involving the São Paulo State Public Prosecution Office is as follows:
(a) On April 4, 2002, the Company was included in a public action filed by the District Attorneys Office of São Bernardo do Campo for the remediation of damages caused by slurry discharges made by the Companys water treatment facilities, and demanding de discontinuation of such discharges. The lower court issued a decision favorable to the Company, against which an appeal was lodged. The Court of Justice decided against the Company and ordered it to discontinue discharging waste within one year from the date the decision is considered final, provide environmental remediation within two years after the date set as final, or pay a daily fine of R$10 and compensation for the environmental damage caused. The Companys legal counsel assessed the risk of loss as probable and the reserve recognized represents the adjusted amount of R$163, which reflects the amount attributed to the lawsuit; (b) Public lawsuit filed by the São Paulo State Public Prosecution Office against SABESP to force the Company to discontinue the discharge of untreated sewage in the Borá river or any other river in the Borá municipality, and invest in the water supply and sewage treatment system of the same municipality by building the necessary facilities. The court expert estimated the damages at R$41,022, which is not yet final as there is no court decision on this lawsuit; (c) On February 25, 2003, an environmental public lawsuit was filed by the Public Prosecution Office against SABESP to force the Company to discontinue the discharge of untreated sewage in the Boa Esperança river or any other river in the Lutécia municipality, and invest on the water and sewage treatment system of the same municipality by building the necessary facilities, and pay indemnity for the environmental damages caused. The court expert estimated the damages at R$82,779, which is not yet final as there is no court decision on this lawsuit. These lawsuits (b and c) are at settlement stage with the Public Prosecution Office and the Company recognized a reserve in the amount of the expected disbursement, budgeted in the action plans for the Lutécia municipality at the adjusted amount of R$3,889, related to Reforesting, the Urban Sewage Master Plan, and the Lutécia Sewage System and Recyclable Material Receiving Center; the action plan for the Borá municipality includes the adjusted amount of R$744, which refers to Reforesting, the Urban Sewage Master Plan, and the Resort Recovery and Adaptation. (d) The São Paulo State Public Prosecution Office filed a public lawsuit against SABESP, AES Eletropaulo, Daee, Cetesb and the São Paulo State Finance Department seeking conviction of these entities for the alleged environmental damages caused because of the inversion of the Pinheiros River stream to the Billings Dam. The lower court decision, based on an experts report that estimated damages at R$284,525, jointly convicted the parties to pay this amount, monetarily adjusted since June 2,000 through December 2007, totaling R$491,575. SABESP, Daee, AES Eletropaulo, Cetesb and the State Finance Department filed an appeal with the Appeal Court and are awaiting a decision, as they understand that there is no factual evidence of the damages. There is no guarantee that this joint conviction will be maintained by the Appeal Court. Due to the recent decision, this lawsuit, previously classified as of remote loss, is now assessed by the Companys legal counsel as of possible loss.
70
The Company is a party to other environmental lawsuits in municipalities where it operates, arising from the discharge of untreated waste, assessed as probable and possible risks of loss by its legal counsel. The amounts recognized in reserves do not always represent the final amount to be disbursed as indemnity of alleged damages, in view of the current stage in which the such lawsuits are and Managements incapability to reasonably estimate the amounts of future disbursements. As of December 31, 2007, total provision represents the R$50,075, already including the amounts referred to in items (a), (b) and (c).
(vii) Settlements reached in 2007
a) | The Company reached a settlement with the Municipality of Bragança Paulista related to the tax collection proceeding for the payment of R$13,105, adjusted through December 6, 2007, arising from fines imposed by the City Health Department. The Municipality granted a discount totaling R$4,323 on interest and fine. On December 27, 2007, part of the Municipalitys debt to SABESP was offset against the fines imposed by the Municipality Health Department, in the amount of R$8,782, and the remaining debt balance from unpaid tariffs, in the amount of R$1,080, was divided into 99 installments, monetarily adjusted through the settlement execution date. | |
b) | The Company reached a settlement with the Public Prosecution Office for the construction of the Domestic Sewage Treatment System facilities in the municipality of Boituva and Environmental Compensation within 54 months as from the signature of the settlement, estimated at R$12,776. From this amount, R$3,933 will be built by municipality contractors and R$8,843 will be the responsibilitys of SABESP. | |
c) | The Company reached a settlement with the Public Prosecution Office for the construction of the Domestic Sewage Treatment and Deviation System facilities in the municipality of Santa Cruz do Rio Pardo and Environmental Compensation for the recovery of riverbank forest of the Mandaguari river, which total R$1,250. The start of the riverbank forest recovery project is scheduled for February 2008, to be completed by February 2012. | |
d) | Public lawsuit filed with the Paraguaçu Paulista District (1st Court of Paraguaçu Paulista) seeking compensation for and discontinuation of the environmental damages allegedly caused by the discharge of untreated sewage by Company in the Alegre river, located in the municipality of Paraguaçu Paulista. The lower court judge issued a decision unfavorable to the Company, ordering the Company to: (a) discontinue the discharge of untreated sewage in the Alegre river; (b) invest in the water and sewage treatment systems in the municipality of Paraguaçu Paulista; and (c) paid an indemnity for the remediation of the environmental damages, arbitrated by the court at the adjusted amount of R$168.9 million. The decision also determined that failure to comply with items (a) and (b) above subjects the Company to the payment of daily fines. The Company appealed against the decision; however, the works required to meet items (a) and (b) above are scheduled to end in October 2007. On September 21, 2006, the Companys appeal was judged by the São Paulo State Court of Justice. The Company reached a settlement with the Public Prosecution Office of R$42,789 and 54 months to complete construction, of which R$34,070 refers to compensation for environmental damages. |
(viii) | Other lawsuits related to the Concession |
On December 2, 1997, the Municipality of Santos enacted a law taking over the Companys water and sewage systems in Santos. In response, the Company filed an action seeking an injunction that stayed this takeover. The injunction was denied by the lower court; however, this decision was later overruled by the São Paulo State Court of Justice, which granted an injunction suspending this law. The lower court issued a decision favorable to the Company, and the Municipality of Santos filed an appeal against such decision. This decision was sustained by the Appeal Court; however, it is not final. Despite the pending lawsuit, The Company maintains its water and sewage services to the Santos municipality.
The Municipality of Itapira declared the nullity of the concession agreement and filed a Repossession Action, which was accepted by the court. SABESP filed an appeal against this decision which is
71
pending judgment, and the Company, due to the lawsuit filed against said Municipality, withdrew the appeal because of previous appreciation of the same matter.
The Municipality of Tuiuti filed a declaratory action claiming the recognition of the lack of a legal relationship with SABESP that would allow the Company to continue providing water supply and sewage services in the Tuiuti municipality, and to the determine the takeover by the Municipality of such utility services. SABESP filed a counterclaim to have the existence of a legal relationship between the parties declared and seeking compensation for the investments made. The lawsuit is at fact-finding phase, so that an inspection can be conducted.
The Municipality of Cajobi filed a Repossession Action to regain control over the water supply and sewage services before the agreement termination and termination of the concession, which occurred on November 13, 2006, and the consequent return to the Concession Grantor of all returnable assets, rights and privileges transferred. The action also seeks convicting SABESP to the payment of damages for the amounts received as water supply and sewage tariffs that the Municipality did not receive from the provision of these services, since the enactment of Municipal Decree No. 767, of November 13, 2006 (which provides for the repossession of the services granted), and the use of the concession assets. The Municipality is in charge of these services since May 29, 2007, under a decision granted through a bill of review. The lawsuit is in fact-finding phase.
The Municipality of Monte Alto filed a Repossession Action combined with a claim for damages and declaration of termination of the concession agreement, as it intends to resume the provision of the water supply and sewage services before the termination of the concession, which occurred on October 23, 2006, and the consequent return to the Concession Grantor of all returnable assets and the management of the services under the concession agreement. The injunction was granted by the Fourth Public Law Chamber of the Court of Justice based on the bill of review filed by the Municipality and fulfilled on November 17, 2006. SABESP resumed services for a brief period, but the Municipality managed to take over the services, which it maintains to date. The lawsuit is in fact-finding phase.
The Municipality of Araçoiaba da Serra filed a Repossession Action to obtain an injunction that authorized the Municipality to enter the facilities related to the concession, including all the chattels and properties related to the water supply and sewage services, and start to manage, operate and exploit such services, before the termination of the concession on September 23, 2006. At the end, the Municipality claims the definite repossession, ensuring the return of all the assets, rights and privileges previously transferred to SABESP. The injunction was initially granted and afterward maintained by the Appeal Court, granting the Municipality the right to remain in charge of the services. In addition, SABESP filed for an interlocutory injunction requiring evidence be produced in advance. The lawsuit is in fact-finding phase.
16. SHAREHOLDERS EQUITY
(a) | Authorized capital |
The Company is authorized to increase capital up to the limit of R$4,100,000, based on a Board of Directors resolution and after s ubmission to the Supervisory Board.
In case of a capital increase, issue of convertible debentures and/or share warrants though private placement, the shareholders shall have preemptive rights proportional to the number of shares held at the time, in compliance with Article 171 of Law No. 6404/76.
(b) | Reverse stock split |
The Shareholders Meeting held on April 30, 2007, approved the reverse stock split proposal. The shares were grouped at the ratio of 125-for-1 and since June 4, 2007 are traded in Brazilian reais per share. Capital started to be represented by 227,836,623 registered common shares, without par value, and SABESPs capital remains unchanged.
Concurrently with the reverse stock split, the American Deposit Receipts (ADRs) started to be traded at the ratio of 1 ADR for each to 2 shares.
72
(c) | Subscribed and paid-up capital |
Subscribed and paid -up capital is represented by 227,836,623 common shares, without par value, distributed as follows:
2007 | 2006 | |||||||
Shareholders |
Number of shares | % | Number of shares | % | ||||
São Paulo State Finance | ||||||||
Department | 114,508,087 | 50.26 | 14,313,511,867 | 50.26 | ||||
Companhia Brasileira de | ||||||||
Liquidação e Custódia | 61,690,601 | 27.08 | 7,722,535,287 | 27.11 | ||||
The Bank Of New York ADR | ||||||||
Department (equivalent in shares)(*) | 51,409,636 | 22.56 | 6,415,657,250 | 22.53 | ||||
Other | 228,299 | 0.10 | 27,873,423 | 0.10 | ||||
227,836,623 | 100.00 | 28,479,577,827 | 100.00 | |||||
(*) each ADR is equivalent to 2 shares
(d) | Distribution of earnings |
Shareholders are entitled to a mandatory minimum dividend of 25% of net income, calculated in conformity with Brazilian corporate law. Approved dividends are not subject to interest and amounts unclaimed within three years after the Shareholders' Meeting that approved such date are transferred to the Company.
Mandatory minimum dividends are calculated as follows:
Net income | 1,048,703 | |
(-) Legal reserve 5% | 52,435 | |
Net income | 996,268 | |
Mandatory minimum dividend | 249,067 | |
In 2007, the Company paid interest on shareholders equity attributed to dividends in the amount of R$279,494, net of withholding income tax in the amount of R$21,250. In 2006 the amount paid was R$251,238, net of income tax of R$19,603. Interest on shareholders equity was calculated in conformity with article 9 of Law No. 9249/95, at the Long-term Interest Rate (TJLP); this interest was originally recorded in Financial expenses for income and social contribution tax deductibility purposes and subsequently, for presentation purposes, was reflected directly in Shareholders equity.
(e) | Capital reserve |
Comprises tax incentives and donations from government entities and private entities, totaling R$17,565 in 2007 (R$27,870 in 2006).
(f) | Profit reserves |
(i) | Allocation of net income |
2007 | 2006 | |||
1 - Net income | 1,048,703 | 778,905 | ||
(+) Realization of revaluation reserve | 87,670 | 102,272 | ||
(-) Interest on shareholders equity | 300,744 | 270,841 | ||
(-) Legal reserve 5% | 52,435 | 38,946 | ||
Investment reserve | 783,194 | 571,390 | ||
2 Management will propose to the Shareholders' Meeting the transfer of the retained earnings balance of R$783,194 to the Investment reserve account, to cover the needs of investments with own funds, as planned in the Capital Budget. Concurrently, it will send a proposal for the
73
capitalization of part of the profit reserves, in the amount of R$2,800,000, as this reserve exceeds capital.
After the capitalization of the profit reserve, capital will be R$6,203,688.
(ii) | Investment reserve |
Comprised specifically of internal funds for expansion of water supply and sewage service systems.
17. INSURANCE COVERAGE
Insurance policies held by the Company provide the following coverage, taking into account the risks and nature of assets, as follows:
Type of insurance | Insured amount R$ | Premium | ||
(*) | (*) | |||
Engineering risk | 288,494 | 644 | ||
Fire | 307,743 | 331 | ||
Civil liability - Directors & Officers | 80,000 | 3,000 | ||
Civil liability - construction in progress | 11,051 | 482 | ||
Civil liability operating | 1,500 | 160 |
(*) Unaudited information
The Company does not have an environmental and loss of profits insurance.
18. FINANCIAL INSTRUMENTS AND RISKS
In accordance with CVM Instruction No. 235/95, the Company estimated the fair value of their financial instruments, using available market information and appropriate estimation methodologies. However, considerable judgment is required to interpret market data and to develop the estimates of fair value. Accordingly, the estimates presented are not necessarily indicative of the amounts that could be realized in a current market exchange. The use of different market assumptions and/or valuation methodologies may have a material effect on the estimated fair values.
As of December 31, 2007, the carrying amounts and fair values of the main financial instruments are as follows:
Carrying | Unrealized gain | |||||
amount | Fair value | (loss) | ||||
Temporary cash investments (i) | 392,164 | 392,164 | - | |||
Loans and financing (ii) | (5,685,235) | (5,702,906) | (17,671) | |||
Market debts (ii a) | (2,188,953) | (2,206,624) | (17,671) | |||
Institutional debts (ii b) | (3,496,282) | (3,496,282) | - | |||
(5,293,071) | (5,310,742) | (17,671) | ||||
(a) Fair value of financial instruments
The Companys main asset and liability financial instruments as of December 31, 2007 are described below, as well as their measurement criteria:
(i) Temporary cash investments The fair value of these assets approximates the amounts stated in the Companys balance sheets.
(ii) Loans and financing Liability financial instruments are divided into two groups:
a. | Market debts Debts incurred to obtain funds in the market to cover possible cash requirements of the Company. The financial instruments composing this group are debentures, bonds and FIDC (Receivables Investment Funds), placed in the
financial market through book building or similar procedures, in which yield rates demanded by investors are defined at the time of negotiation. |
|
The fair value measurement criteria adopted by the Company for these financial instruments was the UP (unit price) average-deviation method used in the last negotiations, in 2007, carried out in the secondary market in relation to the average UP in the curve. |
74
COMPANHIA DE SANEAMENTO BÁSICO DO ESTADO DE SÃO PAULO - SABESP |
NOTES TO THE FINANCIAL STATEMENTS |
For the Years Ended December 31, 2007 and 2006 |
(Amounts in thousands of Brazilian reais - R$, unless otherwise stated) |
The information necessary for this measurement was extracted from the following sources: SND Sistema Nacional de Debêntures (National Debenture System), BovespaFix and Bloomberg. | ||
b. | Institutional debts Debts incurred for the purpose of financing a project related to SABESPs corporate purpose: water supply and sewage works. |
|
This financing has long-term features, at specific interest rates defined by development agencies (Caixa Econômica Federal, National Bank for Economic and Social Development, Fehidro), and multilateral agencies (IDB, BIRD, JBIC), which
prevents us from measuring this financing at fair value. |
(b) | Exchange rate risk |
This risk arises from the possibility that the Company may incur in losses due to exchange rate fluctuations, which would increase the liability balances of foreign currency-denominated loans and financing obtained in the market and the related financial expenses. The Company does not have hedge or swap contracts to hedge against this risk, in view of the amounts, costs involved and opportunities. However, when possible, it makes advance purchases of foreign currencies and obtains funding in local currency, as a way to protect itself against exchange rate fluctuations.
A significant portion of the Companys debt is pegged to the US dollar, the euro and other foreign currencies, totaling R$1,242,288 (Note 10). The Companys net exposure to the exchange rate risk as of December 31, 2007 is summarized as follows:
In thousands | ||||
US$ | Japanese Yen | |||
Loans and financing | 670,151 | 2,654,422 | ||
(c) | Interest rate risk |
This risk arises from the possibility that the Company may incur losses due to interest rate fluctuations and indices that increase their interest expenses on loans and financing. The Company has not entered into any derivative contract to hedge against this risk; however, it continually monitors market interest rates, in order to evaluate the possible need to replace its debt. As of December 31, 2007, the Company had R$1,021,118 in loans and financing which were obtained at variable interest rates (CDI and TJLP).
Another risk faced by the Company is the lack of correlation between the monetary adjustment indices of its debt and those of its receivables. Water supply and sewage treatment tariffs do not necessarily follow the increases in the interest rates affecting the Companys debt.
(d) | Credit risk |
Credit risk is mitigated by selling to a geographically dispersed customer base.
19. GROSS REVENUE
2007 | 2006 | |||
Metropolitan São Paulo area | 4,888,077 | 4,534,093 | ||
Regional systems (i) | 1,560,134 | 1,449,919 | ||
Total | 6,448,211 | 5,984,012 | ||
(i) Comprises municipalities operated in São Paulo State inland and coastal regions.
75
20. OPERATING EXPENSES
2007 | 2006 | |||
Cost of sales and services: | ||||
Payroll and related charges | 970,065 | 966,751 | ||
General supplies | 121,821 | 117,872 | ||
Treatment supplies | 112,339 | 104,466 | ||
Outsourced services | 384,114 | 326,422 | ||
Electricity | 472,525 | 446,974 | ||
General expenses | 31,316 | 32,560 | ||
Depreciation and amortization | 603,516 | 621,719 | ||
2,695,696 | 2,616,764 | |||
Selling expenses: | ||||
Payroll and related charges | 158,338 | 159,094 | ||
General supplies | 5,373 | 5,276 | ||
Outsourced services | 88,585 | 80,467 | ||
Electricity | 736 | 768 | ||
General expenses | 58,554 | 58,946 | ||
Depreciation and amortization | 4,627 | 2,716 | ||
Allowance for doubtful accounts, net of recoveries | 323,339 | 411,918 | ||
639,552 | 719,185 | |||
Administrative expenses: | ||||
Payroll and related charges | 137,267 | 132,554 | ||
General supplies | 4,621 | 4,574 | ||
Outsourced services | 66,300 | 79,379 | ||
Electricity | 1,218 | 1,119 | ||
General expenses | 291,803 | 118,646 | ||
Depreciation and amortization | 14,406 | 17,736 | ||
Tax expenses | 43,575 | 33,399 | ||
559,190 | 387,407 | |||
Costs, and selling and administrative expenses: | ||||
Payroll and related charges | 1,265,670 | 1,258,399 | ||
General supplies | 131,815 | 127,722 | ||
Treatment supplies | 112,339 | 104,466 | ||
Outsourced services | 538,999 | 486,268 | ||
Electricity | 474,479 | 448,861 | ||
General expenses | 381,673 | 210,152 | ||
Depreciation and amortization | 622,549 | 642,171 | ||
Tax expenses | 43,575 | 33,399 | ||
Allowance for doubtful accounts, net of recoveries | ||||
5 (c(ii)) | 323,339 | 411,918 | ||
3,894,438 | 3,723,356 | |||
Financial expenses: | ||||
Interest and other charges on loans and financing - local currency | 447,046 | 517,547 | ||
Interest and other charges on loans and financing - foreign currency | 66,329 | 121,194 | ||
Interest on shareholders equity - 16 (f(i)) | 300,744 | 270,841 | ||
Reversal of interest on shareholders equity (reversal) | (300,744) | (270,841) | ||
Other financial expenses | 69,287 | 38,649 | ||
Income tax on remittance abroad | 6,346 | 12,564 | ||
Monetary variation on loans and financing | 101,310 | 86,594 | ||
Other monetary variations | 8,059 | 10,937 | ||
Reserves for financing contingencies | 183,027 | (2,675) | ||
881,404 | 784,810 | |||
76
2007 | 2006 | |||
Financial income: | ||||
Monetary variation gains | 34,281 | 28,475 | ||
Income from temporary cash investments | 51,469 | 50,882 | ||
Interest and other | 46,659 | 46,590 | ||
132,409 | 125,947 | |||
Financial result, net | 748,995 | 658,863 | ||
Exchange variations, net: | ||||
Exchange variation on loans and financing | (188,411) | (96,071) | ||
Other exchange varia tion | 87 | - | ||
Exchange gains | 286 | 473 | ||
(188,038) | (95,598) | |||
21. SEGMENT INFORMATION
The Company reports two identifiable segments: (i) water supply systems; and (ii) sewage collection systems.
2007 | ||||||
Water | Sewage | |||||
systems | systems | Total | ||||
Gross revenue from sales and services - retail | 3,325,826 | 2,724,400 | 6,050,226 | |||
Gross revenue from sales wholesale | 291,705 | 8,002 | 299,707 | |||
Other revenue from sales and services | 64,359 | 33,919 | 98,278 | |||
3,681,890 | 2,766,321 | 6,448,211 | ||||
Deductions from gross revenue | (272,575) | (204,794) | (477,369) | |||
Net revenue from sales and services | 3,409,315 | 2,561,527 | 5,970,842 | |||
Cost of sales and services and operating expenses | (2,534,679) | (1,359,759) | (3,894,438) | |||
Income from operations before financial expenses | ||||||
and exchange variation, net | 874,636 | 1,201,768 | 2,076,404 | |||
2006 | ||||||
Water | Sewage | |||||
systems | systems | Total | ||||
Gross revenue from sales and services retail | 3,093,122 | 2,530,796 | 5,623,918 | |||
Gross revenue from sales whosale | 265,298 | 1,870 | 267,168 | |||
Other revenue from sales and services | 60,738 | 32,188 | 92,926 | |||
3,419,158 | 2,564,854 | 5,984,012 | ||||
Deductions from gross revenue | (241,885) | (214,794) | (456,679) | |||
Net revenue from sales and services | 3,177,273 | 2,350,060 | 5,527,333 | |||
Cost of sales and services and operating expenses | (2,460,178) | (1,263,178) | (3,723,356) | |||
Income from operations before financial expenses | ||||||
and exchange variation, net | 717,095 | 1,086,882 | 1,803,977 | |||
22. MANAGEMENT COMPENSATION
Compensation paid by the Company to its directors and officers totaled R$2,373 and R$3,084 as of December 31, 2007 and 2006, respectively.
23. COMMITMENTS
(i) | Rentals |
Operating, administrative and property leases already contracted require the following minimum payments, as follows:
77
2008 | 7,844 | |
2009 | 2,456 | |
2010 | 660 | |
2011 | 314 | |
TOTAL | 11,274 | |
Lease expenses for the years ended December 31, 2007 and 2006 were R$8,214 and R$9,810, respectively. Lease expenses refer to the following: property rentals, machinery and equipment leases, IT equipment leases, and photocopiers leases.
(ii) | Electricity |
The Company has entered into long-term agreements with electricity suppliers. The main amounts regarding these agreements are as follows:
2008 | 182,008 | |
2009 | 128,947 | |
2010 | 128,164 | |
2011 | 133,367 | |
2012 | 133,730 | |
2013 | 78 | |
2014 | 39 | |
TOTAL | 706,333 | |
Electricity expenses for the years ended December 31, 2007 and 2006 were R$474,762 and R$449,089, respectively. Form these amounts, R$474,479 (R$448,861 in 2006) was accounted for under expenses and R$283 (R$228 in 2006) under investments.
24. AGREEMENT WITH THE MUNICIPALITY OF SÃO PAULO
On November 14, 2007, the Company and the Municipality of São Paulo (the Parties) entered into an Agreement to establish the conditions that ensure the stability in the provision of water supply and sewage, and environmental utility services in the city of São Paulo, the main provisions of which are as follows:
1. | the Parties made the commitment to take basic sanitation and environmental actions, complementary to the actions of the Municipality of São Paulo, by investing in the deployment and continuity of programs such as: Programa Córrego Limpo (Clean River Program) and Programa de Uso Racional da Água PURA (Rational Water Use Program), the purpose of which is to ensure a decrease in water consumption by City government units, ensuring water supply to and the quality of living of the population; | |
2. | starting November 14, 2007, Agreement date, all the amounts paid by the Municipality of São Paulo to SABESP, referring to consumptio n by City departments, agencies, and foundations, net of taxes, will be used in basic sanitation and environmental actions in the municipality; | |
3. | the Municipality made the commitment to resume the payment of consumption bills issued by SABESP, starting Nove mber 14, 2007, date of this Agreements execution; | |
4. | the Parties shall complete, within 90 days, the projects required to determine the outstanding amounts and prepare the drafts of the Bill to obtain the approval of the City Council to the Cooperation Agreement and Metropolitan Program Contract, to ensure the stable provision by SABESP of water supply and sewage services in the municipality, through associated management of the assumed utility services, jointly by the Municipality and the State of São Paulo, pursuant to the general basic sanitation service principles laid down in State Law 11,445/2007 and related State legislation; | |
5. | the Parties and the State shall conclude, within 90 days after the execution of the Agreement, the terms and conditions of the Cooperation Agreement and Metropolitan Program Contract, to ensure the stable provision by SABESP of water supply and sewage services in the municipality; |
78
6. | the approval of Municipal Authorization Law is an essential condition both for signing the Cooperation Agreement, to be signed by the Municipality and the State of São Paulo , and the Metropolitan Program Contract, to be signed by the Municipality and SABESP; | |
7. | after the Bill is submitted to the City Council, the Parties will enter into an instrument from settlement of outstanding debts. A discount in the amount of R$120 million on the Citys debts will be granted, under contract. These debts will be paid free of financial charges arising from interest, fines and monetary adjustment, and part of the debts shall be paid by December 2008 and the rest under Municipal Interdepartmental Administrative Rule 01/2005, in seven annual installments; | |
8. | the Parties shall require the termination of the collection lawsuits filed by SABESP, where SABESP shall pay the court fees, and each Party shall pay the lawyers fees, in an estimated amount of R$1.9 million. | |
The First Amendment to the Agreement with the Municipality of São Paulo was entered into on February 10, 2008 (nota 27(II)). |
25. CONCESSIONS
As mentioned in Note 1, in 2007 a new regulatory framework was established for the sanitation industry, after the approval of the Sanitation Law and the Law that creates the São Paulo State Sanitation and Power Regulatory Agency (Arsesp).
Consistently with the regulatory framework, SABESP tried to build a new relationship with the municipalities, which resulted in the renewal of 106 agreements and 124 authorization laws approved by city councils.
In addition to program contracts, the municipalities entered into with the São Paulo State Government, cooperation agreements that permitted delegating service regulation and inspection to ARSESP.
Program Contracts
The purpose of the program contracts entered into by the municipalities and the Company, under the terms and conditions set forth by the Cooperation Agreements entered into by the São Paulo State Government and the municipalities, is the provision of municipal utility water supply and sewage services, exclusively by SABESP, over a thirty-year period, which can be renewed for an equal period.
i) Tariff
The service price arrangement shall based on a tariff, adjusted every 12 months, based on the index based on the variation of SABESP costs (IRT Tariff Adjustment Index) approved by ARSESP. Connections to municipal buildings shall be classified under the public use category and shall enjoy this categorys tariff benefits.
ii) Economic and financial balance
Both the tariff and the economic and financial terms and conditions of the contracts shall be reviewed every four years to ensure the full amortization and payment of investments, and operating, management, maintenance and service expansion costs.
iii) Debt settlement
SABESP shall collect past-due debts on unpaid water supply and sewage services.
iv) Exemption from municipal taxes
The Company shall be exempt from municipal taxes levied on operating areas and facilities.
v) Regulation and inspection
The regulation and inspection of water supply and sewage services delegated by the Municipalities shall be carried out by the State Service Regulatory Agency.
vi) Contract termination
79
Upon contract termination, if the cash flows from services do not allow the full payment of the investments made, including investments existing prior to the Program Contract, the Municipality can elect one of the following compensation method:
a) | maintain the contract and the cooperation agreement for the period required for payment an amortization; | |
b) | resume services by paying to SABESP the corresponding compensation; | |
c) | formalize an a greement for the payment in installments of the compensation due; |
SABESP shall continue providing the services under the same terms of the contract, respecting the agreed economic and financial balance, until the actual payment of the compensation.
vii) Returnable assets
All assets existing prior to the program contracts are controlled, managed and owned by SABESP, and those acquired or built during contract effectiveness, attached or indispensable to the provision of the services, whose ownership and management shall be assigned to SABESP, are an integral part of the water supply and sewage services.
viii) Compensation criteria
The compensation payable by the Municipality to SABESP shall be equivalent to the present value of cash flows for the remainin g period on the date services are resumed by the Municipality, based on a business valuation report of the contract, monetarily adjusted, plus interest through payment date. These contracts can also be measured at book value and other rights and possible losses may also be collected.
26. AMENDMENT TO BRAZILIAN CORPORATE LAW, EFFECTIVE JANUARY 2008
On December 28, 2007, Law No. 11,638 was enacted, altering, revoking and adding new provisions to the Brazilian Corporate Law, especially with respect to chapter XV, Fiscal Year and Financial Statements. This Law is effective for fiscal years beginning on or after January 1, 2008 and was designed primarily to update the Brazilian Corporate Law, so as to enable the convergence of Brazilian accounting practices with international accounting standards (IFRS) and allow the Brazilian Securities Commission (CVM) to issue new accounting standards and procedures, in conformity with such international accounting standards.
The changes in Brazilian Corporate Law are applicable to all companies incorporated as corporations, including public companies, and introduce a new requirement for large companies to prepare and report financial statements in accordance with provisions of the Brazilian Corporate Law. Furthermore, private companies may choose to prepare such financial statements in accordance with standards issued by the CVM.
Certain of these changes shall be applied as of the beginning of the Companys fiscal year while others are subject to regulation by regulatory agencies.
The main changes are summarized as follows:
80
effectively benefit earnings in future periods and that do not simply represent future cost reductions or increases in future operational efficiencies.
Even though the Company already adopts some of these changes, such as, for example, disclosure of the statements of cash flows and value added, and the segregation of intangible assets in permanent assets, the Companys Management did not assess all the effects that such changes might have on its financial statements and results of operations for the following years, as these changes have only been introduced recently, and some of them are still subject to regulation by regulatory agencies.
27. SUBSEQUENT EVENTS
I - Commitment Agreement entered into by the State of São Paulo and SABESP
On March 26, 2008, the State of São Paulo, through the Finance Department and the Sanitation and Energy Department, and SABESP entered into a Commitment Agreement for the settlement of outstanding debts related to the reimbursement of pension benefits.
Even though the State acknowledges its debts related to the pension benefits, the State disagrees with the criteria adopted by SABESP to grant and pay the benefits, based on the legal opinions issued by the State Attorney General, which restrict State actions and prevent the voluntary reimbursement of all amounts paid by SABESP.
From SABESPs standpoint, the criteria adopted in the past to grant and pay pension benefits were correct, as they were based on specific State authorizations or then effective legal opinions.
The prolongation of the disputes between the State and SABESP is the main reason why the parties did not manage until now to fully implement the provisions of the São Paulo State Government Agreement, described in note 6 (iii).
Based on preliminary information gathered, under the calculation and eligibility criteria agreed by the State, SABESP estimates a Indisputable Reimbursement of approximately R$936 million, which comprises monetary adjustment based on the IPCA (Extended Consumer Price Index) (R$605.3 in notional amounts). The amount paid by SABESP was R$1,422.8 million, adjusted based on the IPCA (R$879.0 in notional amounts).
The parties agree that this discrepancy should not represent an obstacle to the implementation of the commitments made in the São Paulo State Go vernment Agreement Nota 6 (iii) regarding the Indisputable Reimbursement.
SABESP shall contract Fipecafi, within 30 days after the Commitment Agreement date, to conclude the validation of the Indisputable Reimbursement and the Controversial Amount, estimated by
81
SABESP, as well as other firms to perform a new evaluation of the Reservoirs that might be transferred to SABESP as amortization of the reimbursement payable by the State. The amount of the Indisputable Reimbursement shall be added of the monthly variation of the IPCA from the month of each disbursement made by SABESP to the month the determination work is completed.
Once the amount of the Indisputable Reimbursement is determined and validated by the parties, and the new evaluation of the reservoirs is concluded, the State shall initiate the 30-day period for payment of the Indisputable Reimbursement, as provided for by the São Paulo State Government Agreement, in 114 monthly, consecutive installments, including the annual IPCA variation, plus interest of 6% per year.
The State confirms it is willing to assume the responsibility for the processing and direct payment of the benefits if SABESP succeeds in reversing the court decision that requires the Company to keep paying the pension benefits, under the current terms and conditions. While the current court decision is not overruled, the State shall transfer to SABESP the cash required to pay the indisputable amount of the monthly due benefits.
SABESP shall not waive the receivables from the State to which the Company considers itself to be legally entitled. Accordingly, it will take all possible actions to resolve the issue at all technical and court levels. Should this dispute persist, the Company will take all the necessary actions to protect the Companys interests.
Based on preliminary calculation, considering the reimbursement of the Indisputable Amount by the São Paulo State Government, estimated at approximately R$936.0 million, representing 66% of the amount paid by SABESP and considering, among other aspects, the need to recognize an actuarial liability to reflect the right to benefits that will be paid in the future, the estimated impact on the Companys results of operations as of December 31, 2007 would be R$513 million, approximately.
No amounts were accrued for loss or the benefits that will be paid in the future as the likelihood of receiving the outstanding amounts and resolving the existing disputed favorably to the Company is highly probable. This expectation is based, in addition to an internal analysis by the Companys staff, on an outside legal opinion, which concludes, after carefully analyzing the matter, that the likelihood of a favorable outcome in a possible recourse action filed by the Company is highly probable. According to this opinion, the circumstances under which the payment of the benefits was made imposes to the São Paulo State Government the duty of reimbursing the Company, since the Company, as the employer, was merely a co -obligator. The analysis of the main disputes allow us to conclude that the criteria adopted by the Company in the past to grant and pay the benefits are reasonable, as they were built based on specific guidance of the São Paulo State Government.
II First Amendment to the Agreement with the Municipality of São Paulo
On February 10, 2008, the Parties decided to extend the agreement for a period equal to the original period, so that the Parties may conclude the required understandings to settle the outstanding debts and prepare the drafts of the Cooperation Agreement, the Metropolitan Contract Program, and the Authorization Bill.
The stages already in progress are the conclusion of the drafts of said instruments, sending the Bill to the City Council, concluding the required understandings to settle the outstanding debts, and jointly defining the sanitation and environmental actions to be taken.
28. SUPPLEMENTAL INFORMATION
a) | Statement of Cash Flow |
The statements of cash flows reflect the financing, investing, and operating activities of the Company derived from the accounting records prepared in conformity with Brazilian corporate law, and which are presented in conformity with IAS 7 Statements of Cash Flows.
82
Note | 2007 | 2006 | ||||
Cash flows from operating activities: | ||||||
Net income | 1,048,703 | 778,905 | ||||
Adjustments to reconcile net income (loss) to net cash: | ||||||
Deferred taxes | (104,432) | (8,473) | ||||
Provision for contingencies | 477,722 | 144,480 | ||||
Reversal of the provision for loss | (945) | (8,819) | ||||
Other provisions | 155 | 7,504 | ||||
Pension obligation | 59,931 | 60,070 | ||||
Write -off of property, plant and equipment | 8(b) | 68,349 | 47,807 | |||
Write -off of deferred charges | 1,276 | 5,195 | ||||
Write -off of investments | - | 20 | ||||
Gain on sale of property, plant and equipment | 219 | (1,294) | ||||
Depreciation and amortization | 20 | 622,549 | 642,171 | |||
Interest on loans and financing payable | 519,672 | 619,909 | ||||
Monetary and exchange variations on loans and financing | (87,101) | (9,477) | ||||
Monetary variation on interest on shareholders equity | 4,462 | - | ||||
Interest and monetary variation expense | 12 | 12,218 | 17,646 | |||
Interest and monetary variation income | (21,121) | (16,549) | ||||
Allowance for doubtful accounts | 5(c(ii)) | 323,339 | 411,918 | |||
Adjusted net income | 2,924,996 | 2,691,013 | ||||
Changes in assets: | ||||||
Trade accounts receivable | (400,944) | (458,824) | ||||
Transactions with related parties | (81,741) | (151,343) | ||||
Inventories | (3,307) | (12,851) | ||||
Recoverable taxes | 22,168 | (30,729) | ||||
Other assets | (22,877) | (14,671) | ||||
Escrow deposits | 9,706 | (21,012) | ||||
Changes in liabilities: | ||||||
Accounts payable to suppliers and contractors | (14,055) | 50,176 | ||||
Payroll and related charges | (10,908) | 60,416 | ||||
Taxes payable | (22,840) | (43,899) | ||||
Services received | 4,034 | 45,293 | ||||
Other liabilities | (27,055) | 2,472 | ||||
Contingencies | (145,668) | (79,801) | ||||
Pension plan | (15,909) | (15,416) | ||||
Cash flow from operating activities | 2,215,600 | 2,020,824 | ||||
Cash flow from investing activities: | ||||||
Purchase of property, plant and equipment | (848,878) | (842,454) | ||||
Increase in intangible assets | (32,818) | (12,630) | ||||
Sale of property, plant and equipment | - | 7,837 | ||||
Increase in deferred charges | - | (2,789) | ||||
Net cash used in investing activities | (881,696) | (850,036) | ||||
Cash flows from financing activities | ||||||
Loans and Financing long-term: | ||||||
Funding | 222,474 | 706,774 | ||||
Repayments | (1,283,201) | (1,660,482) |
83
Note | 2007 | 2006 | ||||
Payment of interest on shareholders equity | (136,386) | (169,047) | ||||
Net cash used in financing activities | (1,197,113) | (1,122,755) | ||||
Increase in cash and cash equivalents | 136,791 | 48,033 | ||||
Cash and cash equivalents at beginning of year | 328,206 | 280,173 | ||||
Cash and cash equivalents at end of year | 464,997 | 328,206 | ||||
Change in cash and cash equivalents | 136,791 | 48,033 | ||||
Supplementary cash flow information: | ||||||
Interest and fees paid on loans and financing | 548,417 | 637,989 | ||||
Capitalization of interest and financial charges | 8(c) | (13,338) | 5,784 | |||
Income and social contribution taxes paid | 499,318 | 404,272 | ||||
Property, plant and equipment received as donations | 17,565 | 27,870 | ||||
COFINS and PASEP paid | 472,060 | 440,883 | ||||
Legal agreements | 34,071 | - | ||||
National Water Agency Program | 16,219 | - | ||||
Purchase of property, plant and equipment payable | 35,154 | 16,210 |
84
b) | Statements of Value Added. |
2007 | % | 2006 | % | |||||
1 Revenues | ||||||||
1.1) Sales of products and services | 6,448,211 | 5,984,012 | ||||||
1.2) Write -off of receivables/Allowance for doubtful | (323,339) | (411,918) | ||||||
1.3) Nonoperating items | (28,658) | (48,638) | ||||||
6,096,214 | 5,523,456 | |||||||
2 Inputs purchased from third parties | ||||||||
2.1) Raw materials consumed | 112,339 | 104,466 | ||||||
2.2) Cost of sales and services | 996,473 | 911,569 | ||||||
2.3)Materials, electric energy, outside services and other | 510,503 | 341,367 | ||||||
1,619,315 | 1,357,402 | |||||||
3 - Gross value added (1 -2) | 4,476,899 | 4,166,054 | ||||||
4 Retentions (depreciation/amortization) | 622,549 | 642,171 | ||||||
5 - Net value added produced by the Company (3 -4) | 3,854,350 | 3,523,883 | ||||||
6 Value received from third parties: | ||||||||
6.1) Financial income | 132,123 | 125,474 | ||||||
7 Total undistributed value added (5+6) | 3,986,473 | 100.0 | 3,649,357 | 100.0 | ||||
Distribution of Value Added | ||||||||
- Personnel | 1,100,481 | 27.6 | 1,144,264 | 31.4 | ||||
- Payroll and related charges | 993,959 | 24.9 | 1,009,307 | 27.7 | ||||
- Employee profit sharing | 47,734 | 1.2 | 75,974 | 2.1 | ||||
- Accrued pension obligation | 58,788 | 1.5 | 58,983 | 1.6 | ||||
- Government | 1,136,948 | 28.6 | 1,035,912 | 28.4 | ||||
- Federal | 1,123,592 | 28.2 | 1,032,702 | 28.3 | ||||
- State | 2,332 | 0.1 | 2,014 | 0.1 | ||||
- Municipal | 11,024 | 0.3 | 1,196 | 0.0 | ||||
- Interest on debt | 700,341 | 17.5 | 690,276 | 18.9 | ||||
- Interest | 686,734 | 17.2 | 676,175 | 18.5 | ||||
- Rentals | 13,607 | 0.3 | 14,101 | 0.4 | ||||
- Interest on shareholders equity and dividends | 300,744 | 7.5 | 270,841 | 7.4 | ||||
- Retained earnings | 747,959 | 18.8 | 508,064 | 13.9 |
85
(Convenience Translation into English from the Companhia de Saneamento Financial Statements for the Years Ended Deloitte Touche Tohmatsu Auditores Independente |
(Convenience Translation into English from the Original Previously Issued in Portuguese)
INDEPENDENT AUDITORS REPORT
To the Management and Shareholders of
Companhia de Saneamento Básico do Estado de São Paulo - SABESP
São Paulo - SP
1. We have audited the accompanying balance sheets of Companhia de Saneamento Básico do Estado de São Paulo - SABESP (the Company) as of December 31, 2007 and 2006, and the related statements of income, changes in shareholders equity, and changes in financial position for the years then ended, all expressed in Brazilian reais and prepared under the responsibility of Companys management. Our responsibility is to express an opinion on these financial statements.
2. Our audits were conducted in accordance with auditing standards in Brazil and comprised: (a) planning of the work, taking into consideration the significance of the balances, volume of transactions, and the accounting and internal control systems of the Company, (b) checking, on a test basis, the evidence and records that support the amounts and accounting information disclosed, and (c) evaluating the significant accounting practices and estimates adopted by Management, as well as the presentation of the financial statements taken as a whole.
3. In our opinion, the financial statements referred to in paragraph 1 present fairly, in all material respects, the financial position of Companhia de Saneamento Básico do Estado de São Paulo - SABESP as of December 31, 2007 and 2006, and the results of its operations, the changes in shareholders equity, and the changes in its financial position for the years then ended, in conformity with Brazilian accounting practices.
4. Our audits were conducted for the purpose of forming an opinion on the basic financial statements referred to in paragraph 1, taken as a whole. The accompanying statements of cash flows and value added, for the years ended December 31, 2007 and 2006, are presented for purposes of additional analysis and are not a required part of the basic financial statements in conformity with Brazilian accounting practic es. Such information has been subjected to the auditing procedures described in paragraph 2 and, in our opinion, is fairly stated, in all material respects, in relation to the basic financial statements for the years ended December 31, 2007 and 2006, taken as a whole.
87
5. As mentioned in notes 6 and 27 to the financial statements, the Company is negotiating with the São Paulo State Government the reimbursement of the amounts for supplementary retirement and pension paid by the Company.
6. As mentioned in note 24 to the financial statements, on November 14, 2007, the Company entered into an agreement with the São Paulo Municipal Government, seeking stability in the provision of services in the municipality of São Paulo and establishment of sanitation and environmental actions supplementary to the actions taken by the Municipality.
7. The accompanying financial statements have been translated into English for the convenience of readers outside Brazil.
São Paulo, March 27, 2008
DELOITTE TOUCHE TOHMATSU | Marco Antonio Brandão Simurro | |
Auditores Independentes | Engagement Partner |
88
Companhia de Saneamento Básico do Estado de São Paulo - SABESP |
||
By: |
/S/ Rui de Britto Álvares Affonso
|
|
Name: Rui de Britto Álvares Affonso
Title: Chief Financial Officer and Investor Relations Officer |
This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates of future economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.